派博傳思國際中心

標題: Titlebook: Engineering Asset Management; Proceedings of the F Dimitris Kiritsis,Christos Emmanouilidis,Joseph Ma Conference proceedings 2010 Springer- [打印本頁]

作者: Detrusor-Muscle    時間: 2025-3-21 18:16
書目名稱Engineering Asset Management影響因子(影響力)




書目名稱Engineering Asset Management影響因子(影響力)學科排名




書目名稱Engineering Asset Management網絡公開度




書目名稱Engineering Asset Management網絡公開度學科排名




書目名稱Engineering Asset Management被引頻次




書目名稱Engineering Asset Management被引頻次學科排名




書目名稱Engineering Asset Management年度引用




書目名稱Engineering Asset Management年度引用學科排名




書目名稱Engineering Asset Management讀者反饋




書目名稱Engineering Asset Management讀者反饋學科排名





作者: Invigorate    時間: 2025-3-21 21:49
A model for more accurate maintenance decisionsnsidered. This paper also applies Cumulative Sum (CUSUM) Chart for identifying the time of damage initiation and reducing false alarms. Techniques for assessing the probability of failure of a component and its residual life, and predicting the vibration level at the next planned measuring opportuni
作者: packet    時間: 2025-3-22 03:00
School Buildings Assets - Maintenance Management and Organization for Vertical Transportation Equipmhools focusing on the elements and infrastructures related to vertical transportation of people with physical deficiencies. It will be also presented a cost analysis of these infrastructures maintenance and operation in order to reach the optimum point that allows the reduction of these costs withou
作者: cutlery    時間: 2025-3-22 05:06
A review on the optimisation of aircraft maintenance with application to landing gearshanisms used for extension, retraction and locking of the landing gears. The future of which will see the introduction of electromechanical replacements for the hydraulic systems present on the majority of civil aircraft. These actuators can be regarded as mission critical systems that must be guara
作者: CRATE    時間: 2025-3-22 11:49
Risk-based approach for managing road surface friction of road assetsn be managed such as road surface friction (or skid resistance of road surface). A riskbased method for managing road surface friction (i.e. skid resistance) is presented in this paper. The risk-based method incorporates ‘risk’ into the analysis of skid resistance and crash rate, by linking the stat
作者: 鐵塔等    時間: 2025-3-22 16:18

作者: 鐵塔等    時間: 2025-3-22 17:32

作者: instructive    時間: 2025-3-23 00:54
Function performance evaluation and its application for design modification based on product usage dhe BOL phase for design modification so as to improve the product. To do this, we define new terms regarding function performance considering the historical change of function performance. The proposed definitions are developed to be used in design modification so that they help engineers to underst
作者: metropolitan    時間: 2025-3-23 02:17

作者: 包庇    時間: 2025-3-23 06:10

作者: 使增至最大    時間: 2025-3-23 17:14

作者: 單純    時間: 2025-3-23 19:46

作者: 熱心助人    時間: 2025-3-24 02:04
Technik aus soziologischer Perspektive 2nsidered. This paper also applies Cumulative Sum (CUSUM) Chart for identifying the time of damage initiation and reducing false alarms. Techniques for assessing the probability of failure of a component and its residual life, and predicting the vibration level at the next planned measuring opportuni
作者: ICLE    時間: 2025-3-24 05:49

作者: 束以馬具    時間: 2025-3-24 06:50
https://doi.org/10.1007/978-3-642-99434-0hanisms used for extension, retraction and locking of the landing gears. The future of which will see the introduction of electromechanical replacements for the hydraulic systems present on the majority of civil aircraft. These actuators can be regarded as mission critical systems that must be guara
作者: NAVEN    時間: 2025-3-24 11:04

作者: bizarre    時間: 2025-3-24 14:58
https://doi.org/10.1007/978-3-662-13094-0 and subsequent asset management process architecture, a standard knowledge-engineering methodology is followed. This involves text analysis, definition and classification of terms and visualisation through an appropriate tool (in this case, the Protégé application was used). The result of this rese
作者: 權宜之計    時間: 2025-3-24 19:29
,Das mikroskopische Blutpr?parat, other operational systems and administrative legacy systems. The intertwined nature of operational and information technologies suggest that this information provides for the control of asset management tasks and also acts as an instrument for informed and quality decision support. There exposes th
作者: Abjure    時間: 2025-3-25 00:31

作者: 賞錢    時間: 2025-3-25 05:41
https://doi.org/10.1007/978-3-642-99018-2ganization must take part, it is also of importance to consider the experience given by the technical staff for maintenance and warranty. As result, this paper will show basically how analyzing the past performance is possible to foresee and control the future. In our case, it will be possible to ob
作者: 壯麗的去    時間: 2025-3-25 08:57
,Desorption als k?lteerzeugender Vorgang,which includes, e.g. provision of spare parts during the entire usage phase, storing, refurbishment, recycling and even the support of relocation of production facilities. Intelligent remote services have great potential for realizing all these partnerships. To realize such engineering asset-related
作者: 很像弓]    時間: 2025-3-25 14:10
,Me?technik, Prüfsignale, Toleranzen,ng beyond the first promising step. As a first step in the formulation of a new research programme an interview round was conducted with a number of infrastructure asset managers to get a better feel for what the precise barriers and challenges were. In this paper the results of the interviews are p
作者: 傻瓜    時間: 2025-3-25 19:04

