Titlebook: Civil Engineering: Supervision and Management; A. C. Twort,J. Gordon Rees Book 1995 AC Twort and J Gordon Rees 1995 civil engineering.conc

[復制鏈接]
查看: 32443|回復: 50
樓主
發(fā)表于 2025-3-21 17:18:40 | 只看該作者 |倒序瀏覽 |閱讀模式
書目名稱Civil Engineering: Supervision and Management
編輯A. C. Twort,J. Gordon Rees
視頻videohttp://file.papertrans.cn/227/226881/226881.mp4
圖書封面Titlebook: Civil Engineering: Supervision and Management;  A. C. Twort,J. Gordon Rees Book 1995 AC Twort and J Gordon Rees 1995 civil engineering.conc
描述This book covers methods adopted for undertaking the design and construction of civil engineering projects. The options for separate design and construction are compared with design and build projects, construction management, and man- agement contracting. The salient differences are shown between the various con- ditions of contract used. The roles of the engineer, employer‘s project manager or his representative under different forms of contract are compared. Requirements for the production of contract documents, specifications, tendering procedures and choice of contractor are set out. The engineer‘s powers and the duties of his resident engineer on the site of con- struction are considered in detail. Records, filing systems, programme and progress charts used by the resident engineer are illustrated, and advice is given on the handling of safety problems and difficult situations on site. Problems of measurement and billing of quantities according to the civil engi- neering standard method are described. Correct procedures for setting rates for varied work, payment for method-related items, and handling claims for unfore- seen conditions under ICE Clause 12 are given. Difficulti
出版日期Book 1995
關鍵詞civil engineering; concrete; hospital
版次1
doihttps://doi.org/10.1007/978-1-4613-1153-9
isbn_softcover978-1-4612-8451-2
isbn_ebook978-1-4613-1153-9
copyrightAC Twort and J Gordon Rees 1995
The information of publication is updating

書目名稱Civil Engineering: Supervision and Management影響因子(影響力)




書目名稱Civil Engineering: Supervision and Management影響因子(影響力)學科排名




書目名稱Civil Engineering: Supervision and Management網絡公開度




書目名稱Civil Engineering: Supervision and Management網絡公開度學科排名




書目名稱Civil Engineering: Supervision and Management被引頻次




書目名稱Civil Engineering: Supervision and Management被引頻次學科排名




書目名稱Civil Engineering: Supervision and Management年度引用




書目名稱Civil Engineering: Supervision and Management年度引用學科排名




書目名稱Civil Engineering: Supervision and Management讀者反饋




書目名稱Civil Engineering: Supervision and Management讀者反饋學科排名




單選投票, 共有 0 人參與投票
 

0票 0%

Perfect with Aesthetics

 

0票 0%

Better Implies Difficulty

 

0票 0%

Good and Satisfactory

 

0票 0%

Adverse Performance

 

0票 0%

Disdainful Garbage

您所在的用戶組沒有投票權限
沙發(fā)
發(fā)表于 2025-3-21 21:20:52 | 只看該作者
Contractual arrangements, by particular industries or specialist suppliers, but conditions for more general use have been developed by the major engineering and building institutions, as well as by government and allied organizations. Use of these standard conditions is beneficial because they are familiar to contractors, g
板凳
發(fā)表于 2025-3-22 01:02:33 | 只看該作者
地板
發(fā)表于 2025-3-22 07:38:21 | 只看該作者
The engineer and his staff,to all the circumstances’ (Clause 2(8)). The parties to the contract can thus look to the engineer to carry out the administrative duties required under the contract fairly, and to make the decisions that are necessary to allow the works to proceed to completion. The parties reserve to themselves, h
5#
發(fā)表于 2025-3-22 09:23:19 | 只看該作者
Starting the construction work,s in tenders in order to select the best offer. Once an award of contract has been made, a further meeting is necessary to make preparations for starting the contract. Such a pre-commencement meeting will be attended by the employer or his key staff concerned, the engineer and his proposed resident
6#
發(fā)表于 2025-3-22 14:11:16 | 只看該作者
Site surveys, investigations and layout,onvenient method for surveying and levelling small or moderately sized sites is to use spot levelling on a 20 m grid, picking up any abrupt changes of level or gradient between these intervals. An instrument man and two chainmen are needed to carry out the work. Ranging poles, two fibreglass tapes,
7#
發(fā)表于 2025-3-22 17:30:24 | 只看該作者
,The resident engineer’s office records, engineer depend to a considerable extent upon the efficiency of the record systems that he sets up. These records keep watch over the progress of the work, form the basis for fixing payments to contractors, and testify to the proper execution of the works. They make it possible for designers to be
8#
發(fā)表于 2025-3-22 22:10:43 | 只看該作者
9#
發(fā)表于 2025-3-23 03:40:16 | 只看該作者
10#
發(fā)表于 2025-3-23 07:39:33 | 只看該作者
 關于派博傳思  派博傳思旗下網站  友情鏈接
派博傳思介紹 公司地理位置 論文服務流程 影響因子官網 吾愛論文網 大講堂 北京大學 Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點評 投稿經驗總結 SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學 Yale Uni. Stanford Uni.
QQ|Archiver|手機版|小黑屋| 派博傳思國際 ( 京公網安備110108008328) GMT+8, 2025-10-15 10:37
Copyright © 2001-2015 派博傳思   京公網安備110108008328 版權所有 All rights reserved
快速回復 返回頂部 返回列表
湾仔区| 井陉县| 苍南县| 肇庆市| 洞口县| 河池市| 赫章县| 七台河市| 南昌市| 大关县| 莎车县| 原平市| 沙河市| 西安市| 保定市| 沧源| 天等县| 湖州市| 满城县| 南昌市| 赞皇县| 会同县| 东乡| 兴安盟| 和龙市| 甘肃省| 柘城县| 八宿县| 海门市| 仁寿县| 永修县| 秦安县| 南召县| 合江县| 云南省| 镇沅| 新兴县| 铅山县| 东安县| 霍林郭勒市| 磐石市|