派博傳思國際中心

標題: Titlebook: Constructability in Building and Engineering Projects; Alan Griffith,Tony Sidwell Textbook 1995Latest edition Alan Griffith and Tony Sidwe [打印本頁]

作者: SPIR    時間: 2025-3-21 19:16
書目名稱Constructability in Building and Engineering Projects影響因子(影響力)




書目名稱Constructability in Building and Engineering Projects影響因子(影響力)學科排名




書目名稱Constructability in Building and Engineering Projects網(wǎng)絡(luò)公開度




書目名稱Constructability in Building and Engineering Projects網(wǎng)絡(luò)公開度學科排名




書目名稱Constructability in Building and Engineering Projects被引頻次




書目名稱Constructability in Building and Engineering Projects被引頻次學科排名




書目名稱Constructability in Building and Engineering Projects年度引用




書目名稱Constructability in Building and Engineering Projects年度引用學科排名




書目名稱Constructability in Building and Engineering Projects讀者反饋




書目名稱Constructability in Building and Engineering Projects讀者反饋學科排名





作者: 違法事實    時間: 2025-3-22 00:17

作者: 委屈    時間: 2025-3-22 04:13

作者: 揭穿真相    時間: 2025-3-22 08:21

作者: 向外才掩飾    時間: 2025-3-22 10:47
https://doi.org/10.1007/978-3-319-49301-5led analysis not only of the individual phases of the total construction process but also of the interaction between those phases. In any building or engineering project, seeking improvement through the careful consideration of procurement, design, construction techniques and management approach sho
作者: 技術(shù)    時間: 2025-3-22 13:42

作者: 技術(shù)    時間: 2025-3-22 18:35
https://doi.org/10.1007/978-3-319-49526-2ough practical case studies. Emphasis is placed upon the consideration of design elements and the empathy between design and construction, with a view to producing building and engineering details that not only have greater simplicity in themselves but in so doing are made more easy to construct on
作者: 脫水    時間: 2025-3-22 23:13
https://doi.org/10.1007/978-3-319-49526-2ghbouring locations, the construction industry is faced with a completely different logistical problem, because, as we know, each construction project and each production site is set up in a new place each time to construct a one-off product. Virtually every building or engineering project is in its
作者: 減震    時間: 2025-3-23 02:03
https://doi.org/10.1007/978-3-319-49526-2tion is clear and pronounced, in procurement, design and the construction phase. One does not necessarily think of the maintenance phase of the total construction process if one is considering constructability. This should not imply, however, that constructability has little or no part to play in th
作者: 才能    時間: 2025-3-23 08:48
https://doi.org/10.1007/978-3-319-49526-2ase study examples. This chapter presents a number of more detailed case studies to exemplify the contribution that constructability can make throughout the building and engineering processes. The case studies present examples in building, engineering and refurbishment work, and address some of the
作者: FLAT    時間: 2025-3-23 10:18
https://doi.org/10.1007/978-3-319-49526-2g part of constructability emerged in the late 1970s as a result of research into cost efficiency and quality in the construction industry. The separation of the design and construction processes, which was partly due to traditional contractual procedures, was cited as the major factor hindering con
作者: configuration    時間: 2025-3-23 15:45

作者: Odyssey    時間: 2025-3-23 18:27

作者: BADGE    時間: 2025-3-23 23:30
Strategies for Constructability,modern construction projects. This was emphasised in a review of the background and evolutionary development of constructability concepts, which focused both on practice and on various research reports, some well known and some less so, that have been conducted over many years. These studies highlig
作者: headlong    時間: 2025-3-24 03:11
Constructability in Design,ough practical case studies. Emphasis is placed upon the consideration of design elements and the empathy between design and construction, with a view to producing building and engineering details that not only have greater simplicity in themselves but in so doing are made more easy to construct on
作者: 任命    時間: 2025-3-24 09:56

作者: 丑惡    時間: 2025-3-24 13:28
Constructability in Use,tion is clear and pronounced, in procurement, design and the construction phase. One does not necessarily think of the maintenance phase of the total construction process if one is considering constructability. This should not imply, however, that constructability has little or no part to play in th
作者: 胰島素    時間: 2025-3-24 18:45
Constructability Case Studies,ase study examples. This chapter presents a number of more detailed case studies to exemplify the contribution that constructability can make throughout the building and engineering processes. The case studies present examples in building, engineering and refurbishment work, and address some of the
作者: Cubicle    時間: 2025-3-24 21:14
Constructability: An Overview,g part of constructability emerged in the late 1970s as a result of research into cost efficiency and quality in the construction industry. The separation of the design and construction processes, which was partly due to traditional contractual procedures, was cited as the major factor hindering con
作者: 無效    時間: 2025-3-25 01:29

