派博傳思國際中心

標(biāo)題: Titlebook: Electric Power System Planning; Issues, Algorithms a Hossein Seifi,Mohammad Sadegh Sepasian Book 2011 Springer-Verlag Berlin Heidelberg 201 [打印本頁]

作者: 積聚    時(shí)間: 2025-3-21 19:02
書目名稱Electric Power System Planning影響因子(影響力)




書目名稱Electric Power System Planning影響因子(影響力)學(xué)科排名




書目名稱Electric Power System Planning網(wǎng)絡(luò)公開度




書目名稱Electric Power System Planning網(wǎng)絡(luò)公開度學(xué)科排名




書目名稱Electric Power System Planning被引頻次




書目名稱Electric Power System Planning被引頻次學(xué)科排名




書目名稱Electric Power System Planning年度引用




書目名稱Electric Power System Planning年度引用學(xué)科排名




書目名稱Electric Power System Planning讀者反饋




書目名稱Electric Power System Planning讀者反饋學(xué)科排名





作者: Irrigate    時(shí)間: 2025-3-21 22:33
1612-1287 some details in Chapter 2. Moreover, PSP decision makings are based on both technical and economic considerations, so economic principles are briefly reviewed in C978-3-642-26889-2978-3-642-17989-1Series ISSN 1612-1287 Series E-ISSN 1860-4676
作者: 樹木中    時(shí)間: 2025-3-22 02:21
Power System Planning in the Presence of Uncertainties,itional GEP may also be used in the de-regulated environment; now, from other entities viewpoints. If GEP is decided by some entities based on their own judgements, how can a different or some different entities proceed towards the other steps (SEP, NEP and RPP) if they cannot make sure what the GEP
作者: gonioscopy    時(shí)間: 2025-3-22 07:36
,B?rsenplatzwahlen als Gruppenentscheidung,itional GEP may also be used in the de-regulated environment; now, from other entities viewpoints. If GEP is decided by some entities based on their own judgements, how can a different or some different entities proceed towards the other steps (SEP, NEP and RPP) if they cannot make sure what the GEP
作者: thalamus    時(shí)間: 2025-3-22 10:24

作者: Pulmonary-Veins    時(shí)間: 2025-3-22 15:24

作者: Pulmonary-Veins    時(shí)間: 2025-3-22 18:10

作者: construct    時(shí)間: 2025-3-22 21:49

作者: patriot    時(shí)間: 2025-3-23 04:44

作者: Etymology    時(shí)間: 2025-3-23 07:47
Clémentine Cottineau,Irina Frost other words, such as, demand and consumption are also used instead of load, we use load as the most common term. The actual term is electric load; however, electric is omitted here and assumed to be obvious. It is well understood that both the energy (MWh, kWh) and the power (MW, kW) are the two ba
作者: staging    時(shí)間: 2025-3-23 10:59
Internationale Arbeitnehmerbesteuerungent (typically the most economical) manner while various technical or non-technical constraints are met. The approach presented in . was based on single bus representation of the system. In other words, we basically ignored the transmission system and found out the total generation requirements base
作者: unstable-angina    時(shí)間: 2025-3-23 16:18

作者: Incumbent    時(shí)間: 2025-3-23 20:02
Ellen Ehmke,Aino Simon,Jenny Simonns were, somehow, accounted for, the modeling was very approximate and needs much further investigations. The so called . (NEP) process tries to find the optimum routes between the generation buses (determined in GEP phase) and the load centers (determined from load forecasting) via substations (det
作者: 多產(chǎn)子    時(shí)間: 2025-3-23 23:12

作者: CRACY    時(shí)間: 2025-3-24 05:35

作者: frenzy    時(shí)間: 2025-3-24 08:29
,B?rsenplatzwahlen als Gruppenentscheidung,ns are made by a single entity. Moreover, we assumed that the information used lacks any uncertainty. None of the above is strictly true. In terms of the former, due to power system de-regulating, GEP, from one side, is unbundled from the others (SEP, NEP and RPP). Some new market participants act a
作者: faultfinder    時(shí)間: 2025-3-24 13:26
Hossein Seifi,Mohammad Sadegh SepasianSelf-Contained and Self-learning book.Includes Numerous Examples and a Power Planning Toolbox for Matlab.Problems and Solutions are solved in Matlab files
作者: membrane    時(shí)間: 2025-3-24 17:58

作者: 上流社會    時(shí)間: 2025-3-24 19:12

作者: overweight    時(shí)間: 2025-3-25 02:03
Internationale Arbeitnehmerbesteuerungent (typically the most economical) manner while various technical or non-technical constraints are met. The approach presented in . was based on single bus representation of the system. In other words, we basically ignored the transmission system and found out the total generation requirements based on an optimization model.
作者: 燈絲    時(shí)間: 2025-3-25 03:42

作者: 記憶    時(shí)間: 2025-3-25 09:04

作者: farewell    時(shí)間: 2025-3-25 14:59
Das Problemfeld Cybersicherheit,tudes are, normally, of main concern, during the last, perhaps, two decades, voltage stability is also received attention in literature. In this section, we try to briefly, differentiate between these two aspects of voltage performance of a system. Following that, we review some of the indices which may be used for each case.
作者: Medicare    時(shí)間: 2025-3-25 19:44
Some Economic Principles,onfronted with revenues and costs; resulting in economic principles to be continuously observed. The emerged electric power markets have resulted in full involvements of this industry in economic based theories, applications and principles.
作者: 偏見    時(shí)間: 2025-3-25 22:00

