標(biāo)題: Titlebook: Geotechnical Instrumentation and Applications; Myint Win Bo,Jeffrey Barrett Textbook 2023 The Editor(s) (if applicable) and The Author(s), [打印本頁] 作者: Sediment 時間: 2025-3-21 17:02
書目名稱Geotechnical Instrumentation and Applications影響因子(影響力)
書目名稱Geotechnical Instrumentation and Applications影響因子(影響力)學(xué)科排名
書目名稱Geotechnical Instrumentation and Applications網(wǎng)絡(luò)公開度
書目名稱Geotechnical Instrumentation and Applications網(wǎng)絡(luò)公開度學(xué)科排名
書目名稱Geotechnical Instrumentation and Applications被引頻次
書目名稱Geotechnical Instrumentation and Applications被引頻次學(xué)科排名
書目名稱Geotechnical Instrumentation and Applications年度引用
書目名稱Geotechnical Instrumentation and Applications年度引用學(xué)科排名
書目名稱Geotechnical Instrumentation and Applications讀者反饋
書目名稱Geotechnical Instrumentation and Applications讀者反饋學(xué)科排名
作者: LARK 時間: 2025-3-21 22:31 作者: PHONE 時間: 2025-3-22 01:57 作者: Infinitesimal 時間: 2025-3-22 04:47 作者: cochlea 時間: 2025-3-22 10:03 作者: hypotension 時間: 2025-3-22 14:56
Monitoring, Data Processing, Data Verification and Presentation,systems are operating properly. In many cases, verifications can be carried out based on initially collected zero reading after stabilization. However, some instruments required significant poll of data to verify the accuracy and precision of monitored data. These details together with monitoring fr作者: hypotension 時間: 2025-3-22 20:45 作者: 白楊 時間: 2025-3-22 22:57
Factors Affecting Measured Instrument Data,d performance of installed instrument. This chapter will explain some details on methods of installation, measurement, functionality and performance of instrument which can affect the measured monitoring data.作者: Inelasticity 時間: 2025-3-23 02:42
Case Studies,otechnical instrument to monitor change in ground and groundwater conditions and pressures, stresses, deformations etc., is monitored during the construction of the infrastructures. In the following sections, case studies written by engineers who were intensively involved in the implementation of su作者: Duodenitis 時間: 2025-3-23 06:03
https://doi.org/10.1007/978-3-663-00122-5 things worse, changes in environmental conditions such as change in surface and ground water levels/pressures, temperature also could lead to change in the performance of soils and rocks under additional stresses. These changes impact performance of the ground and groundwater/porewater contained in作者: 商店街 時間: 2025-3-23 09:54
Entwicklung in speziellen Produktbereichen,emented when the monitoring data collected and interpreted results indicate as an alert. This chapter will walk through several types of geotechnical instrument available in the market to measure respective deformations, strains, stresses and pressures within/underneath and on the earth masses and s作者: PHONE 時間: 2025-3-23 14:14 作者: Interregnum 時間: 2025-3-23 19:24 作者: Picks-Disease 時間: 2025-3-23 22:31 作者: 陪審團(tuán) 時間: 2025-3-24 04:00
surement, recommended monitoring frequencies for manual monitoring and methods of data processing and presentation, as well as analyses and interpretations of monitored data for performance assessment. Factors affecting measured instrument data are also discussed with a few examples. Case studies are presented wi978-3-031-34277-6978-3-031-34275-2作者: conformity 時間: 2025-3-24 07:42 作者: aspect 時間: 2025-3-24 13:14
Joachim Boidol,Heinrich Jasper,Bernd Korzenled on the surface and/or on the existing ground levels, whereas some are installed in the boreholes in order to monitor the behaviour of soil elements at particular depths for specific types of soil. Others are installed on the structural elements such as foundations, retaining walls and support element such as piles, anchors and struts.作者: 抱狗不敢前 時間: 2025-3-24 14:52 作者: 相符 時間: 2025-3-24 21:30 作者: 大喘氣 時間: 2025-3-25 01:02
Factors Affecting Measured Instrument Data,d performance of installed instrument. This chapter will explain some details on methods of installation, measurement, functionality and performance of instrument which can affect the measured monitoring data.作者: aggrieve 時間: 2025-3-25 05:07
978-3-031-34277-6The Editor(s) (if applicable) and The Author(s), under exclusive license to Springer Nature Switzerl作者: CHOKE 時間: 2025-3-25 08:25
https://doi.org/10.1007/978-3-663-00122-5, compressibility and hydraulic characteristics and their responses to additional stresses imposed on them. In addition to their variation of profile, their strength, stiffness and compressibilities and hydraulic characteristics vary across the area as well as along the depth they existed. To make t作者: Corroborate 時間: 2025-3-25 13:52
Entwicklungsl?nder, Entwicklungshilfe problem encountered are discussed under a few categories of changes such as settlement, slope instability and lateral displacements, change in groundwater and porewater pressures, induced vibration and structural deformations. Depending upon the types of construction works and potential issues like作者: ELUC 時間: 2025-3-25 17:40
