標(biāo)題: Titlebook: Building a Passive House; The Architect‘s Logb Stefano Piraccini,Kristian Fabbri Book 2018 Springer International Publishing AG 2018 PASSIV [打印本頁(yè)] 作者: 多話 時(shí)間: 2025-3-21 19:52
書(shū)目名稱Building a Passive House影響因子(影響力)
書(shū)目名稱Building a Passive House影響因子(影響力)學(xué)科排名
書(shū)目名稱Building a Passive House網(wǎng)絡(luò)公開(kāi)度
書(shū)目名稱Building a Passive House網(wǎng)絡(luò)公開(kāi)度學(xué)科排名
書(shū)目名稱Building a Passive House被引頻次
書(shū)目名稱Building a Passive House被引頻次學(xué)科排名
書(shū)目名稱Building a Passive House年度引用
書(shū)目名稱Building a Passive House年度引用學(xué)科排名
書(shū)目名稱Building a Passive House讀者反饋
書(shū)目名稱Building a Passive House讀者反饋學(xué)科排名
作者: 彎腰 時(shí)間: 2025-3-22 00:08 作者: 貧窮地活 時(shí)間: 2025-3-22 02:14 作者: 畏縮 時(shí)間: 2025-3-22 07:16
https://doi.org/10.1007/978-3-031-52776-0This chapter describes the construction details of the .作者: Interlocking 時(shí)間: 2025-3-22 09:53
Designing the Thermal Bridges,In a Passive House, it is necessary to design the thermal bridges; this does not necessarily mean eliminating them, but adopting the most suitable technical solution to make their dispersions compatible with the energy balance of the building.作者: 耕種 時(shí)間: 2025-3-22 16:56 作者: Melanoma 時(shí)間: 2025-3-22 17:20
,Designing the “Interferences” with the Technical Systems,To design the technical systems of a Passive House, it is necessary to avoid interferences with the insulating layers of the building’s envelope, as well as insulating the ducts that could cause dispersions or uncontrolled thermal loads.作者: Atmosphere 時(shí)間: 2025-3-22 23:03 作者: 讓空氣進(jìn)入 時(shí)間: 2025-3-23 02:39 作者: parsimony 時(shí)間: 2025-3-23 09:29 作者: amplitude 時(shí)間: 2025-3-23 10:07 作者: 詼諧 時(shí)間: 2025-3-23 17:31 作者: 國(guó)家明智 時(shí)間: 2025-3-23 18:12
Frank C. Hoppensteadt,Charles S. Peskinse the correct computerised tools for modelling. Once the design is finished, it is preferable to entrust building to an experienced construction company or, possibly, to be able to train them. In some cases, the construction techniques necessary for the construction of buildings with high performan作者: anus928 時(shí)間: 2025-3-23 23:07
Mathematics in Physics Educationion in the winter season and, at the same time, ensure shading in the summer season. Energy efficiency must involve not only every design stage (preliminary, definitive, final construction design), but also is a characteristic of the construction: starting from the multi-storey structure in CLT, ., 作者: CRAMP 時(shí)間: 2025-3-24 06:08 作者: Perineum 時(shí)間: 2025-3-24 08:11
Ileana M. Greca,Ana Raquel Pereira de Ataídeliance with the regulatory parameters or with the certification protocols, such as the Passive House certification—an activity that is present in every design phase—is one that, by means of the continuous interaction between form-technology-calculations-choice and so forth, leads to the achievement 作者: 極肥胖 時(shí)間: 2025-3-24 11:45 作者: MILL 時(shí)間: 2025-3-24 15:17
Building Envelope,slabs in cold environments, so as to achieve high energy performance. The same principle applies to the choice of the door and window frames, which, in addition to limiting the heat losses, must produce adequate heat gains through the accumulation of the solar radiation.作者: 傳授知識(shí) 時(shí)間: 2025-3-24 21:27 作者: Baffle 時(shí)間: 2025-3-25 00:42
Green Energy and Technologyhttp://image.papertrans.cn/b/image/191830.jpg作者: 褻瀆 時(shí)間: 2025-3-25 06:12
https://doi.org/10.1007/978-3-319-69938-7PASSIVE HOUSE design; LOW ENERGY BUILDINGS; TECHNOLOGICAL INNOVATION in architecture; NZEB (NEAR ZERO E作者: 正常 時(shí)間: 2025-3-25 08:21
978-3-319-88865-1Springer International Publishing AG 2018作者: Panacea 時(shí)間: 2025-3-25 13:35