作者: 使增至最大    時間: 2025-3-25 06:21

作者: 譏諷    時間: 2025-3-25 10:48

作者: 改正    時間: 2025-3-25 12:51

作者: 合乎習俗    時間: 2025-3-25 17:52
Constructability in Building and Engineering Projects
作者: genesis    時間: 2025-3-25 20:19
Constructability in Building and Engineering Projects
作者: Geyser    時間: 2025-3-26 00:34
uctability, before moving on to focus on the implications in the design and construction phases. A key chapter is devoted to a sequence of case studies of real projects that illustrate the implementation of constructability; these cover building, engineering, services and refurbishment.
作者: 樸素    時間: 2025-3-26 07:36
https://doi.org/10.1007/978-3-319-49301-5f the finished product. However, it must be emphasised that constructability is not a concept that should be invoked as an imposition; rather, it must become an implicit and accepted characteristic of the construction process, to which all the various construction professionals contribute. Furthermo
作者: hypotension    時間: 2025-3-26 11:09

作者: indubitable    時間: 2025-3-26 13:49

作者: institute    時間: 2025-3-26 18:10

作者: 喚醒    時間: 2025-3-26 22:02
Constructability: An Overview,tion of the design and construction processes, which was partly due to traditional contractual procedures, was cited as the major factor hindering constructability, resulting in budgets being exceeded and deadlines being overrun.
作者: 邪惡的你    時間: 2025-3-27 04:17
https://doi.org/10.1007/978-3-319-49526-2issues that may arise in the phases of procurement, design, engineering, construction and use. The examples reviewed cannot, of course, be held as typical of current constructability applications, but rather serve as a strong indication of the propensities of constructability in application to building and engineering processes.
作者: RAFF    時間: 2025-3-27 06:06
Society and the Market Process,ich are considered in subsequent chapters. This chapter next considers the necessity for all contributors to the construction process to participate actively in the search for better constructability, that is, constructability is considered as a strategy for action throughout the total construction process.
作者: Embolic-Stroke    時間: 2025-3-27 12:24
Strategies for Constructability,ich are considered in subsequent chapters. This chapter next considers the necessity for all contributors to the construction process to participate actively in the search for better constructability, that is, constructability is considered as a strategy for action throughout the total construction process.
作者: Flavouring    時間: 2025-3-27 15:20
Textbook 1995Latest edition, before moving on to focus on the implications in the design and construction phases. A key chapter is devoted to a sequence of case studies of real projects that illustrate the implementation of constructability; these cover building, engineering, services and refurbishment.
作者: 陰險    時間: 2025-3-27 18:50

作者: 火光在搖曳    時間: 2025-3-28 00:23
and field operations to achieve overall project objectives‘. Those who advocate it as a concept and approach claim that it can bring real benefits to all involved clients, consultants, contractors and users. This book provides for the advanced student or practitioner a review of the concepts, princ
作者: 死貓他燒焦    時間: 2025-3-28 05:11
https://doi.org/10.1007/978-3-319-49526-2tion of the design and construction processes, which was partly due to traditional contractual procedures, was cited as the major factor hindering constructability, resulting in budgets being exceeded and deadlines being overrun.
作者: 千篇一律    時間: 2025-3-28 10:05

作者: 擦掉    時間: 2025-3-28 11:38
Ergebnisse der empirischen Untersuchung,samt zeigt sich, dass die Berücksichtigung von weichen Standortfaktoren bei der Standortentwicklung eine wichtige Rolle spielt und dass es eine Herausforderung darstellt, eine nachhaltige Entwicklung zu erreichen, die die Lebensqualit?t der Anrainer nicht negativ beeinflusst.
作者: 注視    時間: 2025-3-28 18:37

作者: AMOR    時間: 2025-3-28 18:59





歡迎光臨 派博傳思國際中心 (http://www.pjsxioz.cn/) Powered by Discuz! X3.5
宜兰县| 城口县| 拜城县| 镇雄县| 孟津县| 涟水县| 登封市| 綦江县| 娱乐| 丰台区| 柞水县| 平乡县| 同心县| 前郭尔| 博湖县| 宣威市| 德庆县| 四子王旗| 东阳市| 循化| 旅游| 邢台县| 利津县| 陵川县| 大方县| 新建县| 云林县| 安福县| 昭觉县| 舒城县| 斗六市| 舒兰市| 安仁县| 永德县| 定州市| 历史| 吴忠市| 凤冈县| 历史| 东丽区| 长宁区|