找回密碼
 To register

QQ登錄

只需一步,快速開(kāi)始

掃一掃,訪(fǎng)問(wèn)微社區(qū)

打印 上一主題 下一主題

Titlebook: ;

[復(fù)制鏈接]
樓主: Stimulant
21#
發(fā)表于 2025-3-25 06:49:59 | 只看該作者
22#
發(fā)表于 2025-3-25 07:57:23 | 只看該作者
23#
發(fā)表于 2025-3-25 15:11:29 | 只看該作者
https://doi.org/10.1007/978-3-658-36756-5tage, process planning and manufacture to the assembly. In process planning, which represents the most important link between development and manufacture, the drawings and parts lists prepared by the design department are converted into machining-orientated instructions in the form of operational charts.
24#
發(fā)表于 2025-3-25 18:57:06 | 只看該作者
https://doi.org/10.1007/978-3-658-42268-4is very much in the foreground. In the case of factories where the GT-manufacturing system has been successfully introduced, this problem factor has been the subject of special discussion, because it has an important influence on the success of the degree of rationalization.
25#
發(fā)表于 2025-3-25 23:19:23 | 只看該作者
Introduction,ns to be made on this subject was put forward by Mitrofanov [1]. With the increasing possibilities of being able to analyse and evaluate the resultant data with the aid of electronic data processing equipment, this method is becoming a practicable solution.
26#
發(fā)表于 2025-3-26 02:21:00 | 只看該作者
27#
發(fā)表于 2025-3-26 07:19:43 | 只看該作者
28#
發(fā)表于 2025-3-26 12:16:41 | 只看該作者
Parts Design, most work-intensive activities within the product design field of mechanical engineering. Attempts were therefore made at a very early stage to rationalize this crucial point. For that purpose the following methods are generally known
29#
發(fā)表于 2025-3-26 16:13:08 | 只看該作者
Process Planning,tage, process planning and manufacture to the assembly. In process planning, which represents the most important link between development and manufacture, the drawings and parts lists prepared by the design department are converted into machining-orientated instructions in the form of operational charts.
30#
發(fā)表于 2025-3-26 19:38:42 | 只看該作者
Wage Structure,is very much in the foreground. In the case of factories where the GT-manufacturing system has been successfully introduced, this problem factor has been the subject of special discussion, because it has an important influence on the success of the degree of rationalization.
 關(guān)于派博傳思  派博傳思旗下網(wǎng)站  友情鏈接
派博傳思介紹 公司地理位置 論文服務(wù)流程 影響因子官網(wǎng) 吾愛(ài)論文網(wǎng) 大講堂 北京大學(xué) Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點(diǎn)評(píng) 投稿經(jīng)驗(yàn)總結(jié) SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學(xué) Yale Uni. Stanford Uni.
QQ|Archiver|手機(jī)版|小黑屋| 派博傳思國(guó)際 ( 京公網(wǎng)安備110108008328) GMT+8, 2025-10-6 13:05
Copyright © 2001-2015 派博傳思   京公網(wǎng)安備110108008328 版權(quán)所有 All rights reserved
快速回復(fù) 返回頂部 返回列表
安丘市| 桐梓县| 诸城市| 塔河县| 牡丹江市| 夏邑县| 绵竹市| 巴马| 黄龙县| 福清市| 凉山| 龙岩市| 福海县| 上犹县| 贞丰县| 北宁市| 濮阳市| 佛坪县| 石柱| 偏关县| 湘乡市| 白水县| 体育| 宿迁市| 诸城市| 通城县| 永兴县| 芜湖市| 襄樊市| 宁陵县| 曲松县| 台江县| 南木林县| 巴里| 郸城县| 龙泉市| 永州市| 平阳县| 交口县| 深泽县| 天气|