標(biāo)題: Titlebook: Civil Engineering: Supervision and Management; A. C. Twort,J. Gordon Rees Book 1995 AC Twort and J Gordon Rees 1995 civil engineering.conc [打印本頁] 作者: 忠誠 時間: 2025-3-21 17:18
書目名稱Civil Engineering: Supervision and Management影響因子(影響力)
書目名稱Civil Engineering: Supervision and Management影響因子(影響力)學(xué)科排名
書目名稱Civil Engineering: Supervision and Management網(wǎng)絡(luò)公開度
書目名稱Civil Engineering: Supervision and Management網(wǎng)絡(luò)公開度學(xué)科排名
書目名稱Civil Engineering: Supervision and Management被引頻次
書目名稱Civil Engineering: Supervision and Management被引頻次學(xué)科排名
書目名稱Civil Engineering: Supervision and Management年度引用
書目名稱Civil Engineering: Supervision and Management年度引用學(xué)科排名
書目名稱Civil Engineering: Supervision and Management讀者反饋
書目名稱Civil Engineering: Supervision and Management讀者反饋學(xué)科排名
作者: 上下倒置 時間: 2025-3-21 21:20
Contractual arrangements, by particular industries or specialist suppliers, but conditions for more general use have been developed by the major engineering and building institutions, as well as by government and allied organizations. Use of these standard conditions is beneficial because they are familiar to contractors, g作者: Jacket 時間: 2025-3-22 01:02 作者: 案發(fā)地點(diǎn) 時間: 2025-3-22 07:38
The engineer and his staff,to all the circumstances’ (Clause 2(8)). The parties to the contract can thus look to the engineer to carry out the administrative duties required under the contract fairly, and to make the decisions that are necessary to allow the works to proceed to completion. The parties reserve to themselves, h作者: chastise 時間: 2025-3-22 09:23
Starting the construction work,s in tenders in order to select the best offer. Once an award of contract has been made, a further meeting is necessary to make preparations for starting the contract. Such a pre-commencement meeting will be attended by the employer or his key staff concerned, the engineer and his proposed resident 作者: Reverie 時間: 2025-3-22 14:11
Site surveys, investigations and layout,onvenient method for surveying and levelling small or moderately sized sites is to use spot levelling on a 20 m grid, picking up any abrupt changes of level or gradient between these intervals. An instrument man and two chainmen are needed to carry out the work. Ranging poles, two fibreglass tapes, 作者: Reverie 時間: 2025-3-22 17:30
,The resident engineer’s office records, engineer depend to a considerable extent upon the efficiency of the record systems that he sets up. These records keep watch over the progress of the work, form the basis for fixing payments to contractors, and testify to the proper execution of the works. They make it possible for designers to be 作者: 法律的瑕疵 時間: 2025-3-22 22:10 作者: convulsion 時間: 2025-3-23 03:40 作者: 愛哭 時間: 2025-3-23 07:39 作者: 違反 時間: 2025-3-23 09:55
Earthworks and pipelines,ting fill. The larger sizes are powerful but are costly to run and maintain, so it is not economic for the contractor to keep one on site for the occasional job. Its principal full-time use is for cutting, or for spreading fill for earthworks in the specified layer thickness and compacting and bondi作者: happiness 時間: 2025-3-23 16:53 作者: 冷峻 時間: 2025-3-23 20:20 作者: GROUP 時間: 2025-3-24 00:48 作者: MOCK 時間: 2025-3-24 05:48 作者: BUDGE 時間: 2025-3-24 06:51 作者: drusen 時間: 2025-3-24 10:58
https://doi.org/10.1057/9780230598645to all the circumstances’ (Clause 2(8)). The parties to the contract can thus look to the engineer to carry out the administrative duties required under the contract fairly, and to make the decisions that are necessary to allow the works to proceed to completion. The parties reserve to themselves, h作者: Entrancing 時間: 2025-3-24 15:37 作者: Decrepit 時間: 2025-3-24 21:18
Methodology of Buddhist Biomedical Ethicsonvenient method for surveying and levelling small or moderately sized sites is to use spot levelling on a 20 m grid, picking up any abrupt changes of level or gradient between these intervals. An instrument man and two chainmen are needed to carry out the work. Ranging poles, two fibreglass tapes, 作者: 空中 時間: 2025-3-25 03:03 作者: 不感興趣 時間: 2025-3-25 05:13
Religious Methods and Resources in Bioethics the contract documents. The ICE Conditions require the contractor to submit his proposed programme within 21 days of being awarded the contract (Clause 14(1)). As mentioned in Section 5.7 the engineer must accept or reject it, or call for more information on it within 21 days; if not, he is deemed 作者: geometrician 時間: 2025-3-25 10:45
Religious Methods and Resources in Bioethicshe contractor at monthly intervals. The amount of work done is measured by the engineer under the contract, and valued in accordance with the terms of the contract. The engineer then issues a . showing the amount that the employer must pay to the contractor. Occasionally other intervals for payment 作者: CHURL 時間: 2025-3-25 14:10 作者: FOR 時間: 2025-3-25 19:02
