作者: 摘要記錄 時間: 2025-3-21 22:58 作者: Leisureliness 時間: 2025-3-22 01:46 作者: 提名的名單 時間: 2025-3-22 06:40 作者: HALO 時間: 2025-3-22 12:46
Measurement of Concrete,nderer in relating prices more closely to costs and so simplifying estimating and assisting with the valuation of variations. A change of concrete mix or a variation in placing can be more readily accommodated by a change in the rate of one of the component items.作者: Inelasticity 時間: 2025-3-22 16:43
Measurement of Roads and Pavings,ycle tracks and other paved areas, together with the necessary kerbs, channels and edgings, traffic signs and surface markings. Landscaping, drainage, fences and gates, and gantries and similar structures supporting traffic signs are measured in accordance with the appropriate classes.作者: Inelasticity 時間: 2025-3-22 19:27
Measurement of Tunnels,before work is under way, it cannot be assessed accurately at tender stage. The work is highly mechanised and therefore extremely expensive, but is also subject to severe constraints owing to limitations of access and area of working face, and the uncertainty of ground conditions.作者: MENT 時間: 2025-3-22 23:14
Measurement of Rail Track,vered by items that include both supplying and laying. ‘Supply’ includes delivery of components to the site (rule C3), while ‘laying’ comprises all work subsequent to delivery of components to the site (rule C8). Where track is not to be supplied by the Contractor, the location is to be stated in ac作者: Nutrient 時間: 2025-3-23 05:22
Measurement of Sewer and Water Main Renovation and Ancillary Works,g the original sewer fabric, but excluding maintenance operations such as isolated local repairs and root or silt removal’. WRc has classified renovation techniques under the three broad categories of stabilisation, linings and coating, each of which is now described in outline. CESMM3 class Y incor作者: LAST 時間: 2025-3-23 07:39 作者: Mystic 時間: 2025-3-23 09:58 作者: 合同 時間: 2025-3-23 14:27
General Arrangement and Contents of Civil Engineering Bills of Quantities,work comprised in a Contract (1.7). (Perhaps the word ‘concise’ would be better substituted for ‘brief’.) All references in brackets refer to paragraphs in the . (paragraphs being the terminology used in CESMM3).作者: Anthrp 時間: 2025-3-23 20:55
Measurement of Concrete,nderer in relating prices more closely to costs and so simplifying estimating and assisting with the valuation of variations. A change of concrete mix or a variation in placing can be more readily accommodated by a change in the rate of one of the component items.作者: 產(chǎn)生 時間: 2025-3-23 22:11
Measurement of Roads and Pavings,ycle tracks and other paved areas, together with the necessary kerbs, channels and edgings, traffic signs and surface markings. Landscaping, drainage, fences and gates, and gantries and similar structures supporting traffic signs are measured in accordance with the appropriate classes.作者: orthodox 時間: 2025-3-24 02:46 作者: ALT 時間: 2025-3-24 10:13 作者: entail 時間: 2025-3-24 13:30 作者: 儲備 時間: 2025-3-24 18:48
Religiosit?t in der s?kularisierten WeltEarthworks form a major part of most civil engineering contracts. The pricing of this work is made difficult by its relatively uncertain nature and extent and the effect of weather and water. The measurement rules attempt to recognise these factors and to permit the tenderer to make allowance for them.作者: corpuscle 時間: 2025-3-24 21:25
Religiosit?t in der s?kularisierten WeltThis chapter covers several work sections from wall claddings to painting and waterproofing, with some common measurement principles running through them.作者: Coronary 時間: 2025-3-25 00:09 作者: Capture 時間: 2025-3-25 04:05
Religiosit?t in der s?kularisierten WeltThe rules for measurement of work in this class cover timber components, timber decking, and metal fittings and fastenings to the timber-work. The timber components are those used in permanent civil engineering work such as jetty timbers and fendering. Carpentry and joinery work to buildings is measured in accordance with Class Z.作者: 無可非議 時間: 2025-3-25 11:17 作者: Sedative 時間: 2025-3-25 12:42 作者: 祖?zhèn)髫敭a(chǎn) 時間: 2025-3-25 19:20 作者: 辯論 時間: 2025-3-25 22:26
Measurement of Ground Investigation, Geotechnical Processes, Demolition and Site Clearance,Ground or site investigation may be part of a construction contract or be a separate contract wholly concerned with this activity.作者: Etymology 時間: 2025-3-26 02:57
Measurement of Earthworks,Earthworks form a major part of most civil engineering contracts. The pricing of this work is made difficult by its relatively uncertain nature and extent and the effect of weather and water. The measurement rules attempt to recognise these factors and to permit the tenderer to make allowance for them.作者: cathartic 時間: 2025-3-26 06:13
Measurement of Brickwork, Blockwork, Masonry, Painting, Waterproofing and Simple Building Works incThis chapter covers several work sections from wall claddings to painting and waterproofing, with some common measurement principles running through them.作者: JAUNT 時間: 2025-3-26 09:47
Measurement of Piling,Some piling activities are very appropriately covered by method-related charges. For example, the transport of piling plant and equipment to the site and the erection of stagings can be covered by fixed charges and the operation of piling plant by time-related charges.作者: delegate 時間: 2025-3-26 14:12 作者: GUEER 時間: 2025-3-26 18:55
Measurement of Metalwork,A considerable proportion of the cost of steelwork is in fabrication where activities such as welding on fillets and cutting holes are entailed. Hence detailed drawings of connections and fittings are necessary at the tendering stage and this is assumed in the rules for measurement.作者: meritorious 時間: 2025-3-26 23:51
