派博傳思國(guó)際中心

標(biāo)題: Titlebook: Anticipated and Abnormal Plant Transients in Light Water Reactors; Volume 1 Pamela L. Lassahn,Debu Majumdar,George F. Brockett Book 1984 Sp [打印本頁(yè)]

作者: Forestall    時(shí)間: 2025-3-21 19:12
書目名稱Anticipated and Abnormal Plant Transients in Light Water Reactors影響因子(影響力)




書目名稱Anticipated and Abnormal Plant Transients in Light Water Reactors影響因子(影響力)學(xué)科排名




書目名稱Anticipated and Abnormal Plant Transients in Light Water Reactors網(wǎng)絡(luò)公開度




書目名稱Anticipated and Abnormal Plant Transients in Light Water Reactors網(wǎng)絡(luò)公開度學(xué)科排名




書目名稱Anticipated and Abnormal Plant Transients in Light Water Reactors被引頻次




書目名稱Anticipated and Abnormal Plant Transients in Light Water Reactors被引頻次學(xué)科排名




書目名稱Anticipated and Abnormal Plant Transients in Light Water Reactors年度引用




書目名稱Anticipated and Abnormal Plant Transients in Light Water Reactors年度引用學(xué)科排名




書目名稱Anticipated and Abnormal Plant Transients in Light Water Reactors讀者反饋




書目名稱Anticipated and Abnormal Plant Transients in Light Water Reactors讀者反饋學(xué)科排名





作者: achlorhydria    時(shí)間: 2025-3-21 22:56

作者: refraction    時(shí)間: 2025-3-22 03:08
https://doi.org/10.1007/978-3-322-89278-2room indication was lost. Safety Features actuated on low pressure following the reactor trip. When power was restored an hour and a quarter later, temperature had dropped to 285°F. The Reactor Coolant System was outside of its allowable pressure/temperature curve.
作者: Constrain    時(shí)間: 2025-3-22 07:37

作者: Herpetologist    時(shí)間: 2025-3-22 08:49
978-1-4684-4801-6Springer Science+Business Media New York 1984
作者: 作繭自縛    時(shí)間: 2025-3-22 16:42
Schritte der Kostenoptimierung,Good evening. I extend my warm greetings to you. Especially to those of you who are members of the American Nuclear Society and whose reasoned judgment and clear perception of merit led you to vote for me in the recent Society election.
作者: 縮減了    時(shí)間: 2025-3-22 18:34
Georg Reddewig,Hans-Achim DubberkeIf there is one thing we know, it is that reactor transients have serious economic impact. If we number that point (1), I would like to suggest two more:
作者: 變色龍    時(shí)間: 2025-3-23 00:16
https://doi.org/10.1007/978-3-322-96170-9Others from INPO will be discussing specific findings involving plant transients. I will discuss some aspects of the Significant Event Evaluation and Information Network, or SEE-IN program, some general findings that pertain to nuclear plant trips and scrams, and some of the things we’ve learned while managing the SEE-IN program.
作者: 使?jié)M足    時(shí)間: 2025-3-23 02:12
Einkaufsst?ttenwahl von KonsumentenElectricité de France has set up an organization to collect and analyse the incidents, implement corrective actions and memorize the lessons learned.
作者: Original    時(shí)間: 2025-3-23 09:34

作者: BRAWL    時(shí)間: 2025-3-23 10:30
Transients — Abnormal and OtherwiseGood evening. I extend my warm greetings to you. Especially to those of you who are members of the American Nuclear Society and whose reasoned judgment and clear perception of merit led you to vote for me in the recent Society election.
作者: antecedence    時(shí)間: 2025-3-23 16:12
The Economic Impact of Reactor TransientsIf there is one thing we know, it is that reactor transients have serious economic impact. If we number that point (1), I would like to suggest two more:
作者: mydriatic    時(shí)間: 2025-3-23 20:24

作者: Obstacle    時(shí)間: 2025-3-23 22:33

作者: pericardium    時(shí)間: 2025-3-24 04:42

作者: 說(shuō)不出    時(shí)間: 2025-3-24 10:12
Opportunities for Practical Improvements in the Management of Plant Transients (Opening Address)ination of activities which are involved in improving our ability to recognize, diagnose, and manage safe and undamaging responses to transients. This conference brings together most of the activities involved.
作者: intolerance    時(shí)間: 2025-3-24 12:26
Experience in Plant Transients the Swedish RKS Programy not a post-TMI-concept. However, the accident that occurred at Three Mile Island 2 in March 1979 demonstrated that a more structured system for experience feedback was needed to ensure a cumulative learning process from precursor incidents and transients.
作者: ERUPT    時(shí)間: 2025-3-24 18:52

