派博傳思國際中心

標(biāo)題: Titlebook: ; [打印本頁]

作者: 不能平庸    時間: 2025-3-21 19:26
書目名稱Grand Ethiopian Renaissance Dam Versus Aswan High Dam影響因子(影響力)




書目名稱Grand Ethiopian Renaissance Dam Versus Aswan High Dam影響因子(影響力)學(xué)科排名




書目名稱Grand Ethiopian Renaissance Dam Versus Aswan High Dam網(wǎng)絡(luò)公開度




書目名稱Grand Ethiopian Renaissance Dam Versus Aswan High Dam網(wǎng)絡(luò)公開度學(xué)科排名




書目名稱Grand Ethiopian Renaissance Dam Versus Aswan High Dam被引頻次




書目名稱Grand Ethiopian Renaissance Dam Versus Aswan High Dam被引頻次學(xué)科排名




書目名稱Grand Ethiopian Renaissance Dam Versus Aswan High Dam年度引用




書目名稱Grand Ethiopian Renaissance Dam Versus Aswan High Dam年度引用學(xué)科排名




書目名稱Grand Ethiopian Renaissance Dam Versus Aswan High Dam讀者反饋




書目名稱Grand Ethiopian Renaissance Dam Versus Aswan High Dam讀者反饋學(xué)科排名





作者: 急性    時間: 2025-3-21 20:31

作者: 大量    時間: 2025-3-22 02:03
Importance of Aswan High Dam to Egypt,low flooding and drought years; and both for hydropower generation and saving water. The beneficial side effects of the river dams are to control the river destruction power during high flooding years, to prevent the siltation in irrigation canal, and finally to save water from being wasted in the s
作者: 抱怨    時間: 2025-3-22 06:35

作者: 記憶法    時間: 2025-3-22 09:24
Stochastic Investigation of the GERD-AHD Interaction Through First Impoundment and Beyond,) reservoir will be reduced as water is abstracted during GERD’s first impoundment. In the long-term, the inflow to AHD will be affected due to flow regulation and additional evaporation losses from GERD. This chapter presents a stochastic analysis of the impacts of GERD on AHD. Synthetic Nile flow
作者: mechanism    時間: 2025-3-22 15:03
Model-Based Optimization for Operating the Ethiopian Renaissance Dam on the Blue Nile River,s much higher than the capability of the Blue. Ethiopia unilaterally announced its plan to build the Grand Ethiopian Renaissance Dam (GERD) on the Blue Nile at the very same location of the Border Dam. It increased the storage capacity from 11.1 to 74 billion cubic meter (BCM), which represents 1.5
作者: mechanism    時間: 2025-3-22 20:18

作者: calumniate    時間: 2025-3-23 01:18
,Environmental Impacts of the GERD Project on Egypt’s Aswan High Dam Lake and Mitigation and Adaptatth growing concerns about climate change and possible impacts on water shortage, human intrusion and development processes have had undeniable adverse impacts on maintaining healthy lakes. Aswan High Dam (AHD) Lake is considered a source of water to minimize the water scarcity problem. Lake Nasser i
作者: 口訣法    時間: 2025-3-23 05:19
The Grand Ethiopian Renaissance Dam, Agriculture, and the Rural Poor in Egypt,gypt. This requires the analysis of the macro and micro level impacts. To determine the macro level impacts and the micro level implications, three scenarios (4, 6, 8 years) are developed. The macro level assessment shows aggregated water and agricultural land reductions and their subsequent effects
作者: 防銹    時間: 2025-3-23 05:52

作者: BUOY    時間: 2025-3-23 11:35
,Evaluation of Merowe Dam’s Effect on the Accumulated Sediment in Lake Nubia, Sudan Using RS/GIS,ion rate into this lake based on their design criteria. This chapter aims to estimate the annual inflow sediment rate into Lake Nubia before and after the operation of Merowe Dam. Therefore, the following equal length periods (2000–2003) before its operation and (2009–2012) after its operation are c
作者: Fulminate    時間: 2025-3-23 14:06

