派博傳思國際中心

標題: Titlebook: Controlling Automated Manufacturing Systems; P. J. O’Grady Book 1986 P J O’Grady 1986 Trend.computer-aided design (CAD).control.design.mac [打印本頁]

作者: Falter    時間: 2025-3-21 17:19
書目名稱Controlling Automated Manufacturing Systems影響因子(影響力)




書目名稱Controlling Automated Manufacturing Systems影響因子(影響力)學(xué)科排名




書目名稱Controlling Automated Manufacturing Systems網(wǎng)絡(luò)公開度




書目名稱Controlling Automated Manufacturing Systems網(wǎng)絡(luò)公開度學(xué)科排名




書目名稱Controlling Automated Manufacturing Systems被引頻次




書目名稱Controlling Automated Manufacturing Systems被引頻次學(xué)科排名




書目名稱Controlling Automated Manufacturing Systems年度引用




書目名稱Controlling Automated Manufacturing Systems年度引用學(xué)科排名




書目名稱Controlling Automated Manufacturing Systems讀者反饋




書目名稱Controlling Automated Manufacturing Systems讀者反饋學(xué)科排名





作者: 耐寒    時間: 2025-3-21 22:58
uctures and overall systems; equally, for the hardware and detailed control aspects of the equipment used (for example, NC machines, robots, etc), comprehensive studies have also been completed. To cover each area fully would result in a work of several volumes. Instead, this book stresses the important eleme978-94-011-7470-1978-94-011-7468-8
作者: 政府    時間: 2025-3-22 01:08

作者: 生存環(huán)境    時間: 2025-3-22 04:54
Production Planning and Control Structure for Automated Manufacturing Systems,e higher levels, decreasing as the hierarchy is descended; where time periods measured in years may be used at the highest levels, the time periods may only be minutes at the lower levels. Overall, therefore, the characteristic complexity of the production planning and control task for manufacturing
作者: fatty-acids    時間: 2025-3-22 10:08
Automated Manufacturing Systems and Production Planning and Control,gain, any automated manufacturing system will underachieve unless there is high quality production planning and control. The results of poor production planning and control can be severe, with high work-in-progress levels, high lead times and poor system usage. The latter aspect is important when on
作者: 消極詞匯    時間: 2025-3-22 13:35
Traditional Production Planning and Control,different routes, with each job being processed on one or more machines. For most batch manufacturing concerns, perhaps the major characteristic that affects the production planning and control function is the complexity of the manufacturing system. A typical batch manufacturer may have thousands of
作者: 消極詞匯    時間: 2025-3-22 19:40

作者: crucial    時間: 2025-3-23 00:28
Factory Level Control,ure and deals with the relatively long-term strategy of the automated manufacturing system. It is, for example, at this level that decisions are made about the production rate and the due dates for jobs. Because decision making at this level involves taking a wide variety of factors into account, a
作者: abduction    時間: 2025-3-23 05:17

作者: 的闡明    時間: 2025-3-23 06:22

作者: gregarious    時間: 2025-3-23 10:28

作者: 藥物    時間: 2025-3-23 16:15
Traditional Production Planning and Control, different batches each month passing through a hundred machines. The interrelationships between jobs flowing through the manufacturing systems leads to a tremendously intricate combinatorial problem. The traditional approach that has met with some success has been to break down the problem into a hierarchy of levels.
作者: 孤僻    時間: 2025-3-23 22:04
Factory Level Control,human element in this process is desirable at least for the immediate future. At some future point, developments in areas such as artificial intelligence may mean that this human element can be reduced.
作者: 楓樹    時間: 2025-3-24 00:43
evel Control 75 Introduction 75 CCS classification 77 What is a cell? 78 CCS operational modes 80 Conclusion 86 Chapter 8: Equipment Level Control 89 Introduction 89 What is meant by equipment? 90 Equipment level control structure 92 Conclusion 94 Chapter 9: Conclusion and Future Trends 95 Overall p
作者: 心胸開闊    時間: 2025-3-24 06:26
https://doi.org/10.1007/978-3-663-05057-5n planning and control can be severe, with high work-in-progress levels, high lead times and poor system usage. The latter aspect is important when one bears in mind the high cost of these automated manufacturing systems; the only way in which they can be justified is if they demonstrate the good rate of return associated with high usage.
作者: 爭吵    時間: 2025-3-24 09:52

