找回密碼
 To register

QQ登錄

只需一步,快速開始

掃一掃,訪問微社區(qū)

打印 上一主題 下一主題

Titlebook: Reliability Evaluation of Power Systems; Roy Billinton,Ronald N. Allan Book 1984 Roy Billinton and Ronald N Allan 1984 education.engine.mo

[復(fù)制鏈接]
樓主: antithetic
11#
發(fā)表于 2025-3-23 11:25:58 | 只看該作者
y Pitman Books in January 1983. As a sequel, this book is intended to be considered and read as the second of two volumes rather than as a text that stands on its own. For this reason, readers who are not familiar with basic reliability modelling and evaluation should either first read the companion
12#
發(fā)表于 2025-3-23 16:22:37 | 只看該作者
13#
發(fā)表于 2025-3-23 20:08:53 | 只看該作者
,Generating capacity—basic probability methods,ion of the actual capacity required to meet a given load level. Both these areas must be examined at the planning level in evaluating alternative facilities; however, once the decision has been made, the short-term requirement becomes an operating problem. The assessment of operating capacity reserves is illustrated in Chapter 5.
14#
發(fā)表于 2025-3-24 00:57:37 | 只看該作者
Interconnected systems,nefits depend on the installed capacity in each system, the total tie capacity, the forced outage rates of the tie lines, the load levels and their residual uncertainties in each system and the type of agreement in existence between the systems [4].
15#
發(fā)表于 2025-3-24 04:46:59 | 只看該作者
Operating reserve,ion plant. Once this capacity is scheduled and spinning, the operator is committed for the period of time it takes to achieve output from other generating plant; this time may be several hours in the case of thermal units but only a few minutes in the case of gas turbines and hydroelectric plant.
16#
發(fā)表于 2025-3-24 07:35:33 | 只看該作者
17#
發(fā)表于 2025-3-24 14:08:45 | 只看該作者
18#
發(fā)表于 2025-3-24 16:34:34 | 只看該作者
Introduction,as possible. Modern society, because of its pattern of social and working habits, has come to expect the supply to be continuously available on demand. This is not physically possible in reality due to random system failures which are generally outside the control of power system engineers. The prob
19#
發(fā)表于 2025-3-24 20:45:28 | 只看該作者
,Generating capacity—basic probability methods,d operation. The total problem can be divided into two conceptually different areas designated as static and operating capacity requirements. The static capacity area relates to the long-term evaluation of this overall system requirement. The operating capacity area relates to the short-term evaluat
20#
發(fā)表于 2025-3-25 01:55:54 | 只看該作者
 關(guān)于派博傳思  派博傳思旗下網(wǎng)站  友情鏈接
派博傳思介紹 公司地理位置 論文服務(wù)流程 影響因子官網(wǎng) 吾愛論文網(wǎng) 大講堂 北京大學(xué) Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點(diǎn)評(píng) 投稿經(jīng)驗(yàn)總結(jié) SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學(xué) Yale Uni. Stanford Uni.
QQ|Archiver|手機(jī)版|小黑屋| 派博傳思國際 ( 京公網(wǎng)安備110108008328) GMT+8, 2025-10-8 20:16
Copyright © 2001-2015 派博傳思   京公網(wǎng)安備110108008328 版權(quán)所有 All rights reserved
快速回復(fù) 返回頂部 返回列表
禄丰县| 阳新县| 凤庆县| 仁化县| 修文县| 中超| 赫章县| 库伦旗| 清镇市| 桃源县| 白朗县| 银川市| 耒阳市| 河西区| 米泉市| 黔东| 堆龙德庆县| 阿拉尔市| 嘉义县| 柯坪县| 华亭县| 钟山县| 确山县| 突泉县| 达孜县| 滨州市| 米泉市| 梅河口市| 通榆县| 志丹县| 灵寿县| 新干县| 彩票| 湛江市| 呈贡县| 平谷区| 海安县| 榆林市| 贵阳市| 鹤山市| 河源市|