派博傳思國際中心

標題: Titlebook: Beyond Manufacturing Resource Planning (MRP II); Advanced Models and Andreas Drexl,Alf Kimms Book 1998 Springer-Verlag Berlin Heidelberg 1 [打印本頁]

作者: antibody    時間: 2025-3-21 18:32
書目名稱Beyond Manufacturing Resource Planning (MRP II)影響因子(影響力)




書目名稱Beyond Manufacturing Resource Planning (MRP II)影響因子(影響力)學(xué)科排名




書目名稱Beyond Manufacturing Resource Planning (MRP II)網(wǎng)絡(luò)公開度




書目名稱Beyond Manufacturing Resource Planning (MRP II)網(wǎng)絡(luò)公開度學(xué)科排名




書目名稱Beyond Manufacturing Resource Planning (MRP II)被引頻次




書目名稱Beyond Manufacturing Resource Planning (MRP II)被引頻次學(xué)科排名




書目名稱Beyond Manufacturing Resource Planning (MRP II)年度引用




書目名稱Beyond Manufacturing Resource Planning (MRP II)年度引用學(xué)科排名




書目名稱Beyond Manufacturing Resource Planning (MRP II)讀者反饋




書目名稱Beyond Manufacturing Resource Planning (MRP II)讀者反饋學(xué)科排名





作者: Repatriate    時間: 2025-3-22 00:01
Knowledge-Based System for Master Production Scheduling MPS is selected out of 192 alternative MPS determined by using a Cell Loading software in a Cellular Manufacturing environment. The software is used to help implement a Knowledge-Based Finite Schedule Material Requirements Planning (MRP II) in a jewelry manufacturing plant. The knowledge base syste
作者: Jingoism    時間: 2025-3-22 02:06
Cover-Time Planning: A Less Complex Alternative to MRPme Planning contrary to an ordinary reorder point system uses time as a decision variable instead of quantity. Cover-Time Planning has like Kanban a built in restriction of work-in-process. Not until previous production is consumed a new production is initiated.
作者: 延期    時間: 2025-3-22 07:41

作者: Ischemia    時間: 2025-3-22 12:44

作者: flaggy    時間: 2025-3-22 13:09

作者: 聯(lián)合    時間: 2025-3-22 20:20

作者: 可觸知    時間: 2025-3-23 00:22

作者: Obstacle    時間: 2025-3-23 02:11

作者: 拍下盜公款    時間: 2025-3-23 09:11

作者: Nmda-Receptor    時間: 2025-3-23 10:27
Maintaining Robust Schedules by Fuzzy Reasoningory, it is undesirable to reschedule from scratch in such cases. Since the supplier of raw materials and clients will be prepared for the predicted schedule it is important to change only those features of the schedule that are necessary..We show how on one side fuzzy logic can be used to support th
作者: 與野獸博斗者    時間: 2025-3-23 16:43

作者: inspiration    時間: 2025-3-23 20:15

作者: 尊敬    時間: 2025-3-24 01:26

作者: CLASH    時間: 2025-3-24 03:42
https://doi.org/10.1057/9781137305497ant problem is tackled through a flexible definition of product structures which forms the basis for product configuration. Industrial examples demonstrate how such a strategy can be implemented successfully.
作者: 戲服    時間: 2025-3-24 09:37
https://doi.org/10.1057/9781137305497sfully attacked in the recent past. Furthermore, lot size and sequence decisions are usually not integrated as it ought to be for the short-term planning. This paper reviews the history of multi-level lot sizing from the very early work to the state-of-the-art.
作者: ILEUM    時間: 2025-3-24 13:09
https://doi.org/10.1007/978-3-030-65439-9nt heuristics are developed to improve the schedule after re-insertion. The computational study showed that the approach of using re-insertion heuristics combined with local adjustment heuristics performs very well.
作者: 性學(xué)院    時間: 2025-3-24 18:43
Global Dynamics of Social Policyroduction we investigate different sequencing policies and introduce an extended heuristic for the case of color-batch-sequencing. For different types of objectives the performance of the heuristics presented is analyzed, taking known heuristics into consideration.
作者: dowagers-hump    時間: 2025-3-24 19:07
Global Dynamics of Social Policyf capacity and work. A suggestion to integrate the strategy into production planning and control (PPC) on the planning level has been generated. The objective of this approach is to develop the present open loop control realised in PPC into a closed loop control with defined control and reference variables.
作者: HOWL    時間: 2025-3-25 02:04

