找回密碼
 To register

QQ登錄

只需一步,快速開(kāi)始

掃一掃,訪問(wèn)微社區(qū)

打印 上一主題 下一主題

Titlebook: How Megaprojects Are Damaging Nigeria and How to Fix It; A Practical Guide to Jimoh Ibrahim,Christoph Loch,Kishore Sengupta Book‘‘‘‘‘‘‘‘ 20

[復(fù)制鏈接]
樓主: 夸大
31#
發(fā)表于 2025-3-26 23:33:15 | 只看該作者
Jimoh Ibrahim,Christoph Loch,Kishore Senguptamote and mysterious to many scientists as they are to most laymen. This book endeavours to remedy the situation: an attempt has been made to provide, in readily comprehensible form, a nucleus of information essential to anyone embarking on the study of bacteriophages or using them in their work for
32#
發(fā)表于 2025-3-27 03:44:51 | 只看該作者
33#
發(fā)表于 2025-3-27 08:13:14 | 只看該作者
34#
發(fā)表于 2025-3-27 10:47:12 | 只看該作者
Introduction: The Project Abandonment Problem,y large projects did not just “fail” but were abandoned, leaving ruins behind. Nigeria has no systematic data on what has been spent, but the sums are clearly huge—the 38 projects alone that this investigation considers in detail represent a total budget of over $25B, almost equalling Nigeria’s tota
35#
發(fā)表于 2025-3-27 14:42:36 | 只看該作者
What We Know About the Management of Very Large Projects, and one can get them wrong in a hundred different ways. So existing frameworks contain many success variables. This study is based on this knowledge—it is unlikely that in the Nigerian context, forces are at work which have never been observed anywhere else before. But not all the influence factors
36#
發(fā)表于 2025-3-27 20:51:57 | 只看該作者
Structure of the Investigation,people involved in each of 38 projects (19 abandoned, and 19 completed). The projects are matched by sector and size to allow comparisons, and three respondents per project reduce biases..While quantitative data allows “objective” statistical analysis, 11 of the projects were in addition described i
37#
發(fā)表于 2025-3-28 01:45:14 | 只看該作者
Insights from the Analysis of the Questionnaires,rst compresses the 41 questionnaire variables (which contain duplication for robustness sake) into 5 success factors. Then, regressions identify which success factors drive the probability of project completion and which factors drive budget and schedule overruns (for the completed projects)..The ec
38#
發(fā)表于 2025-3-28 03:36:15 | 只看該作者
39#
發(fā)表于 2025-3-28 09:17:15 | 只看該作者
Two Bridge Projects,od business cases. But the Second Niger Bridge became a pawn of political promises, had insufficient financial assurances and then was stalled after a government change. The Third Mainland Bridge had also been stalled and was rescued by the (military) President for idiosyncratic reasons, but then ru
40#
發(fā)表于 2025-3-28 11:48:31 | 只看該作者
Two Power Plants,t supported the project (which had a strong value proposition) and saw it through..The second project, the Calabar Power Plant, was a part of a large highly ambitious scheme to build 11 power plants, which ran out of money as well as neglecting critical components of the network surrounding a plant
 關(guān)于派博傳思  派博傳思旗下網(wǎng)站  友情鏈接
派博傳思介紹 公司地理位置 論文服務(wù)流程 影響因子官網(wǎng) 吾愛(ài)論文網(wǎng) 大講堂 北京大學(xué) Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點(diǎn)評(píng) 投稿經(jīng)驗(yàn)總結(jié) SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學(xué) Yale Uni. Stanford Uni.
QQ|Archiver|手機(jī)版|小黑屋| 派博傳思國(guó)際 ( 京公網(wǎng)安備110108008328) GMT+8, 2025-10-7 17:27
Copyright © 2001-2015 派博傳思   京公網(wǎng)安備110108008328 版權(quán)所有 All rights reserved
快速回復(fù) 返回頂部 返回列表
随州市| 龙游县| 武平县| 南康市| 海盐县| 汝州市| 房产| 沙河市| 中西区| 融水| 太康县| 额尔古纳市| 广元市| 新宁县| 阜平县| 自治县| 承德县| 镇沅| 望城县| 晋城| 德格县| 新民市| 大关县| 红桥区| 上饶市| 西藏| 巍山| 含山县| 四川省| 汉阴县| 广昌县| 高唐县| 荔浦县| 织金县| 尼木县| 银川市| 徐水县| 馆陶县| 睢宁县| 商丘市| 垫江县|