找回密碼
 To register

QQ登錄

只需一步,快速開始

掃一掃,訪問微社區(qū)

打印 上一主題 下一主題

Titlebook: Managing the Continuum: Certainty, Uncertainty, Unpredictability in Large Engineering Projects; Franco Caron Book 2013 The Author(s) 2013

[復(fù)制鏈接]
樓主: 葉子
11#
發(fā)表于 2025-3-23 10:15:31 | 只看該作者
Real Options,Contrary to the traditional system engineering approach, which optimizes a fixed design based on a set of fixed specifications, once the system and its objectives are defined, the Real Option approach recognizes that changes are inevitable over time and purposefully introduces flexibility into the project in order to address them.
12#
發(fā)表于 2025-3-23 15:52:45 | 只看該作者
Introduction to Project Risk,All projects are risky ventures since they are unique and temporary undertakings based on assumptions about the future, affected by risks and subject to the influence of multiple stakeholders.
13#
發(fā)表于 2025-3-23 18:12:08 | 只看該作者
Project Risk Management,The process of project risk management aims at implementing suitable response actions for each single major risk that has been identified. To do this, we need a systematic approach to provide a comprehensive set of effective actions otherwise we will only be able to rely on the experience and imaginative capacity of the risk owner.
14#
發(fā)表于 2025-3-23 22:46:58 | 只看該作者
https://doi.org/10.1007/978-88-470-5244-4Project Complexity; Project Flexibility; Project Management; Risk Management; quality control, reliabili
15#
發(fā)表于 2025-3-24 06:01:03 | 只看該作者
Introduction,g economic performance, technical functionality, social acceptability, environmental sustainability, political legitimacy and economic development. Such projects need large capital investment, have long time horizons and often use non-standard technology.
16#
發(fā)表于 2025-3-24 08:10:23 | 只看該作者
Large Engineering Projects Strategy,eir complex and uncertain environment and adapt their execution strategy to the ongoing changes. As a consequence, LEPs cannot be defined once and for all, rather they are shaped progressively from the initial concept by the dialectical interaction of stakeholders.
17#
發(fā)表于 2025-3-24 12:03:18 | 只看該作者
Project Risk Analysis,o happen? what are the potential consequences if it does happen? In the succeeding phase risk management tries to answer such questions as: what can we do to respond to risks? what should we do? What should be the results of our actions?
18#
發(fā)表于 2025-3-24 15:36:29 | 只看該作者
Quantitative Analysis of Project Risks,rovides insights into the joint impact of the overall uncertainty—both risk events and parameter variability—on the project. The focus moves from the single risk to the overall riskiness of the project.
19#
發(fā)表于 2025-3-24 22:15:52 | 只看該作者
20#
發(fā)表于 2025-3-25 03:02:54 | 只看該作者
Franco CaronIntegrated view of subjects normally addressed separately i.e. project issues, project risks, unexpected events.Rigorously explains risk consideration in project planning, this capable to supplement e
 關(guān)于派博傳思  派博傳思旗下網(wǎng)站  友情鏈接
派博傳思介紹 公司地理位置 論文服務(wù)流程 影響因子官網(wǎng) 吾愛論文網(wǎng) 大講堂 北京大學(xué) Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點(diǎn)評(píng) 投稿經(jīng)驗(yàn)總結(jié) SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學(xué) Yale Uni. Stanford Uni.
QQ|Archiver|手機(jī)版|小黑屋| 派博傳思國際 ( 京公網(wǎng)安備110108008328) GMT+8, 2025-10-14 15:18
Copyright © 2001-2015 派博傳思   京公網(wǎng)安備110108008328 版權(quán)所有 All rights reserved
快速回復(fù) 返回頂部 返回列表
冷水江市| 栾川县| 江山市| 穆棱市| 甘洛县| 平定县| 罗平县| 麟游县| 海丰县| 建昌县| 缙云县| 灵石县| 腾冲县| 沈丘县| 高雄县| 平武县| 河津市| 新建县| 潼关县| 会理县| 阿图什市| 平乐县| 分宜县| 澎湖县| 金堂县| 榕江县| 长顺县| 岑巩县| 济宁市| 仪征市| 宜兴市| 驻马店市| 芜湖县| 扶风县| 新密市| 广平县| 葵青区| 高陵县| 吉水县| 禄劝| 睢宁县|