標(biāo)題: Titlebook: Assessment of Power System Reliability; Methods and Applicat Marko ?epin Book 2011 Springer-Verlag London 2011 CP4622.Electrical Engineerin [打印本頁(yè)]

作者: 突然    時(shí)間: 2025-3-21 18:28
書(shū)目名稱Assessment of Power System Reliability影響因子(影響力)




書(shū)目名稱Assessment of Power System Reliability影響因子(影響力)學(xué)科排名




書(shū)目名稱Assessment of Power System Reliability網(wǎng)絡(luò)公開(kāi)度




書(shū)目名稱Assessment of Power System Reliability網(wǎng)絡(luò)公開(kāi)度學(xué)科排名




書(shū)目名稱Assessment of Power System Reliability被引頻次




書(shū)目名稱Assessment of Power System Reliability被引頻次學(xué)科排名




書(shū)目名稱Assessment of Power System Reliability年度引用




書(shū)目名稱Assessment of Power System Reliability年度引用學(xué)科排名




書(shū)目名稱Assessment of Power System Reliability讀者反饋




書(shū)目名稱Assessment of Power System Reliability讀者反饋學(xué)科排名





作者: 沉思的魚(yú)    時(shí)間: 2025-3-21 23:31
ults.Written in straightforward language.The importance of power system reliability is demonstrated when our electricity supply is disrupted, whether it decreases the comfort of our free time at home or causes the shutdown of our companies and results in huge economic deficits. .The objective of .As
作者: adhesive    時(shí)間: 2025-3-22 00:36
Developments in Fingerprint Visualisation,ools, and measures are developed, which highlight the questions about the power systems reliability each from its viewpoint. Introduction to power systems highlights the short history of power systems, the facts about increased consumption and complexity of power systems, and the problems with reliability definition and application.
作者: 空氣    時(shí)間: 2025-3-22 05:41

作者: Graduated    時(shí)間: 2025-3-22 09:02
Introduction to Power Systemsools, and measures are developed, which highlight the questions about the power systems reliability each from its viewpoint. Introduction to power systems highlights the short history of power systems, the facts about increased consumption and complexity of power systems, and the problems with reliability definition and application.
作者: Eulogy    時(shí)間: 2025-3-22 15:53

作者: Heart-Rate    時(shí)間: 2025-3-22 20:42
Richard S. Frank,Stanley P. Sobolemphasis on their causes and consequences in this chapter. Estimation of the future risks connected with blackouts is an important task, not only to prevent huge economic damage but also to protect human lives.
作者: accomplishment    時(shí)間: 2025-3-22 23:59
https://doi.org/10.1007/978-3-658-09271-9des are connected to either a high- or low-terminal node, which represents the output of the function. The development of examples of binary decision diagrams is presented in text and in figures. Shannon decomposition is explained. The conversion of a fault tree to a binary decision diagram is shown.
作者: 不可比擬    時(shí)間: 2025-3-23 01:48

作者: Neutral-Spine    時(shí)間: 2025-3-23 06:59
https://doi.org/10.1007/978-1-4614-0263-3d in the results. The methods are presented and the related equations and systems of equations are explained. The focus is placed to the Newton?Raphson method and to Gauss?Seidel method. The iterative procedures are explained. The graphical representation of the procedure steps is given.
作者: extinct    時(shí)間: 2025-3-23 13:36

作者: COKE    時(shí)間: 2025-3-23 16:29

作者: indigenous    時(shí)間: 2025-3-23 19:01

作者: 楓樹(shù)    時(shí)間: 2025-3-24 01:27
Methods for Power Flow Analysisd in the results. The methods are presented and the related equations and systems of equations are explained. The focus is placed to the Newton?Raphson method and to Gauss?Seidel method. The iterative procedures are explained. The graphical representation of the procedure steps is given.
作者: encomiast    時(shí)間: 2025-3-24 02:39

作者: 反復(fù)無(wú)常    時(shí)間: 2025-3-24 09:52
https://doi.org/10.1007/978-3-642-69403-5ion is similar to the fault tree evaluation. Two general methods or approaches exist for the event tree linking process with the fault tree analysis. The small event tree and large fault tree approach are mostly used in nuclear industry in probabilistic safety assessment of nuclear power plants.
作者: Lineage    時(shí)間: 2025-3-24 13:39

作者: Basilar-Artery    時(shí)間: 2025-3-24 18:34
Fault Tree Analysisquantitative evaluation is presented. The illustrative examples for the application of the importance measures, such as Fussel?Vesely importance, risk achievement worth, risk reduction worth, and Birnbaum importance, are given. The applications of the fault tree analysis are mentioned, and a comprehensive list of related references is given.
作者: 不給啤    時(shí)間: 2025-3-24 21:13
Event Tree Analysision is similar to the fault tree evaluation. Two general methods or approaches exist for the event tree linking process with the fault tree analysis. The small event tree and large fault tree approach are mostly used in nuclear industry in probabilistic safety assessment of nuclear power plants.
作者: 夸張    時(shí)間: 2025-3-25 00:59