作者: 包庇    時間: 2025-3-25 07:25
Resource Planning (MRP II) is im- plemented in most commercial production planning software tools and is commonly accepted by practitioners. However, these peo- ple are not satisfied with production planning and complain about long lead times, high work-in-process, and backlogging. As many researche
作者: padding    時間: 2025-3-25 08:27
https://doi.org/10.1057/9781137305497s and each production decision by a node. Starting with a horizon . = 1 the procedure successively increases . and eliminates in each iteration .. decisions that are not part of an optimal policy using data of the first . periods.
作者: Chipmunk    時間: 2025-3-25 15:35

作者: FAR    時間: 2025-3-25 19:25

作者: Anguish    時間: 2025-3-25 22:45
A Perfect Algorithm for the Capacitated Lot Size Model with Stockoutss and each production decision by a node. Starting with a horizon . = 1 the procedure successively increases . and eliminates in each iteration .. decisions that are not part of an optimal policy using data of the first . periods.
作者: Mast-Cell    時間: 2025-3-26 02:32

作者: 手術(shù)刀    時間: 2025-3-26 07:08
An Interactive MRP II — Scheduling Systemstem depends on its capability to complement, rather than replace, the human planner. Such a capability is based on the system’s architecture: The data structure, the scheduling heuristic, and the graphic interface required by the user in the shop floor.
作者: 打包    時間: 2025-3-26 12:14
Book 1998by practitioners. However, these peo- ple are not satisfied with production planning and complain about long lead times, high work-in-process, and backlogging. As many researchers have pointed out, the reason for these shortcomings is inherent to the methods that are used. The research community is
作者: acrophobia    時間: 2025-3-26 13:46

作者: Communal    時間: 2025-3-26 17:15
Multi-Level Lot Sizing — An Annotated Bibliographysfully attacked in the recent past. Furthermore, lot size and sequence decisions are usually not integrated as it ought to be for the short-term planning. This paper reviews the history of multi-level lot sizing from the very early work to the state-of-the-art.
作者: CANT    時間: 2025-3-27 00:08
A Prioritized Re-Insertion Approach to Production Reschedulingnt heuristics are developed to improve the schedule after re-insertion. The computational study showed that the approach of using re-insertion heuristics combined with local adjustment heuristics performs very well.
作者: 現(xiàn)實    時間: 2025-3-27 01:54
Objectives for Order—Sequencing in Automobile Productionroduction we investigate different sequencing policies and introduce an extended heuristic for the case of color-batch-sequencing. For different types of objectives the performance of the heuristics presented is analyzed, taking known heuristics into consideration.
作者: ETHER    時間: 2025-3-27 07:31
https://doi.org/10.1057/9781137305497gration taking the factors above into consideration. A matrix is presented where three material based characteristics meet four capacity based characteristics, and the resulting twelve situations depict possible manufacturing settings. In this context, issues such as material and capacity integratio
作者: cochlea    時間: 2025-3-27 11:08
https://doi.org/10.1057/9781137305497 to establishing MPS and suggested acceptance and rejection values for the performance measures. An experimentation was conducted in order to support the expert recommendations and to observe the behavior of the performance measures in terms of the number of shifts allowed and the number of manufact
作者: guardianship    時間: 2025-3-27 15:06
https://doi.org/10.1057/9781137305497olution we present a priority rule based scheduling procedure which is backward-oriented, i.e. at first lot-sizes are fixed in the last period, then in the last but one period, and so on. The priority rule consists of a convex combination of estimated holding and setup cost savings. Since the soluti
作者: 思想上升    時間: 2025-3-27 21:12