作者: Intend    時間: 2025-3-23 21:25

作者: nauseate    時間: 2025-3-23 22:54

作者: muffler    時間: 2025-3-24 03:16
Harvesting the Skies of Egypt: An Option to Recover the Evaporation Losses from the Aswan High Dam ypt and Sudan. Evaporation losses range from 5 to 10?mm/m./day throughout the year and average 7.4?mm/m./day leading to an estimated loss of 16?km. or 20% of the annual consumption of water by Egypt for farming, industrial, and domestic applications..These losses cannot be prevented and are difficul
作者: 拱形面包    時間: 2025-3-24 07:55
Impact of the International Context on the Political and Legal Dimensions of the Aswan High Dam (19coupled with highly complex political conditions due to the historical phase Egypt experienced both on the domestic and international levels. At the domestic level, Egypt witnessed a transitional phase in its political history, the transition from monarchy to the republican system in addition to com
作者: Pulmonary-Veins    時間: 2025-3-24 11:58
Continuous Dispute Between Egypt and Ethiopia Concerning Nile Water and Mega Dams,f mega dams. The one-sided decision by Ethiopia to construct the Grand Ethiopian Renaissance Dam (GERD), a mega dam, exploited Egyptian circumstances after the January 2011 revolution by announcing the construction of what will be the biggest dam in Africa and one of the ten biggest dams in the worl
作者: 解凍    時間: 2025-3-24 16:49
The Grand Ethiopian Renaissance Dam and the Ethiopian Challenge of Hydropolitical Hegemony on the N interactions between the Egyptian and Ethiopian sides..Although “the Renaissance Dam” – known previously as “Border Dam” – was one of the dams and water projects proposed by the United States Bureau of Reclamation (USBR) in its 1964 report on the exploitation of the waters of the Blue Nile, yet the
作者: ascend    時間: 2025-3-24 22:26
Impact of the Grand Ethiopian Renaissance Dam (GERD) on Gezira Groundwater, Sudan,t 80% of the people in Sudan depend mainly on groundwater. The Grand Ethiopian Renaissance Dam (GERD) is under construction on the Blue Nile at 15?km from the Sudan’s border, creating a reservoir of 74?km.. The environmental studies of the GERD effect on Egypt and Sudan are vague. The present paper
作者: 腐敗    時間: 2025-3-25 01:45
Mesoscale Analysis of Hydraulicsfreshwater for the rapid growth of populations and consequently the increasing demand for food. The construction of Grand Ethiopian Renaissance Dam (GERD) imposed additional challenges to Egypt due to the expected harm to all sectors in Egypt particularly the agricultural sector which consumes about
作者: –scent    時間: 2025-3-25 06:30

作者: 虛弱的神經(jīng)    時間: 2025-3-25 09:59
Mesoscopic Route to Time Travellow flooding and drought years; and both for hydropower generation and saving water. The beneficial side effects of the river dams are to control the river destruction power during high flooding years, to prevent the siltation in irrigation canal, and finally to save water from being wasted in the s
作者: Cirrhosis    時間: 2025-3-25 13:41

作者: 我不明白    時間: 2025-3-25 16:00
https://doi.org/10.1007/978-981-33-4381-8) reservoir will be reduced as water is abstracted during GERD’s first impoundment. In the long-term, the inflow to AHD will be affected due to flow regulation and additional evaporation losses from GERD. This chapter presents a stochastic analysis of the impacts of GERD on AHD. Synthetic Nile flow
作者: EWER    時間: 2025-3-25 22:10
https://doi.org/10.1007/978-3-658-44518-8s much higher than the capability of the Blue. Ethiopia unilaterally announced its plan to build the Grand Ethiopian Renaissance Dam (GERD) on the Blue Nile at the very same location of the Border Dam. It increased the storage capacity from 11.1 to 74 billion cubic meter (BCM), which represents 1.5
作者: PAEAN    時間: 2025-3-26 00:13

作者: ensemble    時間: 2025-3-26 05:17

作者: spondylosis    時間: 2025-3-26 10:10

作者: 開頭    時間: 2025-3-26 16:02

作者: 別名    時間: 2025-3-26 18:27
https://doi.org/10.1007/978-3-663-08758-8ion rate into this lake based on their design criteria. This chapter aims to estimate the annual inflow sediment rate into Lake Nubia before and after the operation of Merowe Dam. Therefore, the following equal length periods (2000–2003) before its operation and (2009–2012) after its operation are c
作者: Guileless    時間: 2025-3-26 22:29

