派博傳思國(guó)際中心

標(biāo)題: Titlebook: Application of Geographical Information Systems and Soft Computation Techniques in Water and Water B; Mrinmoy Majumder Book 2018 Springer [打印本頁(yè)]

作者: 揭發(fā)    時(shí)間: 2025-3-21 18:04
書(shū)目名稱Application of Geographical Information Systems and Soft Computation Techniques in Water and Water B影響因子(影響力)




書(shū)目名稱Application of Geographical Information Systems and Soft Computation Techniques in Water and Water B影響因子(影響力)學(xué)科排名




書(shū)目名稱Application of Geographical Information Systems and Soft Computation Techniques in Water and Water B網(wǎng)絡(luò)公開(kāi)度




書(shū)目名稱Application of Geographical Information Systems and Soft Computation Techniques in Water and Water B網(wǎng)絡(luò)公開(kāi)度學(xué)科排名




書(shū)目名稱Application of Geographical Information Systems and Soft Computation Techniques in Water and Water B被引頻次




書(shū)目名稱Application of Geographical Information Systems and Soft Computation Techniques in Water and Water B被引頻次學(xué)科排名




書(shū)目名稱Application of Geographical Information Systems and Soft Computation Techniques in Water and Water B年度引用




書(shū)目名稱Application of Geographical Information Systems and Soft Computation Techniques in Water and Water B年度引用學(xué)科排名




書(shū)目名稱Application of Geographical Information Systems and Soft Computation Techniques in Water and Water B讀者反饋




書(shū)目名稱Application of Geographical Information Systems and Soft Computation Techniques in Water and Water B讀者反饋學(xué)科排名





作者: Rejuvenate    時(shí)間: 2025-3-21 21:20

作者: airborne    時(shí)間: 2025-3-22 04:18

作者: 金盤是高原    時(shí)間: 2025-3-22 06:37

作者: SCORE    時(shí)間: 2025-3-22 09:12
https://doi.org/10.1007/978-3-031-29344-3rtance. Most of such methods are rather subjective and does not include the impact of the parameters to create hazards, cost to mitigate the hazard and utility to asses water quality. That is why; the present investigation proposes an objective method to determine the magnitude of weight, incorporat
作者: 注射器    時(shí)間: 2025-3-22 13:10
https://doi.org/10.1007/978-3-319-23944-6s been increased simultaneously. As the resources of conventional fuels are limited, alternate energy sources to replace fossil fuels are now preferred to supply the excess demand. Among all the sources of alternate energy, hydropower was found to be the most reliable but inexpensive source of alter
作者: Individual    時(shí)間: 2025-3-22 18:42
Time in Eternity and Eternity in Timenmental conditions and socio-economic regional state, the selection criteria have been suggested. This would form the basis for energy device selection for the decision makers. If analytical network process (ANP) is used to determine the weight vector to be assigned to the criteria considered for a
作者: 喃喃而言    時(shí)間: 2025-3-22 23:52

作者: 反饋    時(shí)間: 2025-3-23 04:20
https://doi.org/10.1007/978-3-319-23944-6aking a decision regarding development of a SHP project, its financial viability is to be assessed along with technical feasibility. In the present study, a methodology has been developed for cost assessment of high head run of river (ROR) SHP projects in order to determine their techno-economic via
作者: languor    時(shí)間: 2025-3-23 06:06

作者: Physiatrist    時(shí)間: 2025-3-23 11:27

作者: Lumbar-Stenosis    時(shí)間: 2025-3-23 16:56

作者: 多余    時(shí)間: 2025-3-23 19:30
Application of Geographical Information Systems and Soft Computation Techniques in Water and Water B978-981-10-6205-6Series ISSN 1614-810X Series E-ISSN 2198-316X
作者: Coronary-Spasm    時(shí)間: 2025-3-24 00:05
Case Study II Enterprise Risk Management/l) using normalized flow discharge per unit area (Q/km.; m./s/km.). Alternative method by coupling the sediment rating and flow duration curve (both daily and monthly) are also used for checking purpose. The limitations and insights of total sediment loadings estimates for the case study are discussed in order of importance.
作者: 虛度    時(shí)間: 2025-3-24 02:52
https://doi.org/10.1007/978-3-031-29344-3y of the sample water bodies in North East India with the proposed WQI is also incorporated to verify the applicability of the proposed index. The results show that the values of proposed WQI are close to that of NSF WQI and also in parity with available data.
作者: 歌唱隊(duì)    時(shí)間: 2025-3-24 09:58

作者: hyperuricemia    時(shí)間: 2025-3-24 11:18

作者: Urologist    時(shí)間: 2025-3-24 17:35
An Approach to Develop an Alternative Water Quality Index Using FLDMy of the sample water bodies in North East India with the proposed WQI is also incorporated to verify the applicability of the proposed index. The results show that the values of proposed WQI are close to that of NSF WQI and also in parity with available data.
作者: 古代    時(shí)間: 2025-3-24 20:36
A MCDM-NBO Approach for Selection of Installation Location for Wave Energy Power Plantshis regard this study utilized three population based nature oriented optimization algorithms. The results from the study will reduce the search space of finding ideal location for installation of wave energy power plants. After applying the method in coastal region of Europe the results encouraged further applications of the method.
作者: 曲解    時(shí)間: 2025-3-25 00:08
1614-810X studies with applications.Discusses how water based renewab.This book highlights the application of Geographical Information System (GIS) and nature based algorithms to solve the problems of water and water based renewable energy resources. The irregularity in availability of resources and ineffici
作者: 萬(wàn)神殿    時(shí)間: 2025-3-25 06:34

