標(biāo)題: Titlebook: Effective Front-End Strategies to Reduce Waste on Construction Projects; Peter G. Rundle,Alireza Bahadori,Ken Doust Book 2019 Springer Nat [打印本頁] 作者: Hemochromatosis 時間: 2025-3-21 17:02
書目名稱Effective Front-End Strategies to Reduce Waste on Construction Projects影響因子(影響力)
書目名稱Effective Front-End Strategies to Reduce Waste on Construction Projects影響因子(影響力)學(xué)科排名
書目名稱Effective Front-End Strategies to Reduce Waste on Construction Projects網(wǎng)絡(luò)公開度
書目名稱Effective Front-End Strategies to Reduce Waste on Construction Projects網(wǎng)絡(luò)公開度學(xué)科排名
書目名稱Effective Front-End Strategies to Reduce Waste on Construction Projects被引頻次
書目名稱Effective Front-End Strategies to Reduce Waste on Construction Projects被引頻次學(xué)科排名
書目名稱Effective Front-End Strategies to Reduce Waste on Construction Projects年度引用
書目名稱Effective Front-End Strategies to Reduce Waste on Construction Projects年度引用學(xué)科排名
書目名稱Effective Front-End Strategies to Reduce Waste on Construction Projects讀者反饋
書目名稱Effective Front-End Strategies to Reduce Waste on Construction Projects讀者反饋學(xué)科排名
作者: 支架 時間: 2025-3-21 21:10
,“Long-List” of Eight Methodologies,ngineering construction methodologies. Exactly what constituted innovative engineering construction was defined using the Slaughter model. A brief was prepared after a literature review of each of the eight “l(fā)ong-list” options which are: (i) Knowledge Management; (ii) Lean Construction; (iii) Constr作者: 險代理人 時間: 2025-3-22 01:24
,“Short-List” of Four Methodologies,he four-option short-list. A brief is provided after an extensive global literature review of each of the four short-list options which are: (a) Optimal Work Duration on Site; (b) Construction Site Waste Reduction; (c) Rationalization of Australian Construction Safety Regulations; and (d) Sustainabl作者: GEAR 時間: 2025-3-22 06:36 作者: anachronistic 時間: 2025-3-22 09:56
Research Methods,search method to address the research question. Qualitative research using a pragmatic framework approach, using thematic analysis to interpret the data harvested from participant surveys became the adopted method. It was necessary deemed to also study potential sources of waste as a critical adjunc作者: 大炮 時間: 2025-3-22 12:53 作者: 大炮 時間: 2025-3-22 20:39 作者: muffler 時間: 2025-3-22 22:52 作者: ARENA 時間: 2025-3-23 02:05
Conclusions,d ecological benefits which the implementation of the research would bring. It is concluded from the upper-level estimates provided that the nominated front-end site waste strategies are available . and unlike recycling, require no capital cost expenditure to implement. Conclusions are drawn on poss作者: 混合 時間: 2025-3-23 06:44 作者: 沉思的魚 時間: 2025-3-23 11:02
Book 2019he research-based book commences with an evaluation of eight methodologies identified after a worldwide literature and compliance review. It is followed by a more detailed report on four of these options, with the ultimate objective of independent selection within the construction engineering commun作者: MIME 時間: 2025-3-23 14:19
emic literature on the critical need to embrace front-end stThis volume outlines a progressively staged process focused on fostering a more effective, more efficient, and greener global construction industry. The research-based book commences with an evaluation of eight methodologies identified afte作者: 制定法律 時間: 2025-3-23 20:07
G. Sal?er,M. Wen?l,R. H. Jenny,A. Stanglprovided, with a supporting flow chart. Definitions are provided of what exactly constitutes . engineering construction methodologies. The initial research question was formulated and is described as follows: “. triple bottom line .” Key performance indicators adopted to select options for research are outlined.作者: organic-matrix 時間: 2025-3-24 02:08
https://doi.org/10.1007/978-1-0716-3531-5isk assessment is prepared for each of the eight options, to assist in “short-list” determination. The “l(fā)ong-list” scorecard proforma is established, and this scorecard is populated from peer review panel assessments. A “short-list” of four options for further research is created.作者: tangle 時間: 2025-3-24 02:37 作者: 挑剔小責(zé) 時間: 2025-3-24 10:22 作者: Fibrinogen 時間: 2025-3-24 14:30
,“Long-List” of Eight Methodologies,isk assessment is prepared for each of the eight options, to assist in “short-list” determination. The “l(fā)ong-list” scorecard proforma is established, and this scorecard is populated from peer review panel assessments. A “short-list” of four options for further research is created.作者: fibula 時間: 2025-3-24 18:28
Research Methods,te minimization research data collation by the survey. The framework for a pragmatic qualitative research approach was developed, in depth. Criteria such as validity, sampling strategy, data analysis procedure and the like were prepared, and parameters were provided, where necessary.作者: Favorable 時間: 2025-3-24 21:43