作者: 哥哥噴涌而出    時間: 2025-3-24 14:39

作者: 空洞    時間: 2025-3-24 16:46

作者: 蝕刻術(shù)    時間: 2025-3-24 21:44

作者: 罵人有污點    時間: 2025-3-25 02:45

作者: 意見一致    時間: 2025-3-25 05:22
Equipment Level Control,. The timespan encompassed at the higher levels has also gradually decreased, so that the time bucket of perhaps a week at the MPS I level, has been reduced to a matter of minutes or seconds at the cell and equipment levels.
作者: sparse    時間: 2025-3-25 09:16
Der Umformvorgang beim Feilenhauen different batches each month passing through a hundred machines. The interrelationships between jobs flowing through the manufacturing systems leads to a tremendously intricate combinatorial problem. The traditional approach that has met with some success has been to break down the problem into a hierarchy of levels.
作者: Munificent    時間: 2025-3-25 15:32

作者: EVEN    時間: 2025-3-25 16:33
https://doi.org/10.1007/978-3-663-05060-5owing through a number of different processing machines. The determination of effective planning and control can be a very time consuming and difficult process. When dealing with an automated manufacturing system, there are a number of factors which make production planning and control problems even more complex.
作者: Dedication    時間: 2025-3-25 21:39

作者: 衰弱的心    時間: 2025-3-26 04:07

作者: Facilities    時間: 2025-3-26 08:03
https://doi.org/10.1007/978-3-663-05057-5Rapid improvements in both computer hardware and software have made possible a dramatic shift towards automated manufacture. Complete mini factories can now operate with limited human involvement; such automated manufacturing systems rely on effective control procedures for their operation.
作者: acheon    時間: 2025-3-26 11:34

作者: ALLAY    時間: 2025-3-26 16:09
Introduction,Rapid improvements in both computer hardware and software have made possible a dramatic shift towards automated manufacture. Complete mini factories can now operate with limited human involvement; such automated manufacturing systems rely on effective control procedures for their operation.
作者: 哺乳動物    時間: 2025-3-26 16:46
Cell Level Control,The previous chapters have given a description of the planning and control hierarchy (Chapter 4), a background to the factory level (Chapter 5) and the shop level (Chapter 6). This chapter describes cell level control, which is beneath the shop level in the hierarchy of planning and control.
作者: ARBOR    時間: 2025-3-26 21:30

作者: 美色花錢    時間: 2025-3-27 03:06
https://doi.org/10.1007/978-3-663-05057-5gain, any automated manufacturing system will underachieve unless there is high quality production planning and control. The results of poor production planning and control can be severe, with high work-in-progress levels, high lead times and poor system usage. The latter aspect is important when on
作者: 厭煩    時間: 2025-3-27 06:12
Der Umformvorgang beim Feilenhauendifferent routes, with each job being processed on one or more machines. For most batch manufacturing concerns, perhaps the major characteristic that affects the production planning and control function is the complexity of the manufacturing system. A typical batch manufacturer may have thousands of
作者: incision    時間: 2025-3-27 11:44
Der Umformvorgang beim Feilenhauenction planning and control for batch manufacturing is tremendously complex; a wide variety of interrelationships exists within a typical manufacturing system. This problem can be approached by using a hierarchy of control where major aggregate decisions are made at the highest levels and these decis
作者: 無彈性    時間: 2025-3-27 16:11

作者: CHASM    時間: 2025-3-27 18:43
https://doi.org/10.1007/978-3-663-05058-2ntrol (as discussed in Chapter 4), and is mainly concerned with taking the requirements given by the factory level, and translating these into commands or goals for each cell. In doing so, it should take account of the constraints that apply both in terms of machine capacities and in terms of, for e
作者: 抗生素    時間: 2025-3-28 00:35
Die Verwendung von 2 oder 3 Streckpassagen,els and as we descend the hierarchy broad objectives specified in the master production schedule I (MPS I) have become more and more detailed commands. The timespan encompassed at the higher levels has also gradually decreased, so that the time bucket of perhaps a week at the MPS I level, has been r
作者: 共同給與    時間: 2025-3-28 04:29

作者: WAG    時間: 2025-3-28 06:37
Software Testing in Systems of Large Scaleongoing value shifts among the American public on wildlife from a dominion worldview toward mutualism and animal rights. The chapter closes with the call for recognizing wild animals as victims of oppression and the need for their ethical and legal protection and inclusion in social justice movement
作者: Libido    時間: 2025-3-28 10:32

作者: 松軟    時間: 2025-3-28 18:24





歡迎光臨 派博傳思國際中心 (http://www.pjsxioz.cn/) Powered by Discuz! X3.5
伊春市| 元阳县| 洛南县| 诸城市| 永登县| 兴化市| 宕昌县| 前郭尔| 安塞县| 祁连县| 丹阳市| 申扎县| 延津县| 汪清县| 金堂县| 车致| 西昌市| 大悟县| 陵水| 苏州市| 浏阳市| 离岛区| 乐平市| 象州县| 奎屯市| 于都县| 十堰市| 华蓥市| 故城县| 旬邑县| 西藏| 罗源县| 温州市| 芜湖县| 阳谷县| 望都县| 朔州市| 泸西县| 鄱阳县| 横峰县| 余庆县|