派博傳思國際中心

標(biāo)題: Titlebook: Countdown to a Moon Launch; Preparing Apollo for Jonathan H. Ward Book 2015 Springer International Publishing Switzerland 2015 Apollo Backg [打印本頁]

作者: 債權(quán)人    時間: 2025-3-21 18:54
書目名稱Countdown to a Moon Launch影響因子(影響力)




書目名稱Countdown to a Moon Launch影響因子(影響力)學(xué)科排名




書目名稱Countdown to a Moon Launch網(wǎng)絡(luò)公開度




書目名稱Countdown to a Moon Launch網(wǎng)絡(luò)公開度學(xué)科排名




書目名稱Countdown to a Moon Launch被引頻次




書目名稱Countdown to a Moon Launch被引頻次學(xué)科排名




書目名稱Countdown to a Moon Launch年度引用




書目名稱Countdown to a Moon Launch年度引用學(xué)科排名




書目名稱Countdown to a Moon Launch讀者反饋




書目名稱Countdown to a Moon Launch讀者反饋學(xué)科排名





作者: restrain    時間: 2025-3-21 23:11
The MSOB and the CSM Processing Flow,her, and the completed spacecraft will be rolled over to the Vehicle Assembly Building to join the Saturn V. Continued spacecraft processing in the VAB and at the launch pad will be addressed in subsequent chapters.
作者: 辯論    時間: 2025-3-22 02:01

作者: 古文字學(xué)    時間: 2025-3-22 05:17
uestion of how NASA could build and launch Apollo missions using 1960s technology. You’ll discover that there was no magic involved – just an abundance of discipline, willpower, and creativity..978-3-319-17791-5978-3-319-17792-2
作者: Robust    時間: 2025-3-22 11:22

作者: GLARE    時間: 2025-3-22 13:14

作者: GLARE    時間: 2025-3-22 18:01

作者: 意外的成功    時間: 2025-3-23 00:08
The MSOB and the CSM Processing Flow,In this chapter, we will begin with a brief orientation to the Manned Spacecraft Operations Building at KSC and the Apollo spacecraft. The 3-month flow of the . CSM and LM through the Manned Spacecraft Operations Building were relatively typical of the Apollo spacecraft workflow and will illustrate
作者: Seminar    時間: 2025-3-23 02:36
Countdown Demonstration Test,l see what was supposed to happen during a CDDT—and fortunately, .’. was one that went by the book. Then we will learn about what actually happened during the CDDTs for several missions where things did not go nearly so well. At the end of the chapter, we will clean up the final few open items from
作者: commensurate    時間: 2025-3-23 07:47

作者: 沖突    時間: 2025-3-23 11:35

作者: GEON    時間: 2025-3-23 15:35

作者: 窩轉(zhuǎn)脊椎動物    時間: 2025-3-23 18:43
Requirements, Tests, and Computerization,process was part of daily life for everyone who touched even just one piece of the space vehicle or the systems that fueled it and supported it. It is simply impossible to talk about launch operations at Kennedy Space Center without discussing the process that governed nearly every action that people took on the job.
作者: flimsy    時間: 2025-3-24 01:08
Countdown Demonstration Test,ring the CDDTs for several missions where things did not go nearly so well. At the end of the chapter, we will clean up the final few open items from testing and be ready to proceed with the launch countdown for ..
作者: DIKE    時間: 2025-3-24 04:32

作者: Expressly    時間: 2025-3-24 10:26
Gestaltung der Wissensbasis von Unternehmen,on the program. Everybody around here at that time was involved in some way with the space program. Even if you ran a gas station, that was because there were other people here working on the space program. I’ve never seen anything like that, where so many people were so focused on one thing.”
作者: dry-eye    時間: 2025-3-24 11:57

作者: nutrients    時間: 2025-3-24 18:50

作者: 使無效    時間: 2025-3-24 21:50

作者: interrogate    時間: 2025-3-24 23:09
ring the CDDTs for several missions where things did not go nearly so well. At the end of the chapter, we will clean up the final few open items from testing and be ready to proceed with the launch countdown for ..
作者: Osteons    時間: 2025-3-25 05:20

