找回密碼
 To register

QQ登錄

只需一步,快速開始

掃一掃,訪問微社區(qū)

打印 上一主題 下一主題

Titlebook: Build To Order; The Road to the 5-Da Glenn Parry,Andrew Graves Book 2008 Springer-Verlag London 2008 Automobil.Motor.architecture.automatio

[復制鏈接]
樓主: JADE
41#
發(fā)表于 2025-3-28 15:14:27 | 只看該作者
Complexity Cost Managementreation of different variants of a product. The current understanding and state of awareness of the influence of complexity on cost structures is reflected in the results of a survey carried out by the authors. The methodology used to analyse the complexity costs of existing processes is described a
42#
發(fā)表于 2025-3-28 22:34:41 | 只看該作者
Key Principles of Flexible Production and Logistics Networkses in the supply network. This section of the book presents innovative flexible processes for inter-enterprise collaborative planning and execution. These processes support the industry’s need for effective and efficient collaboration of planning capacities throughout the supply network. These have
43#
發(fā)表于 2025-3-28 23:40:27 | 只看該作者
44#
發(fā)表于 2025-3-29 05:24:08 | 只看該作者
45#
發(fā)表于 2025-3-29 09:36:25 | 只看該作者
Functionalities of Supporting IT Systems: Current Situation, Future Requirements and Innovative Apprin 5 days. Unfortunately, the current IT infrastructure and systems applied within the automotive industry do not fulfil the requirements posed by new collaborative processes. The existing legacy systems were originally built for a “different world” of IT development, specific tasks (not integrated)
46#
發(fā)表于 2025-3-29 11:54:47 | 只看該作者
Modelled Scenario Examples for Planning and Execution Processesdel uses demand data provided by industry and taken from a real car’s lifecycle, projected forwards to the years 2015 to 2022. All scenarios modelled are based on a specific product structure for a modular car. The product structure is broken down into defined modules such as the engine, the front,
47#
發(fā)表于 2025-3-29 17:32:18 | 只看該作者
A BTO Reference Model for High-Level Supply Chain Design production system. A build-to-order (BTO) approach can offer a solution to this challenge. Consequently, many innovative concepts have been developed, discussed and piloted in the context of process, structure and product redesign. Nevertheless, all players in an automotive supply network are conti
48#
發(fā)表于 2025-3-29 22:25:22 | 只看該作者
Overfull: The Immateriality of Walkingcost of providing flexibility in manufacturing on the other. In this chapter we discuss the impacts of BTO on the OEM as well as the component supply and distribution chain, and outline the key challenges that OEMs face on their way to implementing BTO, including approaches for mitigating these.
49#
發(fā)表于 2025-3-30 03:56:03 | 只看該作者
Glenn Parry,Andrew GravesAddresses the conceptual and practical aspects for achieving the rapid delivery to the customer of a bespoke vehicle only days after placing an order.Includes supplementary material:
50#
發(fā)表于 2025-3-30 05:32:03 | 只看該作者
http://image.papertrans.cn/b/image/191549.jpg
 關于派博傳思  派博傳思旗下網(wǎng)站  友情鏈接
派博傳思介紹 公司地理位置 論文服務流程 影響因子官網(wǎng) 吾愛論文網(wǎng) 大講堂 北京大學 Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點評 投稿經(jīng)驗總結 SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學 Yale Uni. Stanford Uni.
QQ|Archiver|手機版|小黑屋| 派博傳思國際 ( 京公網(wǎng)安備110108008328) GMT+8, 2025-10-17 14:52
Copyright © 2001-2015 派博傳思   京公網(wǎng)安備110108008328 版權所有 All rights reserved
快速回復 返回頂部 返回列表
日喀则市| 正阳县| 永年县| 从江县| 五家渠市| 西青区| 吉安市| 边坝县| 浑源县| 富川| 彭泽县| 婺源县| 沂南县| 瑞金市| 光泽县| 霍城县| 建昌县| 汉沽区| 德钦县| 中牟县| 武陟县| 房山区| 临夏县| 如皋市| 武威市| 邛崃市| 稷山县| 凤山市| 安宁市| 吉林省| 长沙市| 逊克县| 灵台县| 东台市| 宜阳县| 东方市| 博客| 新昌县| 东安县| 靖边县| 黄大仙区|