派博傳思國際中心

標題: Titlebook: Equipment Selection for Mining: With Case Studies; Christina N. Burt,Louis Caccetta Book 2018 Springer International Publishing AG 2018 Tr [打印本頁]

作者: bradycardia    時間: 2025-3-21 19:25
書目名稱Equipment Selection for Mining: With Case Studies影響因子(影響力)




書目名稱Equipment Selection for Mining: With Case Studies影響因子(影響力)學(xué)科排名




書目名稱Equipment Selection for Mining: With Case Studies網(wǎng)絡(luò)公開度




書目名稱Equipment Selection for Mining: With Case Studies網(wǎng)絡(luò)公開度學(xué)科排名




書目名稱Equipment Selection for Mining: With Case Studies被引頻次




書目名稱Equipment Selection for Mining: With Case Studies被引頻次學(xué)科排名




書目名稱Equipment Selection for Mining: With Case Studies年度引用




書目名稱Equipment Selection for Mining: With Case Studies年度引用學(xué)科排名




書目名稱Equipment Selection for Mining: With Case Studies讀者反饋




書目名稱Equipment Selection for Mining: With Case Studies讀者反饋學(xué)科排名





作者: Detoxification    時間: 2025-3-21 21:46
Studies in Systems, Decision and Controlhttp://image.papertrans.cn/e/image/313503.jpg
作者: STALL    時間: 2025-3-22 01:39
Winning the Hand of the Princess Saralinda,tant and challenging problem is that of selecting and allocating a fleet of trucks and loaders for use in extracting and moving ore and waste throughout the life of the mining operation. This fundamental problem is important as the cost of the truck and loader fleet is estimated to account for up?to
作者: 發(fā)酵    時間: 2025-3-22 05:53
Philip Heidelberger,Peter D. Welchinclude truck cycle time and a number of productivity measures for both trucks and loaders. The match factor, which is defined as the ratio of truck arrival rate to loader service time, is an important productivity indicator for trucks and loaders. The objective of the truck-loader optimisation prob
作者: ADORE    時間: 2025-3-22 11:21

作者: AIL    時間: 2025-3-22 13:35

作者: AIL    時間: 2025-3-22 20:16

作者: 沙發(fā)    時間: 2025-3-22 23:18

作者: 過于平凡    時間: 2025-3-23 03:20

作者: chandel    時間: 2025-3-23 08:17
Social Policy, Social Work and Psychology, equipment is often not utilised to full capacity and not accounting for this difference may lead to inferior solutions. In operations such as this, the cost of operating equipment depends on the age of the equipment while the utilisation of equipment is usually based on the equipment cost. The co-d
作者: 使混合    時間: 2025-3-23 10:53
Using Stock Market Data in Python,d. In a surface mine, equipment is often not utilised to full capacity and not accounting for this difference may lead to inferior solutions. Generally, the cost of operating equipment depends on the age of that equipment, while the decision to use a piece of equipment or not is based on the cost. T
作者: Indecisive    時間: 2025-3-23 14:06

作者: 政府    時間: 2025-3-23 21:24

作者: 無價值    時間: 2025-3-23 23:29

作者: 名詞    時間: 2025-3-24 03:57
Equipment Selection for Mining: With Case Studies978-3-319-76255-5Series ISSN 2198-4182 Series E-ISSN 2198-4190
作者: infelicitous    時間: 2025-3-24 08:17
Match Factor Extensionselected fleet. Prior to our work the match factor ratio has been restricted to homogeneous fleets. However, heterogeneous fleets are very common in large scale mines. In this chapter, we present a detailed account of the match factor ratio in mining and develop several extensions to the match factor ratio to allow for heterogeneous fleets.
作者: ethnology    時間: 2025-3-24 10:48
Future Research Directionsas been motivated and illustrated by real case studies provided by our industry collaborators. This final chapter discusses a number of open problems that provide important challenges to the research community.
作者: DEMUR    時間: 2025-3-24 18:46
Definitions and Results from Bers’ Theoryugh small and simple has interesting variation in truck cycle times. It represents a mine in the planning stage with pre-existing equipment. Our second case study, is from an ongoing mining operation and has pre-existing equipment and includes stockpiles. This data was provided by an in-house equipment selection expert from an industry partner.
作者: CRUDE    時間: 2025-3-24 22:22
Case Studiesugh small and simple has interesting variation in truck cycle times. It represents a mine in the planning stage with pre-existing equipment. Our second case study, is from an ongoing mining operation and has pre-existing equipment and includes stockpiles. This data was provided by an in-house equipment selection expert from an industry partner.
作者: LAST    時間: 2025-3-25 00:28
2198-4182 of trucks and loaders.Presents the truck and loader equipmenThis unique book presents innovative and state-of-the-art computational models for determining the optimal truck–loader selection and allocation strategy for use in large and complex mining operations. The authors provide comprehensive info
作者: 不要不誠實    時間: 2025-3-25 04:49
https://doi.org/10.1007/978-1-4612-5798-1arch literature. We also consider a number of closely related problems such as shovel-truck productivity, mining method selection, scheduling, dispatching and allocation problems. Our review considers a broad range of modelling and solution approaches that can or have been used for these related problems.
作者: 防御    時間: 2025-3-25 09:11