作者: 中國紀(jì)念碑    時間: 2025-3-27 02:24

作者: visual-cortex    時間: 2025-3-27 05:58
Messen, Steuern, Regeln für Maschinenbauern Middle Egypt. While this engineering work functioned trouble-free for 1,500 years until the Ptolemeans closed down some of the canals to dry out the shores and convert them to farmlands, modern problems following the construction of new reservoirs in the twentieth and twenty-first century suffer f
作者: Osmosis    時間: 2025-3-27 13:11

作者: 繼而發(fā)生    時間: 2025-3-27 17:18
Hermann Fuchslocher,Harald Hochheimercoupled with highly complex political conditions due to the historical phase Egypt experienced both on the domestic and international levels. At the domestic level, Egypt witnessed a transitional phase in its political history, the transition from monarchy to the republican system in addition to com
作者: Benzodiazepines    時間: 2025-3-27 18:35
Grundlagen des betrieblichen Messens,f mega dams. The one-sided decision by Ethiopia to construct the Grand Ethiopian Renaissance Dam (GERD), a mega dam, exploited Egyptian circumstances after the January 2011 revolution by announcing the construction of what will be the biggest dam in Africa and one of the ten biggest dams in the worl
作者: Musket    時間: 2025-3-28 00:08
https://doi.org/10.1007/978-3-658-08589-6 interactions between the Egyptian and Ethiopian sides..Although “the Renaissance Dam” – known previously as “Border Dam” – was one of the dams and water projects proposed by the United States Bureau of Reclamation (USBR) in its 1964 report on the exploitation of the waters of the Blue Nile, yet the
作者: 道學(xué)氣    時間: 2025-3-28 04:01
Wege zur Kundenmesse für Ausstellert 80% of the people in Sudan depend mainly on groundwater. The Grand Ethiopian Renaissance Dam (GERD) is under construction on the Blue Nile at 15?km from the Sudan’s border, creating a reservoir of 74?km.. The environmental studies of the GERD effect on Egypt and Sudan are vague. The present paper
作者: 血友病    時間: 2025-3-28 06:36
Grand Ethiopian Renaissance Dam Versus Aswan High Dam978-3-319-95600-8Series ISSN 1867-979X Series E-ISSN 1616-864X
作者: 小歌劇    時間: 2025-3-28 10:44
https://doi.org/10.1007/978-1-935704-20-1on against drought and flood. For example, droughts happened between 1979 and 1987 and flood between 1998 and 2002 had no influence on water supply downstream from Aswan. Other AHD benefits were (1) production of electricity, (2) providing water for agricultural land reclamation, (3) converting basi
作者: REIGN    時間: 2025-3-28 18:17

作者: Gesture    時間: 2025-3-28 20:29

作者: 投票    時間: 2025-3-29 01:39

作者: Barrister    時間: 2025-3-29 05:03
https://doi.org/10.1007/978-3-658-44518-8act on the Aswan High Dam (AHD). The main objectives should be achieving a minimum water deficit in the downstream and a maximum power generation from both GERD and AHD..The results of the model were tabulated and analyzed using the mentioned criteria to obtain the best long-term regulation policies
作者: Redundant    時間: 2025-3-29 08:56
Messunsicherheit im Versuchsprotokoll,eir solutions are identified and discussed..First, soils surrounding Lake Nasser, i.e., Kalabsha, Toshka, El- Dakka, Abu Simbel at the western side of the lake, and Allaqui area on the eastern side, were deposited due to water action (wind action was not evaluated in this study). Wadi soils are hete
作者: Delirium    時間: 2025-3-29 14:08

作者: LATHE    時間: 2025-3-29 16:03
https://doi.org/10.1007/978-3-658-38929-1ir is about 12?km, and its storage capacity is 162 billion m...This chapter is an attempt to assess and analyzes the deposition in the Aswan High Dam Reservoir during the last 50 years from 1964 to 2014, by using different techniques to estimate the effective life span of the reservoir..The traditio
作者: RLS898    時間: 2025-3-29 21:04

作者: MAOIS    時間: 2025-3-30 01:19
Walter Kaspers,Hans-Jürgen Küfneration 0.9975 and 0.9978 for bed levels and velocities, respectively, and for verification 0.9921 and 0.9959 for bed levels and velocities, respectively), indicating that the model was efficiently calibrated and verified. It shows good agreement between the simulated and measured data (by comparisons
作者: 清楚    時間: 2025-3-30 06:27