作者: 虛假    時(shí)間: 2025-3-26 01:01

作者: BRAWL    時(shí)間: 2025-3-26 04:46
Network Expansion Planning, an Advanced Approach,ailable 230?kV line. In terms of the susceptance, it is assumed that . of the 400?kV line is 2.5 times that of the 230?kV line. Moreover assume that its thermal capacity is three times higher than that of the 230?kV line.
作者: vasospasm    時(shí)間: 2025-3-26 09:49
Reactive Power Planning,tudes are, normally, of main concern, during the last, perhaps, two decades, voltage stability is also received attention in literature. In this section, we try to briefly, differentiate between these two aspects of voltage performance of a system. Following that, we review some of the indices which may be used for each case.
作者: fastness    時(shí)間: 2025-3-26 13:03

作者: prosperity    時(shí)間: 2025-3-26 17:50

作者: 紅潤    時(shí)間: 2025-3-26 23:55
https://doi.org/10.1007/978-3-642-17989-1Electrical Networks; GEP; Matlab; NEP; PSP; Power System Planning; SEP; Transmission
作者: excursion    時(shí)間: 2025-3-27 04:43
Power System Planning, Basic Principles,ing a large number of countries, or even continents. Nowadays, an electric power system is one of the man-made largest scale systems; ever made, comprising of huge number of components; starting from low power electric appliances to very high power giant turbo-generators. Running this very large sys
作者: 座右銘    時(shí)間: 2025-3-27 09:18
Optimization Techniques,ent) can be determined. For instance, in an ., the active power generations of power plants may be the decision variables. The dependent variables can be the total fuel consumption, system losses, etc. which can be calculated upon determining the decision variables. In a ., the locations and the siz
作者: 誘騙    時(shí)間: 2025-3-27 10:21

作者: 半球    時(shí)間: 2025-3-27 16:50
Load Forecasting, other words, such as, demand and consumption are also used instead of load, we use load as the most common term. The actual term is electric load; however, electric is omitted here and assumed to be obvious. It is well understood that both the energy (MWh, kWh) and the power (MW, kW) are the two ba
作者: 向下    時(shí)間: 2025-3-27 21:05

作者: 撫育    時(shí)間: 2025-3-27 22:32
Substation Expansion Planning, with the least costs, various operational constraints are met. In the so-called Substation Expansion Planning (SEP), the problem is to determine the required expansion capacities of the existing substations as well as the locations and the sizes of new substations together with the required availab
作者: 縮短    時(shí)間: 2025-3-28 02:16
Network Expansion Planning, a Basic Approach,ns were, somehow, accounted for, the modeling was very approximate and needs much further investigations. The so called . (NEP) process tries to find the optimum routes between the generation buses (determined in GEP phase) and the load centers (determined from load forecasting) via substations (det
作者: 知識分子    時(shí)間: 2025-3-28 06:53

作者: Extemporize    時(shí)間: 2025-3-28 11:41
Reactive Power Planning,tudes are, normally, of main concern, during the last, perhaps, two decades, voltage stability is also received attention in literature. In this section, we try to briefly, differentiate between these two aspects of voltage performance of a system. Following that, we review some of the indices which
作者: 破譯    時(shí)間: 2025-3-28 17:28

作者: GENRE    時(shí)間: 2025-3-28 19:04

作者: fleeting    時(shí)間: 2025-3-29 01:46

作者: SLUMP    時(shí)間: 2025-3-29 05:18

作者: assail    時(shí)間: 2025-3-29 08:38
Substation Expansion Planning,required expansion capacities of the existing substations as well as the locations and the sizes of new substations together with the required availability times, so that the loads can be adequately supplied.
作者: 駁船    時(shí)間: 2025-3-29 13:11
Book 2011on long-term issues, although much of the ideas may be used for short and mid-term cases, with some modifications. Back-up materials are provided in twelve appendices of the book. The readers can use the numerous examples presented within the chapters and problems at the end of the chapters, to make
作者: 故意釣到白楊    時(shí)間: 2025-3-29 17:19

作者: 朦朧    時(shí)間: 2025-3-29 20:28
Engagement, Hybridization and Resistance be the total fuel consumption, system losses, etc. which can be calculated upon determining the decision variables. In a ., the locations and the sizing of the capacitor banks are the decision variables, whereas the dependent variables may be bus voltages, system losses, etc.
作者: 獨(dú)輪車    時(shí)間: 2025-3-30 01:10
https://doi.org/10.1007/978-3-86226-419-3required expansion capacities of the existing substations as well as the locations and the sizes of new substations together with the required availability times, so that the loads can be adequately supplied.




歡迎光臨 派博傳思國際中心 (http://www.pjsxioz.cn/) Powered by Discuz! X3.5
望城县| 青州市| 蒲城县| 平利县| 宾川县| 吉安县| 武山县| 明星| 博乐市| 砀山县| 双柏县| 南漳县| 报价| 高碑店市| 沙坪坝区| 阿克| 武穴市| 昂仁县| 陈巴尔虎旗| 宿州市| 枣庄市| 德阳市| 曲周县| 龙南县| 宜都市| 尉氏县| 新乐市| 呼伦贝尔市| 罗源县| 奇台县| 蒲江县| 平潭县| 肃北| 桃江县| 静安区| 泾源县| 扎囊县| 新巴尔虎左旗| 敦化市| 黔东| 岳阳县|