找回密碼
 To register

QQ登錄

只需一步,快速開(kāi)始

掃一掃,訪問(wèn)微社區(qū)

打印 上一主題 下一主題

Titlebook: Application of Time-Synchronized Measurements in Power System Transmission Networks; Mladen Kezunovic,Sakis Meliopoulos,Vijay Vittal Book

[復(fù)制鏈接]
樓主: Autonomous
11#
發(fā)表于 2025-3-23 12:49:20 | 只看該作者
12#
發(fā)表于 2025-3-23 16:42:34 | 只看該作者
13#
發(fā)表于 2025-3-23 21:52:08 | 只看該作者
N. S. Mera,D. B. Ingham,L. Elliottlocation techniques were developed, but very few have used synchronized samples or synchrophasors. Most recently, the use of synchronized samples and phasors in fault location has become a subject of interest since the technology has matured and is readily available.
14#
發(fā)表于 2025-3-24 01:18:01 | 只看該作者
Real Time Stability Monitoring, Synchrophasor measurements together with modern communication technology facilitate the monitoring of the current state of the wide-area power system in near real time. Recent research aims to exploit the availability of such wide-area synchronized measurements from across the system into developing new real time tools for power system operation.
15#
發(fā)表于 2025-3-24 02:20:41 | 只看該作者
Transmission Line Fault Location,location techniques were developed, but very few have used synchronized samples or synchrophasors. Most recently, the use of synchronized samples and phasors in fault location has become a subject of interest since the technology has matured and is readily available.
16#
發(fā)表于 2025-3-24 06:51:18 | 只看該作者
17#
發(fā)表于 2025-3-24 13:04:21 | 只看該作者
18#
發(fā)表于 2025-3-24 17:24:33 | 只看該作者
Real Time Stability Monitoring,well as in power systems all over the world. Recent initiatives by the US federal government in the general area of smart grid technology are contributing to installations of synchrophasor monitoring systems in many utilities in the North American power grid. The industry–university collaborative or
19#
發(fā)表于 2025-3-24 20:29:27 | 只看該作者
20#
發(fā)表于 2025-3-25 00:30:12 | 只看該作者
Transmission Line Fault Location,o pinpoint where the fault has occurred and initiate corresponding effort to repair and restore the affected transmission line. Once the protective relays have detected a transmission line fault and tripped (disconnected) the line by issuing a control command to circuit breakers, the fault location
 關(guān)于派博傳思  派博傳思旗下網(wǎng)站  友情鏈接
派博傳思介紹 公司地理位置 論文服務(wù)流程 影響因子官網(wǎng) 吾愛(ài)論文網(wǎng) 大講堂 北京大學(xué) Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點(diǎn)評(píng) 投稿經(jīng)驗(yàn)總結(jié) SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學(xué) Yale Uni. Stanford Uni.
QQ|Archiver|手機(jī)版|小黑屋| 派博傳思國(guó)際 ( 京公網(wǎng)安備110108008328) GMT+8, 2025-11-2 19:35
Copyright © 2001-2015 派博傳思   京公網(wǎng)安備110108008328 版權(quán)所有 All rights reserved
快速回復(fù) 返回頂部 返回列表
游戏| 广州市| 永城市| 阳原县| 霸州市| 北京市| 衡阳市| 依兰县| 无为县| 平潭县| 兰西县| 名山县| 通渭县| 山西省| 深泽县| 东兰县| 靖宇县| 桑日县| 奉化市| 焉耆| 翼城县| 南宫市| 苍梧县| 安多县| 明水县| 光山县| 西昌市| 汉中市| 集安市| 林甸县| 惠安县| 麟游县| 民丰县| 民县| 永顺县| 普宁市| 泾阳县| 揭东县| 蒙自县| 安多县| 东乌|