作者: 全面    時(shí)間: 2025-3-25 10:14
An Approach for Wind-Pumped Storage Plant Scheduling Under Uncertaintyd to manage the risk during the scheduling of wind-PSP system by maximizing the total revenue, where the numbers of experiments are performed in order to access the criticality of possible outcomes. In this study, an adjustable speed type PSP unit is considered for better reliability.
作者: 謊言    時(shí)間: 2025-3-25 11:44
Book 2018sed renewable energy resources. The irregularity in availability of resources and inefficiency in utilization of the available resources has reduced the potentiality of water and water based renewable energy resources. In recent years various soft computation methods (SCM) along with GIS were adopte
作者: 表否定    時(shí)間: 2025-3-25 18:39
Review of Reservoir Sediment Inflow Estimation for Teriang Reservoir, Malaysiar useful service life, normally 100-year ARI design period. To achieve this objective, a review of the past and contemporary literatures and conventions on sedimentation issues in Malaysia as well as other regional countries is imperative. A case study was carried out using the proposed Teriang rese
作者: Countermand    時(shí)間: 2025-3-25 20:14

作者: Antarctic    時(shí)間: 2025-3-26 01:05

作者: 呼吸    時(shí)間: 2025-3-26 06:35
Development of Financial Liability Index for Hydropower Plant with MCDM and Neuro-genetic Modelss been increased simultaneously. As the resources of conventional fuels are limited, alternate energy sources to replace fossil fuels are now preferred to supply the excess demand. Among all the sources of alternate energy, hydropower was found to be the most reliable but inexpensive source of alter
作者: 無(wú)法治愈    時(shí)間: 2025-3-26 12:12

作者: Flatus    時(shí)間: 2025-3-26 14:06
A MCDM-NBO Approach for Selection of Installation Location for Wave Energy Power Plantsl shortcoming of converters, hostility from local populations and many other factors the cost of installation for wave power plant is expensive compared to other forms of renewable energy of the obstacles seems to be location dependent. That is why; selection of an ideal location for wave energy pro
作者: 使尷尬    時(shí)間: 2025-3-26 18:30
Cost Optimization of High Head Run of River Small Hydropower Projectsaking a decision regarding development of a SHP project, its financial viability is to be assessed along with technical feasibility. In the present study, a methodology has been developed for cost assessment of high head run of river (ROR) SHP projects in order to determine their techno-economic via
作者: 主講人    時(shí)間: 2025-3-26 22:59

作者: cogitate    時(shí)間: 2025-3-27 02:33
1614-810X te the uncertainty for optimal utilization of the available water resources. The advantage of SCM and GIS were used to maximize the utilization of water resources under cost and time constraints in face of climatic abnormalities and effect of rapid urbanization..978-981-13-4825-9978-981-10-6205-6Series ISSN 1614-810X Series E-ISSN 2198-316X
作者: indecipherable    時(shí)間: 2025-3-27 08:16
Application of Geographical Information Systems and Soft Computation Techniques in Water and Water B
作者: ALOFT    時(shí)間: 2025-3-27 11:47

作者: BYRE    時(shí)間: 2025-3-27 15:54

作者: 細(xì)微的差異    時(shí)間: 2025-3-27 20:03

作者: 使高興    時(shí)間: 2025-3-27 22:14
Time in Eternity and Eternity in Timedata well, with R. values of 0.98462 and 0.9964 for the linear regression model and the ANN model respectively. According to the results, wave height was found to have maximum importance followed by wind speed, wave period, water depth and salinity. The total three different neural networks were dev
作者: TEM    時(shí)間: 2025-3-28 02:42

作者: figment    時(shí)間: 2025-3-28 07:40
Analyzing Extreme Events Using Standardized Precipitation Index During the 20th Century for Surat Dis observed that the years 1942, 1945 and 1959 are identified as severe wet events for all the time scale. Year 1998 is identified as moderate wet event for all time scale. Years 1936 and 1987 are identified as severe dry events and year 1935 is identified as moderate dry event for all the time scale
作者: 取回    時(shí)間: 2025-3-28 11:45
Development of Financial Liability Index for Hydropower Plant with MCDM and Neuro-genetic Modelssame importance on liability analysis of Hydropower projects. Thus some factors are overrated and some other under rated which resulted in erroneous decision making. The present investigation proposed a new method of liability analysis where all the major factors were given separate importance as de
作者: Cursory    時(shí)間: 2025-3-28 16:17

作者: 群島    時(shí)間: 2025-3-28 20:41
Cost Optimization of High Head Run of River Small Hydropower Projectshave been developed. The project cost determined from the developed correlations is validated by the cost data collected from recently developed projects. It has been found that the developed correlation for cost may be used for reasonable cost estimation of hydropower projects for planning of such
作者: GROWL    時(shí)間: 2025-3-29 02:56





歡迎光臨 派博傳思國(guó)際中心 (http://www.pjsxioz.cn/) Powered by Discuz! X3.5
罗山县| 昌黎县| 深水埗区| 南木林县| 淮阳县| 富川| 克拉玛依市| 绩溪县| 大英县| 乡城县| 黄骅市| 无为县| 丹阳市| 开鲁县| 临泉县| 巢湖市| 德惠市| 句容市| 东海县| 奉化市| 阜阳市| 德令哈市| 东辽县| 衡水市| 类乌齐县| 镇安县| 曲阜市| 金坛市| 安国市| 永德县| 莱芜市| 洱源县| 连江县| 基隆市| 汾西县| 庐江县| 诸暨市| 格尔木市| 葵青区| 峨山| 大连市|