Measurement of Pipework,The rules for the measurement of pipes and associated work occupy four classes of the CESMM3 Work Classification (I-L). These are all closely interrelated and should be considered as a composite class.作者: BOAST 時間: 2025-3-27 02:24 作者: 沒有貧窮 時間: 2025-3-27 06:01 作者: 拘留 時間: 2025-3-27 12:07 作者: semble 時間: 2025-3-27 16:46
https://doi.org/10.1007/978-3-658-31035-6at their meaning and purpose shall be generally understood. The term ‘measurement’ covers both (1) ‘taking-off’ dimensions by scaling or reading from drawings and entering them in a recognised form on specially ruled paper, called ‘dimensions paper’ (illustrated on page 73), and (2) the actual measu作者: TIGER 時間: 2025-3-27 18:40
https://doi.org/10.1007/978-3-658-31035-6rty to it. It gives the legal background to work under a contract and is required by many examining bodies. For more comprehensive and detailed information on the law of contracts, which is a most complicated subject, the reader might consult, for example, ...作者: acheon 時間: 2025-3-27 22:58 作者: anaerobic 時間: 2025-3-28 02:38 作者: exorbitant 時間: 2025-3-28 08:30
What the Secularization Paradigm really saysnderer in relating prices more closely to costs and so simplifying estimating and assisting with the valuation of variations. A change of concrete mix or a variation in placing can be more readily accommodated by a change in the rate of one of the component items.作者: 粘 時間: 2025-3-28 14:19 作者: 亂砍 時間: 2025-3-28 15:14
https://doi.org/10.1007/978-1-349-10021-7before work is under way, it cannot be assessed accurately at tender stage. The work is highly mechanised and therefore extremely expensive, but is also subject to severe constraints owing to limitations of access and area of working face, and the uncertainty of ground conditions.作者: 闡明 時間: 2025-3-28 20:00
Palgrave Frontiers in Philosophy of Religionvered by items that include both supplying and laying. ‘Supply’ includes delivery of components to the site (rule C3), while ‘laying’ comprises all work subsequent to delivery of components to the site (rule C8). Where track is not to be supplied by the Contractor, the location is to be stated in ac作者: Interferons 時間: 2025-3-29 00:04 作者: 虛假 時間: 2025-3-29 07:02
https://doi.org/10.1007/978-3-658-31035-6at their meaning and purpose shall be generally understood. The term ‘measurement’ covers both (1) ‘taking-off’ dimensions by scaling or reading from drawings and entering them in a recognised form on specially ruled paper, called ‘dimensions paper’ (illustrated on page 73), and (2) the actual measurement of the work as executed on the site.作者: 沐浴 時間: 2025-3-29 08:08 作者: auxiliary 時間: 2025-3-29 15:18 作者: intricacy 時間: 2025-3-29 19:21
What the Secularization Paradigm really saysnderer in relating prices more closely to costs and so simplifying estimating and assisting with the valuation of variations. A change of concrete mix or a variation in placing can be more readily accommodated by a change in the rate of one of the component items.作者: meditation 時間: 2025-3-29 21:24 作者: 加劇 時間: 2025-3-30 01:17
https://doi.org/10.1007/978-1-349-10021-7before work is under way, it cannot be assessed accurately at tender stage. The work is highly mechanised and therefore extremely expensive, but is also subject to severe constraints owing to limitations of access and area of working face, and the uncertainty of ground conditions.作者: NUL 時間: 2025-3-30 05:16
Palgrave Frontiers in Philosophy of Religionvered by items that include both supplying and laying. ‘Supply’ includes delivery of components to the site (rule C3), while ‘laying’ comprises all work subsequent to delivery of components to the site (rule C8). Where track is not to be supplied by the Contractor, the location is to be stated in accordance with rule A13 of Class S.作者: explicit 時間: 2025-3-30 08:28
https://doi.org/10.1007/978-3-658-31035-6 of items, and on completion of construction the work can be remeasured and valued at the billed rates. That the latter is unsatisfactory is evidenced by the large claims settlements agreed on many projects, where variations and unforeseen physical conditions or artificial obstructions occur.作者: 里程碑 時間: 2025-3-30 15:18
Religious Experience and Belief,porates these techniques but also ancillary works involved in the preparation of existing sewers, such as cleaning, removing intrusions, closed-circuit television surveys, plugging and filling laterals and other pipes and local internal repairs.作者: 蘆筍 時間: 2025-3-30 20:08
Method-related Charges and Pricing and Measurement of Civil Engineering Work, of items, and on completion of construction the work can be remeasured and valued at the billed rates. That the latter is unsatisfactory is evidenced by the large claims settlements agreed on many projects, where variations and unforeseen physical conditions or artificial obstructions occur.作者: Antioxidant 時間: 2025-3-30 23:59 作者: BRAWL 時間: 2025-3-31 04:32 作者: Glower 時間: 2025-3-31 09:00
are covered; these are illustrated by some twenty-two worked examples containing working drawings and clear handwritten dimension sheets with fully explanatory notes. In addition to being completely revised and reset, the coverage is also extended with a further chapter on the measurement of the renovation of sewers and water mains.作者: 窗簾等 時間: 2025-3-31 10:18 作者: concise 時間: 2025-3-31 17:13
Textbook 1993Latest editionhey are implemented in practice. The contractual background to the measurement and valuation of civil engineering works is described in detail, as are the value and use of method-related charges. All aspects of the measurement of civil engineering work, from taking-off to bill preparation are covere作者: commute 時間: 2025-3-31 20:07
9樓作者: WAIL 時間: 2025-3-31 22:39
9樓作者: 膝蓋 時間: 2025-4-1 03:07
10樓作者: 敵手 時間: 2025-4-1 06:01
10樓作者: debase 時間: 2025-4-1 12:24
10樓作者: 不確定 時間: 2025-4-1 16:07
10樓