作者: BIAS    時間: 2025-3-25 21:15

作者: 爆炸    時間: 2025-3-26 03:49
http://image.papertrans.cn/e/image/310725.jpg
作者: initiate    時間: 2025-3-26 05:52

作者: Annotate    時間: 2025-3-26 09:53

作者: choleretic    時間: 2025-3-26 14:03

作者: 獨輪車    時間: 2025-3-26 17:24
Die Verarbeitung der fetten ?le und Fettenaging the asset performance is critical for long term economic and business viability. Assessing the asset performance is a complex issue as it involves multiple inputs and outputs; and various stakeholders’ dynamic requirements. Lack of integration among various stakeholders and their changing req
作者: 舊石器時代    時間: 2025-3-27 00:50

作者: 無意    時間: 2025-3-27 04:03
B. K?nig,N. Dum,J. Odar,R. Schosserridges in use today were built decades ago and are now subjected to changes in load patterns that can cause localized distress, which can result in bridge failure if not corrected. Early detection of damage helps in prolonging lives of bridges and preventing catastrophic failures. This paper briefly
作者: 沉默    時間: 2025-3-27 05:20

作者: 合群    時間: 2025-3-27 13:00

作者: 浪費物質    時間: 2025-3-27 15:01

作者: Narcissist    時間: 2025-3-27 20:21
M. E. Müller,M. Allg?wer,H. WilleneggerS$230 billion on its network. Worldwide, the economic cost of road crashes is estimated to be around US$518 billion each year. It is therefore in both the sociological and economic interests of society that attempts are made to reduce, as much as possible, the level and severity of crashes. There ar
作者: 懶鬼才會衰弱    時間: 2025-3-27 22:06

作者: 沒有準備    時間: 2025-3-28 04:44
Die Grundmaterialien und ihre Verarbeitung,from autonomous systems to cooperative and sharing information’ system based on software platform. However, this need gives rise to various maintenance platforms. The first part of this study investigates the different types of existing industrial platforms and characterizes them compared to two cri
作者: 多樣    時間: 2025-3-28 10:11
,Das mikroskopische Blutpr?parat,mation from every repository that will provide them the necessary information for good decisions to be made. Asset managing organisations have in recent times moved towards integrating many of their information systems but have, in most cases, focused on the business process enabling properties of i
作者: 弄臟    時間: 2025-3-28 10:25
Die Darstellung der Markscheiden,ly in PLM models, time is an attribute in parts such as “activities” and “events” or is a separate part of the model (“four dimensional models”) to which other parts are associated through relationships. In this work a generic idea has been developed about how to make better treatment of time in PLM
作者: adhesive    時間: 2025-3-28 18:06
https://doi.org/10.1007/978-3-642-99017-5ces (PEIDs, Kiritsis . (2004)), advanced sensors, internet, wireless telecommunication, and so on. Using them, companies can access working products directly, monitor and handle products remotely, and transfer generated data back to appropriate company repositories wirelessly. However, the applicati
作者: 背景    時間: 2025-3-28 21:30
Die Darstellung der Ganglienzellen,and judge maintenance performance and act on deviations before it is too late. It is always necessary for a company to act for increasing profit and consequently enhance its competitiveness. In this paper, a software model (MainSave) has been developed for mapping, monitoring, analysis, following up
作者: heart-murmur    時間: 2025-3-29 01:47
https://doi.org/10.1007/978-3-642-99018-2s deliverables during a specific period of time and following a scheduled distribution. With the sale of a product, the manufacturer is nowadays obliged contractually to perform warranty assistance to the buyer. Decreasing the incurred costs is clearly not the only aspect to achieve, since the decis
作者: 反復無常    時間: 2025-3-29 03:12
,Desorption als k?lteerzeugender Vorgang,ing asset management, which is the total management of physical – not financial – assets [1]. The overall goal is to enhance the efficiency of the engineering asset, e.g. to reduce TCO, on the customers′ site by means of value creating partnerships [14]. These partnerships may be, e.g. the classical
作者: 身心疲憊    時間: 2025-3-29 10:08

作者: Affirm    時間: 2025-3-29 12:24

作者: EVICT    時間: 2025-3-29 15:50

作者: FECT    時間: 2025-3-29 23:21
Collaborative development of Maintenance investment management: A case study in pulp and paper indusbusiness. In the case presented in this paper, an external service provider has taken the responsibility of the maintenance functions as a strategic partner. A development project was started to support the creation of profound and functional partnership. Focus of the project was to support the prac
作者: 獨裁政府    時間: 2025-3-30 01:34