作者: 江湖騙子    時(shí)間: 2025-3-24 20:32
http://image.papertrans.cn/a/image/158498.jpg
作者: 萬(wàn)花筒    時(shí)間: 2025-3-25 01:04
Ordnungsrahmen Einkaufsmanagement,ination of activities which are involved in improving our ability to recognize, diagnose, and manage safe and undamaging responses to transients. This conference brings together most of the activities involved.
作者: 學(xué)術(shù)討論會(huì)    時(shí)間: 2025-3-25 03:33

作者: engrossed    時(shí)間: 2025-3-25 09:28

作者: 黃油沒有    時(shí)間: 2025-3-25 13:17

作者: Kindle    時(shí)間: 2025-3-25 17:29

作者: 使無(wú)效    時(shí)間: 2025-3-25 21:08
Die Vorbereitung der Einkaufsverhandlung,y not a post-TMI-concept. However, the accident that occurred at Three Mile Island 2 in March 1979 demonstrated that a more structured system for experience feedback was needed to ensure a cumulative learning process from precursor incidents and transients.
作者: 厭倦嗎你    時(shí)間: 2025-3-26 02:47
,Einkaufsverhandlungen (aus-)führen,support of licensing application and plant operation. Three kinds of model, two sets of input base deck for each, have been developed. Plant start-up transient recorder (STARTREC) data are used to benchmark RETRAN models for the transients and FSAR data for the accidents. Establishment of a well pre
作者: entitle    時(shí)間: 2025-3-26 05:57

作者: Liability    時(shí)間: 2025-3-26 09:59
https://doi.org/10.1007/978-3-322-89278-2room indication was lost. Safety Features actuated on low pressure following the reactor trip. When power was restored an hour and a quarter later, temperature had dropped to 285°F. The Reactor Coolant System was outside of its allowable pressure/temperature curve.
作者: 干涉    時(shí)間: 2025-3-26 16:36
The Risk from Transients According to Probabilistic Risk Assessment (PRA)have to do with the rate and magnitude of rapid pressure increases due to steam generation from the interaction of core debris with water. Some of the concern for these types of transients has subsided with a greater understanding of their contribution to risk. This is because without a simultaneous
作者: 保留    時(shí)間: 2025-3-26 17:09
Taipower Experience in Plant Transientsr. Four NOTEPAD activities relating to operation and maintenance data are selected for recatego-rization and supplemented by Taipower operating experience and USNRC IE Bulletins. The key words are used by four hierarchial levels for easy retrieval.
作者: 死貓他燒焦    時(shí)間: 2025-3-26 21:22

作者: 無(wú)價(jià)值    時(shí)間: 2025-3-27 02:55

作者: Mendicant    時(shí)間: 2025-3-27 06:35

作者: Endearing    時(shí)間: 2025-3-27 10:47

作者: GREEN    時(shí)間: 2025-3-27 14:51

作者: hypnotic    時(shí)間: 2025-3-27 21:39
Questions and Answers Plant Transient Experience Base
作者: 不能仁慈    時(shí)間: 2025-3-27 23:21

作者: 共同生活    時(shí)間: 2025-3-28 05:21
Pamela L. Lassahn,Debu Majumdar,George F. Brockett
作者: HATCH    時(shí)間: 2025-3-28 07:01

作者: Influx    時(shí)間: 2025-3-28 12:10

作者: 惰性氣體    時(shí)間: 2025-3-28 16:19
Operational Transients, A Definition concern that the frequency or the consequences of transients are often inadvertently increased. 10CFR50.59 defines a review process to determine if a design change produces a change in frequency or consequence. However, it is intended to address only design changes. It will not capture changes due
作者: agenda    時(shí)間: 2025-3-28 19:59

作者: Ibd810    時(shí)間: 2025-3-29 02:42
How does the NRC Treat Operational Experience and What is it Telling Us?sment program had been the large number (10 to 15 per day) of Licensee Event Reports (LERs) coupled with the nonstandard design of U.S. reactors, the inadequacies and non-uniformity of the licensee reports, and the difficulty of determining the root cause of an event and identifying its implications
作者: Semblance    時(shí)間: 2025-3-29 04:58