Peter G. Rundle,Alireza Bahadori,Ken DoustShines a light on the extremely important topic of the global construction’s use raw materials and generation of waste.Fills a void the academic literature on the critical need to embrace front-end st作者: Confirm 時間: 2025-3-25 00:48
http://image.papertrans.cn/e/image/302762.jpg作者: 柳樹;枯黃 時間: 2025-3-25 05:21 作者: 虛度 時間: 2025-3-25 08:40
Research Contribution,This chapter, “Research Contribution”, re-evaluates research goals, along with the contribution that the research has the potential of making to the engineering construction industry. The impact potential to broader community and government regulations is also summarized.作者: Apogee 時間: 2025-3-25 13:01
G. Sal?er,M. Wen?l,R. H. Jenny,A. Stanglordingly, an increase in the effective and efficient operability of this particular industry is likely to have a flow-on effect to that countries economy. The eight methodologies considered in this text are outlined in the introduction and they are: (i) Knowledge Management; (ii) Lean Construction; 作者: muscle-fibers 時間: 2025-3-25 16:03
https://doi.org/10.1007/978-1-0716-3531-5ngineering construction methodologies. Exactly what constituted innovative engineering construction was defined using the Slaughter model. A brief was prepared after a literature review of each of the eight “l(fā)ong-list” options which are: (i) Knowledge Management; (ii) Lean Construction; (iii) Constr作者: obviate 時間: 2025-3-25 23:14 作者: 不如樂死去 時間: 2025-3-26 02:46
Das Buch des Goethe-Lessing-Jahres 1929steminimization and potential sources of construction waste. Further, through thoughtful knowledge transfer, the ultimate aim of the thesis is to add triple bottom line value to contractor/builder/client stakeholders, the community at large and the environment, through the implementation of these ef作者: 令人不快 時間: 2025-3-26 04:21
Wolken, Grogstuben und der letzte Abend,search method to address the research question. Qualitative research using a pragmatic framework approach, using thematic analysis to interpret the data harvested from participant surveys became the adopted method. It was necessary deemed to also study potential sources of waste as a critical adjunc作者: Headstrong 時間: 2025-3-26 09:36 作者: Psa617 時間: 2025-3-26 14:10
https://doi.org/10.1007/978-3-663-16188-2oad spectrum of position descriptions, from contractor/builders; private/public sector clients; design consultants and specialist practitioners. Assistance was received with survey data compilation from peak bodies including Australian Construction Industry Forum; Master Builders Association and con作者: malapropism 時間: 2025-3-26 18:42 作者: gangrene 時間: 2025-3-26 23:02
,Reformen und Reformvorschl?ge,d ecological benefits which the implementation of the research would bring. It is concluded from the upper-level estimates provided that the nominated front-end site waste strategies are available . and unlike recycling, require no capital cost expenditure to implement. Conclusions are drawn on poss作者: Outspoken 時間: 2025-3-27 05:05
,Die v?lkerrechtliche Stellung der Schweiz,areas of: (i) Front-End Site Waste Minimization Cost–Benefit Analysis; (ii) Front-End Site Waste Minimization Case Study; (iii) Best Practice Manual for Front-End Waste Management; (iv) Site Waste Dynamic Model; (v) Site Waste Optimization Model and (vi) Broad Definition of Project Waste—Minimizatio作者: 馬賽克 時間: 2025-3-27 07:01 作者: 尋找 時間: 2025-3-27 12:22 作者: Alcove 時間: 2025-3-27 15:06 作者: 容易生皺紋 時間: 2025-3-27 21:05
Effective Front-End Strategies to Reduce Waste on Construction Projects作者: regale 時間: 2025-3-28 00:38 作者: confederacy 時間: 2025-3-28 05:31 作者: 名字 時間: 2025-3-28 07:51 作者: Confidential 時間: 2025-3-28 12:02
https://doi.org/10.1007/978-3-322-89438-0 from a superintendent and foreperson perspective. Forty-six males and seven females completed the survey. A range of “other” construction engineering specialists also completed the survey (project managers, site managers, construction managers, risk managers, sustainability managers, estimators, sc作者: Apoptosis 時間: 2025-3-28 17:44 作者: MURAL 時間: 2025-3-28 20:51
Arteriitis obliterans (Friedl?nder)ory statutory code of practice for construction waste management. Participation rates in project and/or company waste management plans are surprisingly low. The industry appears content to rely on the in-house expertise of its personnel (viz project manager) to drive effective and efficient waste ma作者: obtuse 時間: 2025-3-28 22:54 作者: OCTO 時間: 2025-3-29 04:04
,Die v?lkerrechtliche Stellung der Schweiz,o, further investigation needs to be undertaken on the impact inclement weather has a potential source of construction waste. This is one area that the current research is at odds, with other local and global literature. This research indicated that survey respondents placed a low potential, for inc作者: 向前變橢圓 時間: 2025-3-29 07:58 作者: Obstruction 時間: 2025-3-29 13:23 作者: 浪蕩子 時間: 2025-3-29 16:06 作者: 機(jī)構(gòu) 時間: 2025-3-29 23:45 作者: 符合國情 時間: 2025-3-30 02:11