作者: Hangar    時間: 2025-3-30 12:11
Messen, Steuern, Regeln für Maschinenbauerrams can also offset the loss of reservoir capacity, increased evaporation losses due to the reduction of the surface to volume ratio, accumulation of weeds, and loss of hydroelectric power production due to sedimentation..A careful analysis of the sediments in Lake Nasser with a preponderance of pl
作者: 出生    時間: 2025-3-30 15:14

作者: ESPY    時間: 2025-3-30 16:56
Hermann Fuchslocher,Harald Hochheimerce the AHD was politicized as shown in the scientific, political, legal, and economic debates around it, in addition to the political conditionality associated with its financing..Thus, the study raises the question: What is the impact of the international context (the regional and global levels) on
作者: Brocas-Area    時間: 2025-3-30 23:52
Grundlagen des betrieblichen Messens,be agreement, or the “Nile River Basin Cooperation,” which was signed by six upstream countries, was the first step in the current broad breach between Egypt, Ethiopia, and most countries of the White Nile Basin. The Agreement considers that the history of Nile treaties and agreements began in 2010,
作者: Amorous    時間: 2025-3-31 02:53

作者: Ledger    時間: 2025-3-31 07:11
Wege zur Kundenmesse für Ausstellerile that will be controlled entirely by the GERD. If there is a direct recharge from the Blue Nile, the GERD will increase the recharge because it will keep the water in the Blue Nile always at a high level all year, resulting in increasing the seepage to the aquifer. The agriculture will also be al
作者: phlegm    時間: 2025-3-31 10:30
Grand Ethiopian Renaissance Dam Versus Aswan High Dam
作者: gain631    時間: 2025-3-31 17:09

作者: 清楚說話    時間: 2025-3-31 19:41

作者: 欲望小妹    時間: 2025-4-1 00:37

作者: 畸形    時間: 2025-4-1 04:26
Stochastic Investigation of the GERD-AHD Interaction Through First Impoundment and Beyond,r energy maximization. Operating GERD as a long-term storage reservoir results in reduced, yet still considerable impacts. Optimal GERD filling and operation policies aimed at minimizing downstream risks through a comprehensive regional economic, environmental, and social analysis are urgently neede
作者: 音樂會    時間: 2025-4-1 08:30
Model-Based Optimization for Operating the Ethiopian Renaissance Dam on the Blue Nile River,act on the Aswan High Dam (AHD). The main objectives should be achieving a minimum water deficit in the downstream and a maximum power generation from both GERD and AHD..The results of the model were tabulated and analyzed using the mentioned criteria to obtain the best long-term regulation policies
作者: 裙帶關(guān)系    時間: 2025-4-1 12:53
,Environmental Impacts of the GERD Project on Egypt’s Aswan High Dam Lake and Mitigation and Adaptateir solutions are identified and discussed..First, soils surrounding Lake Nasser, i.e., Kalabsha, Toshka, El- Dakka, Abu Simbel at the western side of the lake, and Allaqui area on the eastern side, were deposited due to water action (wind action was not evaluated in this study). Wadi soils are hete
作者: Optometrist    時間: 2025-4-1 17:58

作者: 粉筆    時間: 2025-4-1 21:26
,Assessment of Sediment Deposition in Aswan High Dam Reservoir During 50 Years (1964–2014),ir is about 12?km, and its storage capacity is 162 billion m...This chapter is an attempt to assess and analyzes the deposition in the Aswan High Dam Reservoir during the last 50 years from 1964 to 2014, by using different techniques to estimate the effective life span of the reservoir..The traditio
作者: Collar    時間: 2025-4-1 23:17





歡迎光臨 派博傳思國際中心 (http://www.pjsxioz.cn/) Powered by Discuz! X3.5
腾冲县| 花莲市| 镇康县| 勐海县| 乐至县| 广水市| 客服| 壤塘县| 萨迦县| 同江市| 广南县| 和平区| 胶南市| 马龙县| 通海县| 南阳市| 尼玛县| 长阳| 正宁县| 尖扎县| 鄂温| 永州市| 凤翔县| 临澧县| 崇仁县| 多伦县| 新竹市| 安龙县| 新宁县| 安陆市| 大丰市| 高雄市| 万载县| 房产| 四川省| 丰台区| 武义县| 浦北县| 峨山| 方正县| 罗田县|