標題: Titlebook: Environmental Management in Mega Construction Projects; Jianming Yang Book 2017 East China University of Science and Technology Press and [打印本頁] 作者: osteomalacia 時間: 2025-3-21 16:27
書目名稱Environmental Management in Mega Construction Projects影響因子(影響力)
書目名稱Environmental Management in Mega Construction Projects影響因子(影響力)學科排名
書目名稱Environmental Management in Mega Construction Projects網(wǎng)絡公開度
書目名稱Environmental Management in Mega Construction Projects網(wǎng)絡公開度學科排名
書目名稱Environmental Management in Mega Construction Projects被引頻次
書目名稱Environmental Management in Mega Construction Projects被引頻次學科排名
書目名稱Environmental Management in Mega Construction Projects年度引用
書目名稱Environmental Management in Mega Construction Projects年度引用學科排名
書目名稱Environmental Management in Mega Construction Projects讀者反饋
書目名稱Environmental Management in Mega Construction Projects讀者反饋學科排名
作者: 墊子 時間: 2025-3-21 23:23 作者: intuition 時間: 2025-3-22 01:36
Environmental Management in Mega Construction Projects978-981-10-3605-7作者: onlooker 時間: 2025-3-22 06:50 作者: BORE 時間: 2025-3-22 10:01 作者: 輕彈 時間: 2025-3-22 15:09
978-981-10-9919-9East China University of Science and Technology Press and Springer Nature Singapore Pte Ltd. 2017作者: 輕彈 時間: 2025-3-22 17:29 作者: minion 時間: 2025-3-22 21:45 作者: 嘲笑 時間: 2025-3-23 04:55
The Four Elements of Rural Settlement Form,on project. Therefore, for the mega construction project, environmental training shall be conducted stage by stage to be more effective on all on-site management staff and on-site construction workers. We recommend the following stages.作者: malapropism 時間: 2025-3-23 07:02
Trainingon project. Therefore, for the mega construction project, environmental training shall be conducted stage by stage to be more effective on all on-site management staff and on-site construction workers. We recommend the following stages.作者: extract 時間: 2025-3-23 10:30
The Pattern and Uniform Integrals,The personnel and organization of environment management are decided by the project management model of the mega construction project. Project management is categorized by the nature of different works and organizational characteristics, listed as below:作者: 把手 時間: 2025-3-23 15:02
https://doi.org/10.1007/978-1-4419-8624-5Environmental Jian Li must be employed on mega projects to assist the owner’s environment management team with project’s environment supervision.作者: Mangle 時間: 2025-3-23 22:04 作者: 偽書 時間: 2025-3-23 23:53 作者: 我吃花盤旋 時間: 2025-3-24 05:34 作者: 掃興 時間: 2025-3-24 08:39 作者: bromide 時間: 2025-3-24 12:36
Environmental MonitoringEnvironmental Monitor is to use the modern science and technical method of physical, chemical, and biological to monitor and measure the factors about environmental chemical pollutants and the physical and biological pollution on site intermittently or continuously, and makes the right environmental quality assessment.作者: ostracize 時間: 2025-3-24 15:59
The Preparation for Environmental Protection EquipmentEnvironmental Protection Equipment refers to equipment specialized on environmental pollution control including water pollution control equipment, air pollution control equipment, solid waste handling equipment and noise control equipment.作者: Aprope 時間: 2025-3-24 21:50
Fractional Factorial Designs: General Case,and American companies. Compared to ISO9000 quality management system and ISO14000 environment management system, EHS has safety included. Safety, environment, and health management are actually closely interrelated in production and construction practices, thus are integrated as EHS management syst作者: ESO 時間: 2025-3-24 23:48 作者: lattice 時間: 2025-3-25 04:32
Average-Case Analysis of , programs,t Assessment is a necessary starting point to ensure that all the project processes are in compliance with laws and regulations. The bigger the size and importance of the project, the more scientifically solid and accurate its EIA should be. Meanwhile, project executives and environment management t作者: 墊子 時間: 2025-3-25 07:39
https://doi.org/10.1007/978-3-658-27024-7le printing and dyeing industry, metal surface treatment, metal smelting and rolling industry, nonmetallic mineral products industry, leather tanning industry, metal casting processing industry, the production, storage and use of hazardous chemicals, the pesticide production industry, the collection作者: arousal 時間: 2025-3-25 13:14
1919–26: The Failure of Monetary Deflationnment team as well. Undoubtedly, it plays a pivotal role in effective environment management for the construction project to well plan and utilize environment budget within limited amount of the overall budget. Otherwise, without adequate budget, the environment management will not be feasible, howe作者: TAP 時間: 2025-3-25 16:07 作者: 使長胖 時間: 2025-3-25 21:40
A Monograph of the Fontinalaceaery for environment management team to look into every step of tendering. The “tendering” referred to hereby basically include the requirements in the environment protection part of the tender document for General Contractor candidates, and the tendering for dedicated environment protection facilitie作者: 放牧 時間: 2025-3-26 04:12
Religious Arguments Against Prostitution,. Meanwhile, there are various risks existing in the construction process which would cause severe accident with wide scope of influence compared to medium–small-sized project. Generally speaking, the risk is mainly presented as follows: Personnel injury due to safety accident, environmental polluti作者: 整頓 時間: 2025-3-26 06:20
https://doi.org/10.1057/9781137528681pplication of citizen, corporate or other organization, grants he/she/it the right to engage in certain activities after reviewing the legality. Environmental remediation is costly, sometimes the pollution cannot even be remediated, and therefore environmental protection should focus on prevention, 作者: 膝蓋 時間: 2025-3-26 12:15
