找回密碼
 To register

QQ登錄

只需一步,快速開(kāi)始

掃一掃,訪問(wèn)微社區(qū)

打印 上一主題 下一主題

Titlebook: Johnstown’s Flood of 1889; Power Over Truth and Neil M. Coleman Book 2019 Springer International Publishing AG, part of Springer Nature 201

[復(fù)制鏈接]
樓主: Combat
31#
發(fā)表于 2025-3-26 21:43:43 | 只看該作者
The Viaduct,am breach floods, foretelling the calamity that was about to descend on the villages and boroughs downriver. Collapse of the viaduct released a surge of floodwater with a peak discharge rate of ~7090 to 8060 m.?s.. A remnant of the viaduct still survives and reveals how it was built. Also, an import
32#
發(fā)表于 2025-3-27 02:47:57 | 只看該作者
Investigation by the ASCE Committee (Francis et al. 1891) and the Fate of their Report,-art report was completed seven months after the disaster but was then sealed. Its publication was prevented or delayed by three Presidents of ASCE: Max Becker, William Shinn, and Octave Chanute. They were mainly railroad and steel men. Shinn was a former managing partner of Andrew Carnegie at the E
33#
發(fā)表于 2025-3-27 06:14:43 | 只看該作者
34#
發(fā)表于 2025-3-27 13:16:54 | 只看該作者
Analysis of the South Fork Dam and the Former Lake Conemaugh,n 1889 were compared with the modern GPS reference frame. They differ by ~6.2?ft. (1.9?m), the 1889 data being systematically lower. At the moment the dam breached in 1889, the surface of Lake Conemaugh had an elevation in the range of ~492.5 to 492.6 m. Using LiDAR data and this lake stage, a stora
35#
發(fā)表于 2025-3-27 16:41:17 | 只看該作者
Hydraulic Calculations,failed even had it been repaired as originally built in the 1850’s. Analysis I have added a sentence below to call out the footnote there.?(This research relies on nineteenth century publications and more recent works that document historic data using English units rather than SI units. For most of
36#
發(fā)表于 2025-3-27 19:05:06 | 只看該作者
37#
發(fā)表于 2025-3-27 22:07:06 | 只看該作者
38#
發(fā)表于 2025-3-28 02:18:59 | 只看該作者
The Forgotten Dam: The Eastern Reservoir at Hollidaysburg and Its Role in Canal History, Mountains. After years of delays the dam was completed in 1847, but by the 1850’s it was already rendered obsolete by the construction of a continuous rail route across the state. In 1857 the canal system and the Eastern Dam were sold to the Pennsylvania Railroad. The dam was intentionally notched
39#
發(fā)表于 2025-3-28 07:28:33 | 只看該作者
ed, there is no consensus on the methodology used to research EGT and HGT, making comparisons between studies difficult. However, some patterns are beginning to emerge and the central role of EGT in plastid establishment is now being shifted toward a shared role between EGT, HGT, and contributions b
40#
發(fā)表于 2025-3-28 13:42:12 | 只看該作者
 關(guān)于派博傳思  派博傳思旗下網(wǎng)站  友情鏈接
派博傳思介紹 公司地理位置 論文服務(wù)流程 影響因子官網(wǎng) 吾愛(ài)論文網(wǎng) 大講堂 北京大學(xué) Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點(diǎn)評(píng) 投稿經(jīng)驗(yàn)總結(jié) SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學(xué) Yale Uni. Stanford Uni.
QQ|Archiver|手機(jī)版|小黑屋| 派博傳思國(guó)際 ( 京公網(wǎng)安備110108008328) GMT+8, 2025-10-8 02:11
Copyright © 2001-2015 派博傳思   京公網(wǎng)安備110108008328 版權(quán)所有 All rights reserved
快速回復(fù) 返回頂部 返回列表
西乌| 铅山县| 兴安盟| 威信县| 灵璧县| 壶关县| 当阳市| 甘泉县| 治县。| 临澧县| 安丘市| 徐闻县| 枞阳县| 横峰县| 鄂伦春自治旗| 贡嘎县| 合山市| 普定县| 洪湖市| 阜阳市| 苗栗县| 犍为县| 桐庐县| 广灵县| 大竹县| 阳泉市| 星子县| 昌黎县| 威海市| 塔城市| 铜陵市| 靖西县| 磴口县| 蒙山县| 秦皇岛市| 桂东县| 张掖市| 嘉定区| 湖北省| 奉节县| 古丈县|