作者: DEVIL    時間: 2025-3-25 11:04

作者: ALE    時間: 2025-3-25 13:07

作者: 豎琴    時間: 2025-3-25 18:12
Einführung in die ProblemstellungIn this chapter, we will begin with a brief orientation to the Manned Spacecraft Operations Building at KSC and the Apollo spacecraft. The 3-month flow of the . CSM and LM through the Manned Spacecraft Operations Building were relatively typical of the Apollo spacecraft workflow and will illustrate
作者: textile    時間: 2025-3-25 22:17
l see what was supposed to happen during a CDDT—and fortunately, .’. was one that went by the book. Then we will learn about what actually happened during the CDDTs for several missions where things did not go nearly so well. At the end of the chapter, we will clean up the final few open items from
作者: 高度    時間: 2025-3-26 00:16
Gestaltung der Wissensbasis von Unternehmen,ed down on the Moon’s surface on July 20, 1969. The excitement was of course contagious all along the Space Coast. Robert Merrilees said: “When Armstrong stepped onto the Moon late that night, there wasn’t a person in this area that was in bed. Eight or ten people in my neighborhood worked directly
作者: adulterant    時間: 2025-3-26 04:21
Einführung in die ProblemstellungWhile the CSM was being assembled and tested in the MSOB high bay, the mission’s LM was also being processed. This chapter describes the LM processing flow. We will also touch on how the lunar rover was checked and integrated with the LM. Finally, we will see the LM and CSM come together into a completed spacecraft assembly.
作者: 消極詞匯    時間: 2025-3-26 10:53
Hans Gruene, one of Wernher von Braun’s Peenemünde rocket scientists, led the launch vehicle operations directorate at Kennedy Space Center. As with its sister directorate, spacecraft operations, launch vehicle operations reported to Rocco Petrone, the director of launch operations.
作者: 減至最低    時間: 2025-3-26 14:20
Einführung in die ProblemstellungThis chapter tells the story of the intense 2 months of testing at the launch pad to prepare .’. space vehicle for its mission. This phase of processing covered the period from rollout from the VAB to the launch pad, the flight readiness test, and preparations for the countdown demonstration test.
作者: 流逝    時間: 2025-3-26 20:15
As the third week of July 1969 opened, it was time for Kennedy Space Center’s moment in the sun. All major testing was complete. . was finally ready to begin its countdown to launch.
作者: 物種起源    時間: 2025-3-26 23:13
Jack King remembers vividly the seconds following liftoff of .: “I’m in the back row in the firing room. I’d said ‘Lift-off,’ and I looked over my shoulder, and that goddamn thing looks like it’s still just sitting there on fire, in a bed of flames!”
作者: DUST    時間: 2025-3-27 02:35

作者: expansive    時間: 2025-3-27 08:47
The Launch Vehicle Processing Flow in the VAB,Hans Gruene, one of Wernher von Braun’s Peenemünde rocket scientists, led the launch vehicle operations directorate at Kennedy Space Center. As with its sister directorate, spacecraft operations, launch vehicle operations reported to Rocco Petrone, the director of launch operations.
作者: covert    時間: 2025-3-27 10:37

作者: 漂亮    時間: 2025-3-27 14:38

作者: Constitution    時間: 2025-3-27 19:05

作者: 枕墊    時間: 2025-3-28 01:20

作者: 沒有希望    時間: 2025-3-28 03:56
Controlling Complexity,end of 1967. Planners soon began to appreciate the magnitude of the hurdles to be overcome. Timelines were pushed farther back, and the pace picked up. Contractors and schedules had to be managed and controlled, or the program would devolve into chaos.
作者: 聯(lián)想    時間: 2025-3-28 09:48

作者: Extemporize    時間: 2025-3-28 14:24

作者: integral    時間: 2025-3-28 16:47

作者: Encapsulate    時間: 2025-3-28 19:49

作者: OREX    時間: 2025-3-28 23:27
Die Besonderheit des St?dtischen. Entwicklungslinien der Stadt(soziologie) – Einleitungst?ndliche, wenn nicht sogar zunehmende Bedeutung des St?dtischen im Lebensalltag. Gleichzeitig – und diese Feststellung scheinbar konterkarierend – wird im Wissenschaftsdiskurs heute aber auch die Frage immer lauter, ob sich die Stadt bzw. das St?dtische überhaupt noch bestimmen lassen. Vor dem Hin




歡迎光臨 派博傳思國際中心 (http://www.pjsxioz.cn/) Powered by Discuz! X3.5
安塞县| 荔波县| 乌海市| 肥东县| 盐池县| 尼玛县| 平远县| 平阴县| 嫩江县| 南昌县| 陵川县| 银川市| 江门市| 北安市| 仁怀市| 昆山市| 乌恰县| 阳春市| 旌德县| 太原市| 保靖县| 杭锦后旗| 寿宁县| 香格里拉县| 西宁市| 桐城市| 石泉县| 松江区| 江油市| 松阳县| 信阳市| 育儿| 黄浦区| 静海县| 望江县| 宁都县| 夹江县| 凤翔县| 呼伦贝尔市| 遂川县| 华池县|