The Four Elements of Rural Settlement Form,on project. Therefore, for the mega construction project, environmental training shall be conducted stage by stage to be more effective on all on-site management staff and on-site construction workers. We recommend the following stages.作者: 格子架 時間: 2025-3-26 12:57
Circulation and Single-Currency Unionsanwhile, the improper drainage of storm water in office area and workers’ accommodation area will impact the project management and workers’ life, thus impact the process of the project. As a result, it is necessary to set up effective temporary storm water drainage system at construction site, offi作者: 狼群 時間: 2025-3-26 20:49 作者: BLA 時間: 2025-3-26 21:35
Angélique Ciza Neema,Lebailly Philippeannoyance to human being, such as deafening machine sound and explosive sound which will harm the human ear. This kind of unpleasant sound is called noise. Environmental noise refers to the noise that disturbs the surrounding environment during industrial production, construction, transportation, an作者: 舊石器時代 時間: 2025-3-27 04:03 作者: 殘廢的火焰 時間: 2025-3-27 09:22 作者: 沒收 時間: 2025-3-27 09:32 作者: 易怒 時間: 2025-3-27 15:56
Environmental Impact Assessmentt Assessment is a necessary starting point to ensure that all the project processes are in compliance with laws and regulations. The bigger the size and importance of the project, the more scientifically solid and accurate its EIA should be. Meanwhile, project executives and environment management t作者: Capitulate 時間: 2025-3-27 20:45
Soil Assessmentle printing and dyeing industry, metal surface treatment, metal smelting and rolling industry, nonmetallic mineral products industry, leather tanning industry, metal casting processing industry, the production, storage and use of hazardous chemicals, the pesticide production industry, the collection作者: 收到 時間: 2025-3-27 22:08
Estimationnment team as well. Undoubtedly, it plays a pivotal role in effective environment management for the construction project to well plan and utilize environment budget within limited amount of the overall budget. Otherwise, without adequate budget, the environment management will not be feasible, howe作者: 拱形大橋 時間: 2025-3-28 02:20 作者: Vulnerary 時間: 2025-3-28 08:20 作者: DEAWL 時間: 2025-3-28 12:54 作者: 說笑 時間: 2025-3-28 18:30 作者: Legion 時間: 2025-3-28 22:14 作者: 上釉彩 時間: 2025-3-28 22:55
Storm Water Drainageanwhile, the improper drainage of storm water in office area and workers’ accommodation area will impact the project management and workers’ life, thus impact the process of the project. As a result, it is necessary to set up effective temporary storm water drainage system at construction site, offi作者: 直言不諱 時間: 2025-3-29 06:14 作者: 凈禮 時間: 2025-3-29 07:38 作者: 種類 時間: 2025-3-29 12:27
EHS Concept and Interrelationironment, and health management are actually closely interrelated in production and construction practices, thus are integrated as EHS management system. Security management sometimes is incorporated in EHS in some European and American companies or construction projects, so that they can be managed as HSSE comprehensively.作者: 油氈 時間: 2025-3-29 17:38 作者: 夸張 時間: 2025-3-29 23:38
Environmental Impact Assessmentnd importance of the project, the more scientifically solid and accurate its EIA should be. Meanwhile, project executives and environment management team should thoroughly study and understand the environment assessment report, which will be beneficial for subsequent environment management.作者: 統(tǒng)治人類 時間: 2025-3-30 00:56 作者: figure 時間: 2025-3-30 04:23 作者: 躺下殘殺 時間: 2025-3-30 09:35
1919–26: The Failure of Monetary Deflationver smart the principles and goals may be. Furthermore, to make every cent counts, the efficiency of budget spending must be taken care of and supervised, fending off all the uncontrollable factors, so as to make sure of the actual execution of budgets.作者: persistence 時間: 2025-3-30 14:50 作者: Maximize 時間: 2025-3-30 17:07
Circulation and Single-Currency Unionsce area, and worker accommodation area as well as to keep the drainage clear. If site condition meets, it is better to leverage the permanent storm water drainage facilities, which is established at site.作者: gastritis 時間: 2025-3-31 00:24 作者: frozen-shoulder 時間: 2025-3-31 03:30
Angélique Ciza Neema,Lebailly Philipped social life. Environmental noise pollution refers to the phenomenon that the environmental noise exceeds the national emission standard for environmental noise and affects the normal work, study, and life of people.作者: 小臼 時間: 2025-3-31 05:45
in China.Provides scientific methods and technical tools toThis book discusses environmental management and construction management approaches to the environmental problems that can emerge in construction projects. It sets a brand new standard for environmental management in mega construction proje作者: Flatus 時間: 2025-3-31 10:43
Fractional Factorial Designs: General Case,ironment, and health management are actually closely interrelated in production and construction practices, thus are integrated as EHS management system. Security management sometimes is incorporated in EHS in some European and American companies or construction projects, so that they can be managed as HSSE comprehensively.作者: 排出 時間: 2025-3-31 14:55 作者: conjunctivitis 時間: 2025-3-31 18:37 作者: antecedence 時間: 2025-3-31 23:30
A Monograph of the Fontinalaceaeenvironment protection part of the tender document for General Contractor candidates, and the tendering for dedicated environment protection facilities for this project as well. It takes some craftsmanship to do tender management. A well-managed tender can take predominant effect on the contractor’s performance after boarding.