作者: 沒(méi)血色    時(shí)間: 2025-3-25 03:34

作者: Memorial    時(shí)間: 2025-3-25 10:22
Definition of Reliability and Riskccur in the system. RiskRisk is a combination of a probability for an accident occurrence and resulting negative consequences. Risk is often reserved for random events with negative consequences to human life and environment.
作者: TERRA    時(shí)間: 2025-3-25 15:26

作者: 大氣層    時(shí)間: 2025-3-25 17:27

作者: 輕而薄    時(shí)間: 2025-3-25 23:09
Richard S. Frank,Stanley P. Sobol accepted definition of reliability defines the reliability as the characteristic of an item expressed by the probability that it will perform a required function under stated conditions for a stated period of time. The term reliability is divided to two terms when dealing with the power systems. Th
作者: glomeruli    時(shí)間: 2025-3-26 02:06
The Scientific Investigation of Fire Causes, probability from a perspective of engineers who are going to use the probability theory as a support for the practical reliability analyses is presented. Probability can be defined in terms of frequency of occurrence, as a percentage of successes in a large number of similar situations. Or probabil
作者: –LOUS    時(shí)間: 2025-3-26 05:51
A. Maehly,R. L. Williams (Director)ace industry, electrical industry, chemical industry, railway industry, transport, software reliability, and insurance. The fault tree analysis is described in a way of the procedure for application together with small practical examples. The development of the fault trees and their qualitative and
作者: 阻礙    時(shí)間: 2025-3-26 08:33

作者: 天然熱噴泉    時(shí)間: 2025-3-26 16:22

作者: 開(kāi)花期女    時(shí)間: 2025-3-26 17:34

作者: jumble    時(shí)間: 2025-3-26 20:59

作者: 過(guò)度    時(shí)間: 2025-3-27 03:03
Prosodic Features for Speaker Recognitiont of a shared root cause. If the dependency exists between parallel events, the probability of system failure is larger than the product of failure probabilities of all parallel events. The procedures for common cause failure analysis are presented. The representation of common cause failures within
作者: TAP    時(shí)間: 2025-3-27 07:25

作者: 經(jīng)典    時(shí)間: 2025-3-27 13:09

作者: Thyroiditis    時(shí)間: 2025-3-27 15:14

作者: FLOUR    時(shí)間: 2025-3-27 20:32

作者: 空氣    時(shí)間: 2025-3-28 01:28

作者: 鎮(zhèn)痛劑    時(shí)間: 2025-3-28 02:07
Marko ?epinProvides varied examples for both novice and advanced practitioners.Features tables of sample data that enable traceability of the given results.Written in straightforward language
作者: 準(zhǔn)則    時(shí)間: 2025-3-28 08:53
http://image.papertrans.cn/b/image/163392.jpg
作者: Dealing    時(shí)間: 2025-3-28 12:11

作者: eczema    時(shí)間: 2025-3-28 17:37

作者: 廢墟    時(shí)間: 2025-3-28 19:11
Introduction to Power Systemsic power systems, it is relatively difficult to define and assess the reliability as a single parameter of a single system. Rather, several methods, tools, and measures are developed, which highlight the questions about the power systems reliability each from its viewpoint. Introduction to power sys
作者: 控訴    時(shí)間: 2025-3-28 22:55

作者: 愛(ài)好    時(shí)間: 2025-3-29 06:06

作者: 臥虎藏龍    時(shí)間: 2025-3-29 07:20
Probability Theory probability from a perspective of engineers who are going to use the probability theory as a support for the practical reliability analyses is presented. Probability can be defined in terms of frequency of occurrence, as a percentage of successes in a large number of similar situations. Or probabil
作者: anesthesia    時(shí)間: 2025-3-29 11:49

作者: Graves’-disease    時(shí)間: 2025-3-29 15:42

作者: Sarcoma    時(shí)間: 2025-3-29 22:57
Binary Decision Diagramsists of a set of decision nodes, starting at the root node at the top of the decision diagram. Each decision node contains two outgoing branches, one is a high branch and the other is a low branch. These branches may be represented as . and ., respectively. The binary decision diagram contains high
作者: 菊花    時(shí)間: 2025-3-30 01:12
Markov Processes the process moving from one state to another is denoted by the transition probability and the probability of the process remaining in the same state is denoted by certain probability. Such modeling provides a clear representation of all the states of a system as well as the transition between these
作者: 索賠    時(shí)間: 2025-3-30 05:54

作者: 滔滔不絕的人    時(shí)間: 2025-3-30 11:43

作者: 減少    時(shí)間: 2025-3-30 12:31

作者: 彩色的蠟筆    時(shí)間: 2025-3-30 17:14
Generating Capacity Methods give all the answers, does not exist, because the power systems are far too complex for this to be possible. Selected methods, measures and indicators are summarized from the point of view of generating power and energy which is produced in power plants. Generation reserve margin is a measure, whic
作者: 命令變成大炮    時(shí)間: 2025-3-30 23:55
Reliability and Performance Indicators of Power Plantsach of the plants is presented by its reliability indicators. The need for several indicators for one plant arises from the fact that the plants under consideration are fairly complex facilities and they are a part of a very complex system, where only one indicator may not be sufficient. The present