找回密碼
 To register

QQ登錄

只需一步,快速開(kāi)始

掃一掃,訪問(wèn)微社區(qū)

打印 上一主題 下一主題

Titlebook: The Management of CAD for Construction; Stanley Port Book 1989 t2 Solutions Ltd 1989 Plot.computer-aided design (CAD).construction.data ex

[復(fù)制鏈接]
查看: 37308|回復(fù): 35
樓主
發(fā)表于 2025-3-21 19:29:51 | 只看該作者 |倒序?yàn)g覽 |閱讀模式
書(shū)目名稱(chēng)The Management of CAD for Construction
編輯Stanley Port
視頻videohttp://file.papertrans.cn/914/913548/913548.mp4
圖書(shū)封面Titlebook: The Management of CAD for Construction;  Stanley Port Book 1989 t2 Solutions Ltd 1989 Plot.computer-aided design (CAD).construction.data ex
描述In the era of Information Technology, the computer is the machine-tool. Designers and planners are information workers and many have turned to CAD technology, hoping to find something that will ensure survival in the increasingly competitive business climate. The new problem relates not to any limitations of systems, but to the lack of knowledge on how to implement, manage and control the CAD technology. This book is aimed at design professionals, planners and managers. Although references and examples relate to building and construction work, most of the principles are unlikely to differ whatever the application. As a result, it should be useful in the fields of mechanical engineering and manufacturing industry too. Chapter 13 deals with applications in construction planning, space planning and facilities management. Emphasis throughout is on people, responsibilities, applications, organisation and procedures. The design process is highly interactive. Manual drawing, or use of a computer drafting system to mimic this, inevitably leads to inconsistencies within in the design information. Computer modelling of projects presents better opportunities and the many techniques range from
出版日期Book 1989
關(guān)鍵詞Plot; computer-aided design (CAD); construction; data exchange; database; layout; mechanical engineering; m
版次1
doihttps://doi.org/10.1007/978-1-4684-6605-8
isbn_ebook978-1-4684-6605-8
copyrightt2 Solutions Ltd 1989
The information of publication is updating

書(shū)目名稱(chēng)The Management of CAD for Construction影響因子(影響力)




書(shū)目名稱(chēng)The Management of CAD for Construction影響因子(影響力)學(xué)科排名




書(shū)目名稱(chēng)The Management of CAD for Construction網(wǎng)絡(luò)公開(kāi)度




書(shū)目名稱(chēng)The Management of CAD for Construction網(wǎng)絡(luò)公開(kāi)度學(xué)科排名




書(shū)目名稱(chēng)The Management of CAD for Construction被引頻次




書(shū)目名稱(chēng)The Management of CAD for Construction被引頻次學(xué)科排名




書(shū)目名稱(chēng)The Management of CAD for Construction年度引用




書(shū)目名稱(chēng)The Management of CAD for Construction年度引用學(xué)科排名




書(shū)目名稱(chēng)The Management of CAD for Construction讀者反饋




書(shū)目名稱(chēng)The Management of CAD for Construction讀者反饋學(xué)科排名




單選投票, 共有 0 人參與投票
 

0票 0%

Perfect with Aesthetics

 

0票 0%

Better Implies Difficulty

 

0票 0%

Good and Satisfactory

 

0票 0%

Adverse Performance

 

0票 0%

Disdainful Garbage

您所在的用戶組沒(méi)有投票權(quán)限
沙發(fā)
發(fā)表于 2025-3-21 23:27:47 | 只看該作者
Book 1989hnology, hoping to find something that will ensure survival in the increasingly competitive business climate. The new problem relates not to any limitations of systems, but to the lack of knowledge on how to implement, manage and control the CAD technology. This book is aimed at design professionals
板凳
發(fā)表于 2025-3-22 00:44:26 | 只看該作者
地板
發(fā)表于 2025-3-22 07:48:19 | 只看該作者
5#
發(fā)表于 2025-3-22 09:41:34 | 只看該作者
t2 Solutions Ltd 1989
6#
發(fā)表于 2025-3-22 14:31:29 | 只看該作者
Book 1989nisation and procedures. The design process is highly interactive. Manual drawing, or use of a computer drafting system to mimic this, inevitably leads to inconsistencies within in the design information. Computer modelling of projects presents better opportunities and the many techniques range from
7#
發(fā)表于 2025-3-22 19:38:51 | 只看該作者
ions, organisation and procedures. The design process is highly interactive. Manual drawing, or use of a computer drafting system to mimic this, inevitably leads to inconsistencies within in the design information. Computer modelling of projects presents better opportunities and the many techniques range from978-1-4684-6605-8
8#
發(fā)表于 2025-3-22 23:13:15 | 只看該作者
8樓
9#
發(fā)表于 2025-3-23 01:23:33 | 只看該作者
9樓
10#
發(fā)表于 2025-3-23 07:04:01 | 只看該作者
10樓
 關(guān)于派博傳思  派博傳思旗下網(wǎng)站  友情鏈接
派博傳思介紹 公司地理位置 論文服務(wù)流程 影響因子官網(wǎng) 吾愛(ài)論文網(wǎng) 大講堂 北京大學(xué) Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點(diǎn)評(píng) 投稿經(jīng)驗(yàn)總結(jié) SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學(xué) Yale Uni. Stanford Uni.
QQ|Archiver|手機(jī)版|小黑屋| 派博傳思國(guó)際 ( 京公網(wǎng)安備110108008328) GMT+8, 2025-10-7 07:25
Copyright © 2001-2015 派博傳思   京公網(wǎng)安備110108008328 版權(quán)所有 All rights reserved
快速回復(fù) 返回頂部 返回列表
榕江县| 定结县| 镇原县| 灵台县| 大田县| 水城县| 南召县| 日照市| 龙游县| 宜川县| 阿拉善右旗| 左贡县| 化州市| 张北县| 万宁市| 车致| 邻水| 平罗县| 夏津县| 钟山县| 汪清县| 凤凰县| 永善县| 综艺| 武川县| 朝阳市| 金华市| 广昌县| 普兰县| 佛坪县| 达孜县| 元阳县| 新建县| 剑阁县| 通城县| 涡阳县| 新邵县| 永丰县| 南充市| 穆棱市| 壤塘县|