作者: Commission    時(shí)間: 2025-3-29 10:53
Experience in Plant Transients the Swedish RKS Programy not a post-TMI-concept. However, the accident that occurred at Three Mile Island 2 in March 1979 demonstrated that a more structured system for experience feedback was needed to ensure a cumulative learning process from precursor incidents and transients.
作者: BALE    時(shí)間: 2025-3-29 13:40
Taipower Experience in Plant Transientssupport of licensing application and plant operation. Three kinds of model, two sets of input base deck for each, have been developed. Plant start-up transient recorder (STARTREC) data are used to benchmark RETRAN models for the transients and FSAR data for the accidents. Establishment of a well pre
作者: PATRI    時(shí)間: 2025-3-29 16:49
Ginna Steam Generator Tube Rupturethe incident, the plant, a two-loop Westinghouse design, had been operating at full power with no indications of primary to secondary leakage. The incident resulted in activation of on-site and off-site emergency plans. Established plant emergency response procedures were used to bring the plant to
作者: VICT    時(shí)間: 2025-3-29 22:23

作者: 我不重要    時(shí)間: 2025-3-30 01:28

作者: condone    時(shí)間: 2025-3-30 07:42

作者: 貪婪的人    時(shí)間: 2025-3-30 09:29
How does the NRC Treat Operational Experience and What is it Telling Us?anization. Further, since the NRC program was not well coordinated, each organization often faced the whole job of collecting, reading, and analyzing the events and feeding back the lessons. No single NRC or industry organization had the resources to do the entire job; consequently, only bits and pieces were done and in a somewhat ad hoc manner.
作者: 多節(jié)    時(shí)間: 2025-3-30 14:21
The NEA Incident Reporting System : Description, Experience, First Resultsed..The paper gives some details of the IRS mechanism and discusses the reporting criteria used and the information included in the reports. Areas of concern identified from reported incidents, and some examples of lessons learned are also discussed.
作者: 劇本    時(shí)間: 2025-3-30 19:38
Operational Transients, A Definitionto operator actions or due to inadequate design review. Some of the causes of the increased frequency of occurrence are discussed and specific examples provided. Finally, a means for preventing this phenomenon is described.
作者: ABHOR    時(shí)間: 2025-3-30 23:32

作者: incarcerate    時(shí)間: 2025-3-31 01:04

作者: Compatriot    時(shí)間: 2025-3-31 06:37
Ginna Steam Generator Tube Ruptureident resulted in activation of on-site and off-site emergency plans. Established plant emergency response procedures were used to bring the plant to a cold shutdown condition. Unexpected operational occurrences will be discussed along with procedure, training, and hardware changes which have occurred as a result of post-incident reviews.
作者: QUAIL    時(shí)間: 2025-3-31 10:27

作者: overreach    時(shí)間: 2025-3-31 15:11
Steuerung der Lieferantenbasis,to operator actions or due to inadequate design review. Some of the causes of the increased frequency of occurrence are discussed and specific examples provided. Finally, a means for preventing this phenomenon is described.
作者: CLEAR    時(shí)間: 2025-3-31 19:57

作者: palliative-care    時(shí)間: 2025-3-31 23:26

作者: 地殼    時(shí)間: 2025-4-1 05:09
G. H. Mickisch,M. M. Gottesman,I. Pastan material bed process, material deposition process and motionless material process. This classification allowed to accommodate all existing AM processes. Besides, this classification provides plenty of space to accommodate future AM processes.
作者: micronized    時(shí)間: 2025-4-1 08:47

作者: CAMP    時(shí)間: 2025-4-1 12:55





歡迎光臨 派博傳思國(guó)際中心 (http://www.pjsxioz.cn/) Powered by Discuz! X3.5
临潭县| 平远县| 任丘市| 土默特左旗| 友谊县| 江津市| 龙陵县| 宽城| 普陀区| 衡山县| 宁南县| 邯郸县| 桓仁| 肥西县| 金沙县| 阳江市| 安远县| 黄石市| 苏尼特左旗| 嵊州市| 灵宝市| 麦盖提县| 贺州市| 南城县| 抚顺市| 崇左市| 泽普县| 慈溪市| 墨竹工卡县| 新疆| 顺平县| 津南区| 冷水江市| 黄骅市| 兰西县| 鄄城县| 阳西县| 定南县| 建平县| 凌海市| 治多县|