作者: Injunction    時間: 2025-3-25 15:28

作者: perimenopause    時間: 2025-3-25 17:07

作者: GRE    時間: 2025-3-25 23:49

作者: 防御    時間: 2025-3-26 03:11
Philip Heidelberger,Peter D. Welchning, this chapter also provides a brief introduction to Linear and Integer Programming. Mixed Integer Linear Programming models provide the best option to accurately model and address the difficult equipment selection problems.
作者: 美麗的寫    時間: 2025-3-26 04:45

作者: 惰性氣體    時間: 2025-3-26 10:28
Methodology: Preliminaries and?Backgroundning, this chapter also provides a brief introduction to Linear and Integer Programming. Mixed Integer Linear Programming models provide the best option to accurately model and address the difficult equipment selection problems.
作者: AVOW    時間: 2025-3-26 13:39
Utilisation-Based Equipment Selectionhis issue, we consider a single-location multiple-period mine. We present a mixed-integer linear program that achieves optimal equipment selection and accounts for the equipment utilisation. This model considers pre-existing equipment and allows for heterogeneous fleets. We illustrate our approach on a case study.
作者: 動脈    時間: 2025-3-26 16:47

作者: 不發(fā)音    時間: 2025-3-27 00:45
Methodology: Preliminaries and?Backgroundinclude truck cycle time and a number of productivity measures for both trucks and loaders. The match factor, which is defined as the ratio of truck arrival rate to loader service time, is an important productivity indicator for trucks and loaders. The objective of the truck-loader optimisation prob
作者: 容易生皺紋    時間: 2025-3-27 03:21
Literature Review selection problem in the construction industry. We review the modelling and solution methods that have emerged in both the mining and operations research literature. We also consider a number of closely related problems such as shovel-truck productivity, mining method selection, scheduling, dispatc
作者: 小臼    時間: 2025-3-27 07:17

作者: 謙虛的人    時間: 2025-3-27 11:51
Case Studiesomplex mining operations. To achieve this it is important to have real case studies that reflect the true nature of the problems to be addressed. In this chapter, we provide the data and background for two real case studies, one is a simple senario with one mining location and 9 periods each having
作者: 可能性    時間: 2025-3-27 14:25
Single Location Equipment Selectionctive is to determine a purchase and salvage policy for trucks and loaders such that the cost of materials handling is minimized over a multiple period schedule. This problem quickly becomes large scale when we consider large sets of possible trucks and loaders, and long schedules. The inclusion of
作者: Expertise    時間: 2025-3-27 18:32

作者: irreducible    時間: 2025-3-28 00:26

作者: 江湖郎中    時間: 2025-3-28 03:23
Accurate Costing of Mining Equipmentd. In a surface mine, equipment is often not utilised to full capacity and not accounting for this difference may lead to inferior solutions. Generally, the cost of operating equipment depends on the age of that equipment, while the decision to use a piece of equipment or not is based on the cost. T
作者: abracadabra    時間: 2025-3-28 07:31
Future Research Directionsimal truck-loader selection strategy for use in large and complex mining operations. We have reviewed the methodology developed over the past 50 years from the early ad hoc spreadsheet approaches to the current highly sophisticated and accurate mathematical based computational models. Our approach h
作者: 朦朧    時間: 2025-3-28 14:14

作者: disparage    時間: 2025-3-28 16:38
Erratum to: Equipment Selection for Mining: With Case Studies,
作者: PATHY    時間: 2025-3-28 22:14
Book 2018ile and robust computational models in order to refine their equipment selection and allocation strategy. As materials handling costs represent a significant component of total costs for mining operations, applyingthe optimization methodology developed here can substantially improve their competitiveness.
作者: OREX    時間: 2025-3-28 23:24

作者: myelography    時間: 2025-3-29 06:03

作者: Generalize    時間: 2025-3-29 11:16





歡迎光臨 派博傳思國際中心 (http://www.pjsxioz.cn/) Powered by Discuz! X3.5
乐陵市| 巧家县| 桐庐县| 玛纳斯县| 云梦县| 左云县| 当雄县| 澄江县| 长春市| 浠水县| 凤阳县| 米泉市| 兴海县| 新余市| 邓州市| 九江县| 乌什县| 阳东县| 贵港市| 庆元县| 商水县| 财经| 舒兰市| 清流县| 剑川县| 新兴县| 汽车| 勐海县| 永州市| 读书| 习水县| 右玉县| 中西区| 定安县| 铜川市| 洮南市| 麻城市| 泉州市| 青海省| 和顺县| 枣强县|