https://doi.org/10.1007/978-3-030-19843-5ting fill. The larger sizes are powerful but are costly to run and maintain, so it is not economic for the contractor to keep one on site for the occasional job. Its principal full-time use is for cutting, or for spreading fill for earthworks in the specified layer thickness and compacting and bondi作者: Euthyroid 時間: 2025-3-25 21:12
Minorities in West Asia and North Africasite. On remote sites and sites overseas there may be no ready-mix suppliers. If large pours are required it may be more economic for a contractor to produce concrete on site. In other cases a contractor may fear that a ready-mix supplier would not be able to cope with variations in his site require作者: scoliosis 時間: 2025-3-26 04:12
Monastic Obedience and the Religious HousesA promoter usually seeks bids or tenders from construction contractors on the basis of . documents produced as described in the previous chapter. Tenders can be obtained in one of three ways: by open tendering, by selective tendering, or by negotiation.作者: 歸功于 時間: 2025-3-26 05:32
Religious Methods and Resources in BioethicsA construction contract is concerned with the provision of goods and construction of structures by a contractor and payment for these by the employer. The question of payment inevitably involves an assessment of how much is due and when it is to be paid. Discussion of the various payment arrangements that can be made was given in Section 1.7.作者: 轉(zhuǎn)換 時間: 2025-3-26 09:23
Tendering,A promoter usually seeks bids or tenders from construction contractors on the basis of . documents produced as described in the previous chapter. Tenders can be obtained in one of three ways: by open tendering, by selective tendering, or by negotiation.作者: GLEAN 時間: 2025-3-26 15:57 作者: BAN 時間: 2025-3-26 16:58
https://doi.org/10.1007/978-1-4613-1153-9civil engineering; concrete; hospital作者: UNT 時間: 2025-3-26 21:21
978-1-4612-8451-2AC Twort and J Gordon Rees 1995作者: 粗鄙的人 時間: 2025-3-27 02:38
https://doi.org/10.1057/9780230598645lly inadvisable because it may introduce uncertainties of interpretation. Some of the main standard conditions used for civil engineering projects are listed below, with an indication of their main provisions.作者: 不規(guī)則的跳動 時間: 2025-3-27 06:20 作者: eulogize 時間: 2025-3-27 11:34 作者: 中止 時間: 2025-3-27 15:05 作者: 粘 時間: 2025-3-27 18:12 作者: AVOW 時間: 2025-3-28 00:26
Site concreting and reinforcement,ractor’s; but if he proposes to use ready-mix, the resident engineer should check that the supplier can meet the specified requirements for concrete. Some ready-mix suppliers, for instance, may not supply a 40 mm (1.5 in) size coarse aggregate.作者: Terrace 時間: 2025-3-28 03:31
https://doi.org/10.1057/9780230598645re must be a continuous resolve to pursue their construction to finality; and resources must be provided in the form of money, manpower, machines and materials to support this resolve throughout the periods of design and construction.作者: 歌劇等 時間: 2025-3-28 08:08 作者: 扔掉掐死你 時間: 2025-3-28 12:14 作者: 出汗 時間: 2025-3-28 18:18 作者: elucidate 時間: 2025-3-28 19:14 作者: 儲備 時間: 2025-3-29 03:00 作者: erythema 時間: 2025-3-29 07:07
Site surveys, investigations and layout,and a number of pegs are required to set out the sight-lines at 20 m intervals at right angles from some appropriate baseline. Plotting work is easy, and contours may be reliably interpolated between the 20 m interval readings.作者: 監(jiān)禁 時間: 2025-3-29 11:07
,The resident engineer’s office records,assured that the design assumptions are valid, assist the resolution of new design problems arising during construction, and can throw light on the subsequent performance of the works. Without adequate records the resident engineer fails in his obligations to the engineer and the employer.作者: 鴿子 時間: 2025-3-29 12:05 作者: Glutinous 時間: 2025-3-29 18:25
Variations and claims,elay or the cost of meeting unforeseen conditions in accordance with Clause 12(6). Also, only the engineer has authority to issue the final certificate for payment, which of course can include revision of any payments previously certified in the interim payment certificates.作者: candle 時間: 2025-3-29 22:42 作者: 鈍劍 時間: 2025-3-30 02:30
https://doi.org/10.1057/9780230598645er the contract fairly, and to make the decisions that are necessary to allow the works to proceed to completion. The parties reserve to themselves, however, the right to challenge any opinions or decisions of the engineer should they so wish by taking the disputed matter to a conciliation procedure or arbitration for settlement.作者: CUR 時間: 2025-3-30 07:46
Questioning the Power of the Sovereigning the contract. Such a pre-commencement meeting will be attended by the employer or his key staff concerned, the engineer and his proposed resident engineer, and the contractor’s manager and agent. This is to effect introductions and exchange information about the principal initial matters concerning each party.作者: 健談 時間: 2025-3-30 09:49