作者: 膠狀    時間: 2025-3-30 05:15

作者: certitude    時間: 2025-3-30 09:35
Integrated strategic asset performance assessmentnaging the asset performance is critical for long term economic and business viability. Assessing the asset performance is a complex issue as it involves multiple inputs and outputs; and various stakeholders’ dynamic requirements. Lack of integration among various stakeholders and their changing req
作者: 起波瀾    時間: 2025-3-30 15:18
Assessing the subjective added value of value nets: Which network strategies are really win-win?s and service companies increases. Currently an increasing number of services are purchased from service supply networks. Furthermore, globalisation, complexity of technological innovations and demand for integrated solutions also create need for networking and collaboration. Establishing or improvi
作者: 瘋狂    時間: 2025-3-30 16:37
Application of acoustic emission technology in monitoring structural integrity of bridgesridges in use today were built decades ago and are now subjected to changes in load patterns that can cause localized distress, which can result in bridge failure if not corrected. Early detection of damage helps in prolonging lives of bridges and preventing catastrophic failures. This paper briefly
作者: 連詞    時間: 2025-3-30 20:58
Application of text mining in analysing road crashes for road asset managementy the major and multiple contributory factors to those road crashes. This paper presents a text mining based method to better understand the contextual relationships inherent in road crashes. By examining and analyzing the crash report data in Queensland from year 2004 and year 2005, this paper iden
作者: LARK    時間: 2025-3-31 01:12
School Buildings Assets - Maintenance Management and Organization for Vertical Transportation Equipmic instrument maximizing items life cycle and minimizing maintenance costs. The law in force regarding the Abolition of Architectural Barriers was conceived to facilitate the access to buildings of people with physical deficiencies, but even after its endorsement, there are still Portuguese Schools
作者: 高深莫測    時間: 2025-3-31 08:21
A review on the optimisation of aircraft maintenance with application to landing gearstive maintenance scheduling. Within today’s competitive aerospace market innovative maintenance solutions are required to optimise aircraft maintenance, for both single aircraft and the entire fleet, ensuring that operators obtain the maximum availability from their aircraft. This has led to a move
作者: 全面    時間: 2025-3-31 09:42
Risk-based approach for managing road surface friction of road assetsS$230 billion on its network. Worldwide, the economic cost of road crashes is estimated to be around US$518 billion each year. It is therefore in both the sociological and economic interests of society that attempts are made to reduce, as much as possible, the level and severity of crashes. There ar
作者: headlong    時間: 2025-3-31 15:54
Building an ontology and process architecture for engineering asset managementhat a much larger array of processes govern the life and use of an asset. With this, asset management’s new paradigm seeks a holistic, multi-disciplinary approach to the management of physical assets. A growing number of organisations now seek to develop integrated asset management frameworks and bo
作者: 門窗的側柱    時間: 2025-3-31 20:08

作者: 誓言    時間: 2025-3-31 21:51

作者: 范例    時間: 2025-4-1 05:01
An advanced method for time treatment in product lifecycle management modelsly in PLM models, time is an attribute in parts such as “activities” and “events” or is a separate part of the model (“four dimensional models”) to which other parts are associated through relationships. In this work a generic idea has been developed about how to make better treatment of time in PLM
作者: 現(xiàn)存    時間: 2025-4-1 08:11

作者: irritation    時間: 2025-4-1 12:49

作者: Facet-Joints    時間: 2025-4-1 14:52
Case study: Warranty costs estimation according to a defined lifetime distribution of deliverabless deliverables during a specific period of time and following a scheduled distribution. With the sale of a product, the manufacturer is nowadays obliged contractually to perform warranty assistance to the buyer. Decreasing the incurred costs is clearly not the only aspect to achieve, since the decis
作者: 貝雷帽    時間: 2025-4-1 20:17
Remote service concepts for intelligent tool-machine systemsing asset management, which is the total management of physical – not financial – assets [1]. The overall goal is to enhance the efficiency of the engineering asset, e.g. to reduce TCO, on the customers′ site by means of value creating partnerships [14]. These partnerships may be, e.g. the classical
作者: 容易做    時間: 2025-4-2 00:09
The state of Asset Management in the Netherlandsg, recent years have demonstrated that there is a move from the public domain to a more privatised setting. On the one side, customers become more critical and demand better quality and better service, whereas on the other side a need arises to limit the (public) costs of infrastructures. To cope wi
作者: NAV    時間: 2025-4-2 02:57





歡迎光臨 派博傳思國際中心 (http://www.pjsxioz.cn/) Powered by Discuz! X3.5
时尚| 乐昌市| 达尔| 绥中县| 方正县| 武安市| 十堰市| 乌鲁木齐市| 高州市| 曲麻莱县| 福鼎市| 香格里拉县| 宿迁市| 呼图壁县| 宁城县| 桐乡市| 柯坪县| 古蔺县| 公安县| 阿巴嘎旗| 宁德市| 青海省| 拉萨市| 嘉祥县| 郎溪县| 石家庄市| 图木舒克市| 龙里县| 岳西县| 偃师市| 友谊县| 自治县| 武冈市| 五大连池市| 黎平县| 监利县| 阆中市| 哈密市| 同仁县| 舟山市| 庆阳市|