https://doi.org/10.1007/978-3-031-52776-0o assess and measure the performance of what had been built. The monitoring campaign concerns the building envelope (roof slab and vertical wall) and the indoor microclimate of a room. In this chapter, we present the content and results of the monitoring campaign.作者: 線 時(shí)間: 2025-3-25 17:38 作者: 粗魯?shù)娜?nbsp; 時(shí)間: 2025-3-25 20:49 作者: 污穢 時(shí)間: 2025-3-26 01:11 作者: 希望 時(shí)間: 2025-3-26 07:33 作者: 不開(kāi)心 時(shí)間: 2025-3-26 11:43 作者: Resection 時(shí)間: 2025-3-26 13:46
https://doi.org/10.1007/978-1-4615-7402-60% of the energy that is produced in the entire European Union. Reducing energy consumption has become a priority. The Passive House standard combines adaptation to the climatic context with innovations in terms of the methodological approach, construction technologies and systems: it is the next step in this functional process.作者: 輕快走過(guò) 時(shí)間: 2025-3-26 19:36
Frank C. Hoppensteadt,Charles S. Peskin speed of execution, and (IV) energy efficiency and the reduction of energy costs guaranteed by a Passive House. The economic investment becomes sustainable also thanks to the “all inclusive” formula, i.e. the lease includes the rent and the energy expenditure, which in this case is nearly zero.作者: Aspiration 時(shí)間: 2025-3-26 23:47 作者: 小鹿 時(shí)間: 2025-3-27 03:13 作者: 絕食 時(shí)間: 2025-3-27 07:45 作者: 想象 時(shí)間: 2025-3-27 09:55
Form and Structure,minary, definitive, final construction design), but also is a characteristic of the construction: starting from the multi-storey structure in CLT, ., which rests on a foundation in reinforced concrete.作者: paragon 時(shí)間: 2025-3-27 17:06 作者: 反省 時(shí)間: 2025-3-27 20:42 作者: 使殘廢 時(shí)間: 2025-3-27 23:46
An Uphill Trek,s taken the back seat with the advent of the climate control system. Buildings require an amount of energy that currently accounts for approximately 40% of the energy that is produced in the entire European Union. Reducing energy consumption has become a priority. The Passive House standard combines作者: commonsense 時(shí)間: 2025-3-28 03:43 作者: 女上癮 時(shí)間: 2025-3-28 10:16 作者: 防銹 時(shí)間: 2025-3-28 12:10
Form and Structure,ion in the winter season and, at the same time, ensure shading in the summer season. Energy efficiency must involve not only every design stage (preliminary, definitive, final construction design), but also is a characteristic of the construction: starting from the multi-storey structure in CLT, ., 作者: Obedient 時(shí)間: 2025-3-28 14:53
Building Envelope,slabs in cold environments, so as to achieve high energy performance. The same principle applies to the choice of the door and window frames, which, in addition to limiting the heat losses, must produce adequate heat gains through the accumulation of the solar radiation.作者: 改進(jìn) 時(shí)間: 2025-3-28 19:18 作者: FANG 時(shí)間: 2025-3-29 02:30 作者: 抵消 時(shí)間: 2025-3-29 04:53 作者: 助記 時(shí)間: 2025-3-29 09:41
1865-3529 would answer these answers – in vain. So he decided to brave these dangerous waters alone, and after successfully completing his project, he decided to write a book to help others in the same situation. The boo978-3-319-88865-1978-3-319-69938-7Series ISSN 1865-3529 Series E-ISSN 1865-3537 作者: GEST 時(shí)間: 2025-3-29 14:39
,Die Anerkennung der Lohnsteuerhilfevereine durch die Aufsichtsbeh?rden (§§ 14 ff. StBerG),ns in das neu gefasste Steuerberatungsgesetz aufgenommen. Durch diese Regelungen sollte sichergestellt werden, dass die sachgem??e Ausübung der Hilfeleistung in Lohnsteuersachen sowie eine ordnungsgem??e Gesch?ftsführung der Vereine geleistet werde (vgl. V?lzke 1975, S.?1283; Goez 2012, StBerG, §?13