找回密碼
 To register

QQ登錄

只需一步,快速開(kāi)始

掃一掃,訪(fǎng)問(wèn)微社區(qū)

打印 上一主題 下一主題

Titlebook: ;

[復(fù)制鏈接]
樓主: Stimulant
21#
發(fā)表于 2025-3-25 06:49:59 | 只看該作者
22#
發(fā)表于 2025-3-25 07:57:23 | 只看該作者
23#
發(fā)表于 2025-3-25 15:11:29 | 只看該作者
https://doi.org/10.1007/978-3-658-36756-5tage, process planning and manufacture to the assembly. In process planning, which represents the most important link between development and manufacture, the drawings and parts lists prepared by the design department are converted into machining-orientated instructions in the form of operational charts.
24#
發(fā)表于 2025-3-25 18:57:06 | 只看該作者
https://doi.org/10.1007/978-3-658-42268-4is very much in the foreground. In the case of factories where the GT-manufacturing system has been successfully introduced, this problem factor has been the subject of special discussion, because it has an important influence on the success of the degree of rationalization.
25#
發(fā)表于 2025-3-25 23:19:23 | 只看該作者
Introduction,ns to be made on this subject was put forward by Mitrofanov [1]. With the increasing possibilities of being able to analyse and evaluate the resultant data with the aid of electronic data processing equipment, this method is becoming a practicable solution.
26#
發(fā)表于 2025-3-26 02:21:00 | 只看該作者
27#
發(fā)表于 2025-3-26 07:19:43 | 只看該作者
28#
發(fā)表于 2025-3-26 12:16:41 | 只看該作者
Parts Design, most work-intensive activities within the product design field of mechanical engineering. Attempts were therefore made at a very early stage to rationalize this crucial point. For that purpose the following methods are generally known
29#
發(fā)表于 2025-3-26 16:13:08 | 只看該作者
Process Planning,tage, process planning and manufacture to the assembly. In process planning, which represents the most important link between development and manufacture, the drawings and parts lists prepared by the design department are converted into machining-orientated instructions in the form of operational charts.
30#
發(fā)表于 2025-3-26 19:38:42 | 只看該作者
Wage Structure,is very much in the foreground. In the case of factories where the GT-manufacturing system has been successfully introduced, this problem factor has been the subject of special discussion, because it has an important influence on the success of the degree of rationalization.
 關(guān)于派博傳思  派博傳思旗下網(wǎng)站  友情鏈接
派博傳思介紹 公司地理位置 論文服務(wù)流程 影響因子官網(wǎng) 吾愛(ài)論文網(wǎng) 大講堂 北京大學(xué) Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點(diǎn)評(píng) 投稿經(jīng)驗(yàn)總結(jié) SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學(xué) Yale Uni. Stanford Uni.
QQ|Archiver|手機(jī)版|小黑屋| 派博傳思國(guó)際 ( 京公網(wǎng)安備110108008328) GMT+8, 2025-10-6 13:05
Copyright © 2001-2015 派博傳思   京公網(wǎng)安備110108008328 版權(quán)所有 All rights reserved
快速回復(fù) 返回頂部 返回列表
那坡县| 微博| 德惠市| 保德县| 额济纳旗| 东兰县| 岐山县| 沙河市| 宜章县| 南皮县| 浑源县| 绥滨县| 禄丰县| 峨山| 始兴县| 博湖县| 乌审旗| 郧西县| 沐川县| 锡林郭勒盟| 新津县| 龙陵县| 永平县| 景宁| 饶阳县| 军事| 太谷县| 星座| 西昌市| 盐源县| 临武县| 临邑县| 泸溪县| 潢川县| 荔浦县| 佛教| 巩义市| 五峰| 滁州市| 龙陵县| 建昌县|