作者: Capture    時間: 2025-3-27 23:48
Global Dynamics of Social Policyonly the most likely duration of operations. This schedule is iteratively “repaired” until some threshold evaluation is found. A repair is found with a local search procedure based on tabu search. Finally, we show which events can lead to reactive scheduling and how this is supported by the repair s
作者: 大約冬季    時間: 2025-3-28 03:28
issue, we discovered that MRP II is a topic about which not only management scientists show interest. As the list of authors proves, industrial engineers, computer scientists, and-operations researchers from academia as well as practitioners have contributed to this book.978-3-642-08393-8978-3-662-03742-3
作者: 多樣    時間: 2025-3-28 08:57

作者: Offensive    時間: 2025-3-28 13:11

作者: Constituent    時間: 2025-3-28 18:32

作者: 緯度    時間: 2025-3-28 21:56

作者: 紳士    時間: 2025-3-29 00:49
Maintaining Robust Schedules by Fuzzy Reasoningonly the most likely duration of operations. This schedule is iteratively “repaired” until some threshold evaluation is found. A repair is found with a local search procedure based on tabu search. Finally, we show which events can lead to reactive scheduling and how this is supported by the repair s
作者: Pelago    時間: 2025-3-29 06:46
Book 1998we received papers for this issue, we discovered that MRP II is a topic about which not only management scientists show interest. As the list of authors proves, industrial engineers, computer scientists, and-operations researchers from academia as well as practitioners have contributed to this book.
作者: debacle    時間: 2025-3-29 09:03
https://doi.org/10.1057/9781137305497me Planning contrary to an ordinary reorder point system uses time as a decision variable instead of quantity. Cover-Time Planning has like Kanban a built in restriction of work-in-process. Not until previous production is consumed a new production is initiated.
作者: invulnerable    時間: 2025-3-29 11:54
https://doi.org/10.1007/978-3-662-03742-3Autodesk Inventor; Manufacturing; algorithms; capacity; control; control theory; decision making; fuzzy rea
作者: entitle    時間: 2025-3-29 17:17
978-3-642-08393-8Springer-Verlag Berlin Heidelberg 1998
作者: AVOW    時間: 2025-3-29 22:21

作者: Cholesterol    時間: 2025-3-30 00:15
https://doi.org/10.1057/9781137305497. customer service, manufacturing efficiency and inventory investment, involving both market and manufacturing insights. Master scheduling has traditionally been treated as a material-based planning tool, e.g. in the MRP II (manufacturing resource planning) approach to master scheduling. Capacity is
作者: 詞匯記憶方法    時間: 2025-3-30 04:19
https://doi.org/10.1057/9781137305497 MPS is selected out of 192 alternative MPS determined by using a Cell Loading software in a Cellular Manufacturing environment. The software is used to help implement a Knowledge-Based Finite Schedule Material Requirements Planning (MRP II) in a jewelry manufacturing plant. The knowledge base syste
作者: MUTE    時間: 2025-3-30 09:48

作者: 分期付款    時間: 2025-3-30 16:18
https://doi.org/10.1057/9781137305497 immense pressure to reduce costs. These contradicting goals dominate many product strategy discussions. Should variants be avoided or should companies rather seek to master their variants efficiently?.This paper presents a possible solution that combines both strategies mentioned. The multiple-vari




歡迎光臨 派博傳思國際中心 (http://www.pjsxioz.cn/) Powered by Discuz! X3.5
额济纳旗| 务川| 屏山县| 永春县| 元江| 鄂托克旗| 密山市| 日土县| 卢氏县| 绿春县| 麻城市| 汶上县| 固阳县| 清镇市| 建瓯市| 邹平县| 天柱县| 甘泉县| 长海县| 勃利县| 伊金霍洛旗| 兰西县| 龙山县| 曲水县| 榆社县| 长春市| 伊宁市| 高碑店市| 桂阳县| 江川县| 绍兴县| 正定县| 五常市| 乐安县| 应用必备| 德钦县| 五寨县| 泽州县| 高邮市| 滁州市| 郧西县|