Entwicklung in speziellen Produktbereichen,cal issues likely to encounter during and after construction, two basic categories of geotechnical instrumentation programmes are usually implemented..By measuring deformations and stresses, progress leading to failure or progress of improvement can be detected. With systematic planning of monitorin作者: Initiative 時間: 2025-3-25 20:41
https://doi.org/10.1007/978-3-642-59075-7. Geotechnical instruments used prior to construction are kinds of measurement required to understand the site conditions and data required for design process. Some instruments are also installed to collect baseline information. These could be used as legal information in any dispute on change in un作者: 熄滅 時間: 2025-3-26 03:16
Joachim Boidol,Heinrich Jasper,Bernd Korzenled on the surface and/or on the existing ground levels, whereas some are installed in the boreholes in order to monitor the behaviour of soil elements at particular depths for specific types of soil. Others are installed on the structural elements such as foundations, retaining walls and support el作者: Cosmopolitan 時間: 2025-3-26 06:02 作者: Prophylaxis 時間: 2025-3-26 10:24
Roland Lachmayer,René Bastian Lippertarnings, etc. Using these outputs from analyses, appropriate decisions related to remedial actions or acceptances could be made..Measurements of achievement, definitions of alert and target/trigger levels are different for each instrument. These will be explained in more details for the following ty作者: 光滑 時間: 2025-3-26 12:41
https://doi.org/10.1007/978-3-662-65924-3d performance of installed instrument. This chapter will explain some details on methods of installation, measurement, functionality and performance of instrument which can affect the measured monitoring data.作者: Adulate 時間: 2025-3-26 18:15 作者: Bph773 時間: 2025-3-26 23:53
https://doi.org/10.1007/978-3-031-34275-2Geotechnical Instrumentation; Earth Pressure; Observational Method; Structural Deformation; Lateral Disp作者: 金哥占卜者 時間: 2025-3-27 03:36
Problemstellung und Gedankengang der Arbeitized in the following construction projects:.In this chapter, a few selected case studies on application of geotechnical instrumentation in land reclamation and ground improvement project, slope stability project, excavation project and tunnelling project are presented.作者: NAV 時間: 2025-3-27 07:47
Case Studies,ized in the following construction projects:.In this chapter, a few selected case studies on application of geotechnical instrumentation in land reclamation and ground improvement project, slope stability project, excavation project and tunnelling project are presented.作者: 有效 時間: 2025-3-27 11:02
s case studies.Geotechnical Instrumentation and Applications?.explains?the geotechnical issues encountered in the implementation of construction projects dealing with ground, groundwater, and earth infrastructures, including land reclamations, dams, embankments, landfill construction, excavations, a作者: 態(tài)學(xué) 時間: 2025-3-27 16:51 作者: 開始從未 時間: 2025-3-27 17:55
https://doi.org/10.1007/978-3-642-59075-7 potential problem under control except for those instruments installed to obtain design parameters or to obtain baseline information. Planning of geotechnical instrumentation projects normally develops step by step as shown below:.Table . shows kinds of instrument installed prior to construction which can be used as baseline information.作者: 殘忍 時間: 2025-3-28 01:29
Planning Geotechnical Instrumentation Project, potential problem under control except for those instruments installed to obtain design parameters or to obtain baseline information. Planning of geotechnical instrumentation projects normally develops step by step as shown below:.Table . shows kinds of instrument installed prior to construction which can be used as baseline information.作者: 序曲 時間: 2025-3-28 05:45
Textbook 2023th ground, groundwater, and earth infrastructures, including land reclamations, dams, embankments, landfill construction, excavations, and tunnelling. The book describes the types of geotechnical instrumentation available in the market and walks readers through the geotechnical issues usually encoun作者: MELON 時間: 2025-3-28 07:23 作者: 字的誤用 時間: 2025-3-28 13:38
Engineering von Web-Applikationen,equency, monitoring process, data processing, data verification and presentation of monitored data are presented in this chapter. Automatic real-time monitoring system and recent development of data acquisition systems and visualization software are also discussed in this chapter.作者: Lipoprotein(A) 時間: 2025-3-28 18:26 作者: Isometric 時間: 2025-3-28 22:25 作者: 自作多情 時間: 2025-3-28 23:28
Analyses and Performance Assessment,vement, definitions of alert and target/trigger levels are different for each instrument. These will be explained in more details for the following types of issues in the following sections of this chapter.作者: intoxicate 時間: 2025-3-29 05:28