找回密碼
 To register

QQ登錄

只需一步,快速開始

掃一掃,訪問微社區(qū)

打印 上一主題 下一主題

Titlebook: Beyond Manufacturing Resource Planning (MRP II); Advanced Models and Andreas Drexl,Alf Kimms Book 1998 Springer-Verlag Berlin Heidelberg 1

[復(fù)制鏈接]
樓主: antibody
41#
發(fā)表于 2025-3-28 18:32:56 | 只看該作者
42#
發(fā)表于 2025-3-28 21:56:31 | 只看該作者
43#
發(fā)表于 2025-3-29 00:49:48 | 只看該作者
Maintaining Robust Schedules by Fuzzy Reasoningonly the most likely duration of operations. This schedule is iteratively “repaired” until some threshold evaluation is found. A repair is found with a local search procedure based on tabu search. Finally, we show which events can lead to reactive scheduling and how this is supported by the repair s
44#
發(fā)表于 2025-3-29 06:46:31 | 只看該作者
Book 1998we received papers for this issue, we discovered that MRP II is a topic about which not only management scientists show interest. As the list of authors proves, industrial engineers, computer scientists, and-operations researchers from academia as well as practitioners have contributed to this book.
45#
發(fā)表于 2025-3-29 09:03:47 | 只看該作者
https://doi.org/10.1057/9781137305497me Planning contrary to an ordinary reorder point system uses time as a decision variable instead of quantity. Cover-Time Planning has like Kanban a built in restriction of work-in-process. Not until previous production is consumed a new production is initiated.
46#
發(fā)表于 2025-3-29 11:54:57 | 只看該作者
https://doi.org/10.1007/978-3-662-03742-3Autodesk Inventor; Manufacturing; algorithms; capacity; control; control theory; decision making; fuzzy rea
47#
發(fā)表于 2025-3-29 17:17:11 | 只看該作者
978-3-642-08393-8Springer-Verlag Berlin Heidelberg 1998
48#
發(fā)表于 2025-3-29 22:21:52 | 只看該作者
49#
發(fā)表于 2025-3-30 00:15:26 | 只看該作者
https://doi.org/10.1057/9781137305497. customer service, manufacturing efficiency and inventory investment, involving both market and manufacturing insights. Master scheduling has traditionally been treated as a material-based planning tool, e.g. in the MRP II (manufacturing resource planning) approach to master scheduling. Capacity is
50#
發(fā)表于 2025-3-30 04:19:02 | 只看該作者
https://doi.org/10.1057/9781137305497 MPS is selected out of 192 alternative MPS determined by using a Cell Loading software in a Cellular Manufacturing environment. The software is used to help implement a Knowledge-Based Finite Schedule Material Requirements Planning (MRP II) in a jewelry manufacturing plant. The knowledge base syste
 關(guān)于派博傳思  派博傳思旗下網(wǎng)站  友情鏈接
派博傳思介紹 公司地理位置 論文服務(wù)流程 影響因子官網(wǎng) 吾愛論文網(wǎng) 大講堂 北京大學(xué) Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點(diǎn)評(píng) 投稿經(jīng)驗(yàn)總結(jié) SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學(xué) Yale Uni. Stanford Uni.
QQ|Archiver|手機(jī)版|小黑屋| 派博傳思國(guó)際 ( 京公網(wǎng)安備110108008328) GMT+8, 2026-1-19 12:07
Copyright © 2001-2015 派博傳思   京公網(wǎng)安備110108008328 版權(quán)所有 All rights reserved
快速回復(fù) 返回頂部 返回列表
玉龙| 共和县| 合江县| 原阳县| 洛宁县| 甘洛县| 望都县| 韶山市| 吐鲁番市| 云阳县| 峡江县| 南京市| 尼玛县| 宝应县| 老河口市| 邢台县| 昌乐县| 安多县| 称多县| 阿鲁科尔沁旗| 霸州市| 广丰县| 兴文县| 策勒县| 祁门县| 郸城县| 柞水县| 镇原县| 望都县| 玛纳斯县| 吐鲁番市| 枣强县| 晋宁县| 平利县| 改则县| 吴旗县| 河北区| 和静县| 迁安市| 横山县| 永昌县|